HomeMy WebLinkAboutFOX MEADOWS BUSINESS PARK NO. 3 REPLAT, TIMBERLINE PLAZA - FDP - 19-05B - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEET0
Final Plan Routing Sheet
Item: 09 O'i�fi0 OW .1 � �/J'/N�S.1' *0"A- W AV7 A 6a
This project went to I has been scheduled for Public Hearing on:
The following table lists final plan submittal requirements for this project
A final fee of $1,000.00 is required at the time of submittal unless otherwise waived or reduced. �' • QS`f��
Fee Waiver/Reduction Approval:
Amount: �t"/CMG t /oz,
Date: 3 - ,�Z - c-7 Items Requested Redlines
•'� c cco o � � m
Planner: / v• a N n c ° E 13 c a
c
a> o m 'a a,
a n m m E n o .Z a d n m
�� 4 a > m a w m ?, Q a
Engineer: ¢ 0 z C - N
_
w < so J n
J O `� J
File: Project Planner
2
Y:
X
X-
Advance Planning
Building Inspection
Comcast
Engineering
2
Engineering Pavement
Forestry
GIS
co
Light & Power
x
'
m
LL h�ratResources'„
o
Neighborhood Services
d
Park Planning
Q
Poudre Fire AuthorityX
Post Office
Qwest
ROW Piannin
Stormwater
is
2
X
Street Oversizin
Technical Services
Traffic Operations
Transfort
Transportation Planningx
Water & Wastewater/
x,
Water Drstnct
Water Conservation
Xcel Energy
ZoningX
X
County Assessor
CDOT
m
Ditch Cc:
o
m
Railroad:
=
REA/DOE/PRPA
w
Schools: Poudre/Thompson
Total to be Submitted
73
%
oZ
a1
j
-71