HomeMy WebLinkAboutSPRING CANYON COMMUNITY PARK - FDP - 20-05/A - CORRESPONDENCE -REVISION ROUTING SHEET
Item: Pt:,,a �rT6,,•� Cu�,.•rwn ;t v P1
Date Received: Planner:
Engineer: )0. D.
Cfri of FoR Cnliins
Ci7RR8'NT PLANNIIdG
i • •' •
■■■■■■■■■■■■■■■■
Engineering
Engineering Pavement
Light & Power
Natural Resources
Park Planning
Post Mce
ROW PlanningStormwater
■■■■■■■■i■■■■■■■■
Street Oversizin
Technical Services
Transportation PlanninA=MMMMMMMMMMMMMWater
■■
& Wastewater
Water
ConservationWater
■■■■■■■■■i■■■■■■
_■■■■■■
MMMM■■■■■■
•
■■■■■■■■■■■■■■■■
the lines connecting to the 20-inch. Provide calculations for the required restrained lengths
and note it at the points of connection.
Number: 141 Created: 11 /3/2005
[1/10/06] Mains not shown. (Sheets C3.1 & C3.2)
[11/3/05] Show alignment of 60-inch and 20-inch water mains on Horsetooth Road street
plan.
Number: 160 Created: 1 /10/2006
[1/10/06] See plans for other comments.
Be sure and return all red -lined plans if / when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at 221-6341.
Y�oouurrs� Truly,
Steve Steve Olt
City Planner
Page 4
Topic: PV and L crossing
Number: 25 Created: 5/3/2005
[1 /13/06]
[11/7/05] Approval of PV&L Canal Company needed prior to plan approval.
[5/3/05] Please show the proposed crossing of the PV and L Canal as proposed in the
Spring Creek master plan. Canal crossing structure will need to be approved by the ditch
company.
Topic: Utility Plans
Number: 92
[1/6/06]
Created: 10/31 /2005
Please remove revision bubbling from plans, as these plans are not finalized yet.
Please use an updated City of Fort Collins water quality pond detail. A CAD drawing of this
detail can be e-mailed to you upon request.
[10/31/05] Please provide a manhole for Line F within the pond embankment for
maintenance access.
Thank you for adding that.
Why not tie line E from detention Pond C into the proposed manhole where line D ties into
the trunk line.
Please show the proposed drop structures in the Spring Creek channel on the plans and
provide a detail for these structures on the plans.
Please reference a specific rip rap detail for all proposed riprap.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: Water/WW
Number: 135 Created: 11 /3/2005
[1/10/06] This must be must be done prior to finalizing plans to determine if grade of 8-inch
sewer needs to be changed to allow future connection to the south.
[11/3/05] Provide field data on the elevation of the 60-inch and 20-inch water mains
opposite of Horsetooth Circle to see if sanitary could be extended in future. The 8-inch
sewer may need to be installed at minimum grade (0.4 %) to accomplish this. (This is a
repeat comment that Jeff Hill had made previously.)
Number: 137 Created: 11 /3/2005
[1/10/06] Cathodic protection (CP) isolation must be provided at every connection to the 20-
inch main. CP details not found in plans.
[11/3/05] The 20-inch water main is cathodically protected; therefore, all connections to this
main must be isolated. Include appropriate notes and details on the utility plans.
Number: 139 Created: 11 /3/2005
[1/10/06] Clearly note locations where restrained joints required on 6-inch water mains and
provide calculations on the required lengths of restrained joint pipe.
[11/3/05] The distance between the 60-inch and 20-inch mains will prevent the use of thrust
blocks at the connections to the 20-inch; therefore, it will be necessary to restrain joints on
Page 3
Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamdan
Topic: Channel Grading
Number: 113 Created: 11 /1 /2005
[1/6/06] Please submit a floodplain modeling report.
[11/1/05] There are areas in the channel that will experience high velocities according to the
provided HEC-RAS modeling. Provide turf reinforcing mats at these locations.
Topic: Drainage Report
Number: 79
[1 /13/06]
Created: 7/12/2005
[7/12/05] Please provide a modeling report for the Spring Creek flows.
Topic: Erosion Control
Number: 143 Created: 11 /7/2005
[1 /13/06]
[11/7/05] November 3, 2005
Current City notes for sediment/erosion control need to be on the plan, the old set of notes
must be deleted.
It would probably be easiest if we scheduled a meeting to go over this plan. Please give
Bob Zakely a call, 224-6063.
Topic: Floodplain Comments
Number: 162 Created: 1 /17/2006
[1 /17/06]
Susan Hayes: 1-13-06
1. Landscaping Plan:
a. Please clarify the landscaping proposed for the large detention pond berm. There
appears to be a rock wall, and many trees on the berm. Is this appropriate and
acceptable to FEMA? We need to discuss this in more detail since changes to the
Landscaping Plan may be required. (REPEAT) Please call to set up a meeting.
2. Drainage/Grading Plan
a. Please add the floodway boundaries to the Revised Floodplain sheets and show
the 100-year boundary more clearly.
b. Please see comment 3 regarding information to include on the drawing regarding
the restroom construction.
3. Drainage Report
a. Based on the elevations stated in the report, the restroom appears to be in a
location already elevated above the floodplain. Is this true? It is not mapped that
way on the floodplain map, however. If the structure is in a mapped floodplain,
please provide a table showing the specific BFE at the upstream end of the
structure, regulatory BFE (BFE plus 18 inches), lowest floor elevation, type of
foundation, and lowest HVAC elevation in the report AND ON THE PLANS.
Page 2
6a STAFF PROJECT REVIEW
City of Fort Collins
BHA Design, Inc. Date: 01/24/2006
c/o Russell Lee
4803 Innovation Drive
Fort Collins, CO 80525
Staff has reviewed your submittal for SPRING CANYON COMMUNITY PARK, FINAL
PLANS, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Dan DeLaughter
Topic: General
Number: 155 Created: 12/30/2005
[12/30/05] All private water and sewer mains should be within a utility easement (services
do not need to be), and the owner must sign off on the plat, utility plans, site, and landscape
plans. Signature block should be included for the Ditch Company and Fort Collins Loveland
Water District/South Fort Collins Sanitation District on every sheet (or at least for sheets of
concern), especially detail sheets.
Number: 156 Created: 12/30/2005
[12/30/05] Scannability is still an issue. Please consult JR Wilson in Technical Services
regarding the line types and line weights used.
Number: 157 Created: 12/30/2005
[12/30/05] For Horsetooth Road reconstruction, you need to specify the limits of
replacement and mill and overlay of pavement
Topic: Plat
Number: 161 Created: 1 /11 /2006
[1/11/06] Technical Services Comments:
1. Legal does not close, boundary closes, legal does not match the plat.
2. Typos & bold text (see redlines).
3. Is there a need for more Horsetooth Road Alignment Area?
Department: Natural Resources Issue Contact: Doug Moore
Topic: General
Number: 158 Created: 1 /10/2006
[1/10/06] Repeat Comment: Natural Habitats and Features buffer needs to be shown in the
correct location. Please do not label the actual distance since this buffer zone distance
varies and is not always 100'.
Number: 159 Created: 1 /10/2006
[1/10/06] Repeat Comment: Show the L.O.D. (Limits of Development) on all related drawing
(including construction drawing), as include a detail showing how the protective fencing will
be installed at these locations.
Page 1