22. The construction phase will require a Fugitive Dust Permit from the Larimer
County Health Department. Also, trash enclosures should be sized to
accommodate various containers for recycling. A single trash hauler should be
used. For further information on natural resource issues, please contact Doug
Moore, at 221-6750.
23. For an estimate of the Capital Improvement Expansion Fee, payable at the time
of building permit issuance, please contact the Building Inspection Division, 221-
6760. This fee is adjusted annually.
24. The architectural character of the building must conform to the other approved
buildings in the office/retail center to the north.
25. As a Type II use, a neighborhood information meeting is required. Please
contact the Current Planning Department to initiate this meeting. We will prepare
a notification map. The applicant provides the list of the property owners within
the notification area, plus $.50 cents per name. We will arrange for the meeting
location and facilitate the meeting.
26. The City of Fort Collins Utilities provides information regarding how the building
orientation and design can contribute to the conservation of energy. Please
contact Gary Schrader, 221-6700, for further information on this innovative
program.
27. Be sure to provide sufficient area within the trash enclosure for containers for
recyclable materials. Staff has guidelines on how to properly size a trash
enclosure based on various dumpster and container sizes.
R
12. Please be cautioned that any construction activity off -site will require an
easement from the property owner.
13. Timberline Road is classified as a major (six -lane) arterial. As such,
development of the subject parcel will require dedication of additional right-of-
way so that there is 70.5 feet from centerline of the roadway to property line. In
addition, a 15-foot utility easement is needed behind the right-of-way line. These
dedications may or may not have already been made by previous plats.
14. The developer must design the public improvements, if needed, in conjunction
with the recently -constructed Fox Meadows Apartments.
15. Public improvements shall comply with Larimer County Urban Area Street
Standards. One of these requirements is that the first parking stall must be
setback from Bighorn Drive between 40 — 50 feet, depending on the traffic
volume on Bighorn as stated in the T.I.S.
16. The standards require that the curb cut on Bighorn be designed as a driveway
versus a curb cut with a turning radius. If a turning radius is needed for the
trucks, however, then a variance must be submitted to the City Engineer for
consideration. This is an administrative variance that is not forwarded to the
Planning and Zoning Board.
17. Existing sidewalks may be retained. (The walk on Bighorn is six feet wide and
attached but the standard is detached.) Be sure the walk on Timberline Road is
placed within the public right-of-way or within a publicly dedicated access
easement.
18. Utility Plans will be needed at the time of submittal. A Development Agreement
will be required prior to recording final documents. A Development Construction
Permit will be required prior to beginning site work. For further information,
please contact Marc Virata, 221-6605.
19. In the ultimate long-range design, Timberline will be a six lane arterial. A median
will reduce the turning movements at Bighorn to 3/ turns (no left -out) or to right-
in/right-out only. In the short range, the T.I.S. may call for a "porkchop" island to
restrict turn movements to right-in/right-out without the benefit of a median in
Timberline.
20. Be sure to provide bike parking near all customer entrances.
21. A sidewalk must connect the entrance of the building to Bighorn without crossing
a parking lot drive aisle
5
found to be as maintenance free as more contemporary methods. If additional
capacity is needed, then Staff recommends that the water quality feature be
upgraded at the same time to avoid excessive clogging. Development
Agreements for the two previously approved Fox Meadows filings indicate that
the pond is to be jointly maintained by all three entities. The outfall for this site is
already in place so there is a limited capacity that will need to be maintained.
The pond outfall is the Sunstone Channel. For further information, please
contact Glen Schlueter, 221-6700.
6. There is an existing 8-inch water main and an existing 8-inch sewer main in
Bighorn Drive which are available to serve the site. (There is an existing 16-inch
water line on the west side of Timberline Road but this main is too far away and
too large to tap.) A separate fire line will be needed if any of the proposed uses
require an automatic fire extinguishing system. If two buildings are proposed,
then each building must have its own water and sewer services.
7. The water conservation standards for landscape and irrigation will apply to the
project. Development fees, water rights will be due at time of building permit.
Please be aware that the Water and Sewer Department of Fort Collins Utilities
has implemented a plan check fee. For further information, please contact Roger
Buffington, 221-6681.
8. The site will be served by the Poudre Fire Authority. They will require that a fire
hydrant be within 300 feet of the building capable of delivering a minimum of
1,500 gallons per minute at 20 p.s.i. The address must be visible from Bighorn
Drive. If any of the proposed uses includes 5,000 square feet or more of floor
area that is not "fire -contained," then an automatic fire extinguishing system is
required.
9. The fire access road to the building must feature a loop so the fire equipment can
get back out to Bighorn Drive. Be sure that the turning radii is 25-foot inside and
50-foot outside in accordance with the specifications of P.F.A. Designated fire
lanes must feature curbs painted red and "No Parking — Fire Lane" signs. For
further information, please contact Ron Gonzales, 221-6570.
10. The exact amount of the Street Oversizing Fee will depend on the land use and
trip generation. These fees are payable at the time of building permit issuance.
Keep in mind fees are adjusted annually. In addition, the City collects the
Larimer County Road Fee. For further information, please contact Matt Baker,
221-6605.
11. A Transportation Impact Study will be required which will address all modes.
Check with Eric Bracke, 221-6630, to determine the scope of the study. Keep in
mind that the intersection of Timberline and Bighorn will not be signalized due to
proximity to Horsetooth and Caribou. If a recent T.I.S. was done, it may be
updated.
n
analyzed the parking demand and supply at the Fort Collins Club in light of the
recent construction of several condominium units that replaced available parking.
This study revealed a parking ratio that may work for the activities proposed for
Colorado Health and Fitness. For this particular site, the parking lot must be
landscaped, especially along the east edge where it is visible from the existing
neighborhood. Finally, 10% of the interior parking lot must be landscaped.
3. The build -to line along Timberline is between 10 and 25 feet subject to respecting
existing or proposed right-of-way and easements for utilities. The build -to line
along Bighorn is 15 feet.
4. There is existing three-phase electrical power along Timberline at the northwest
corner of the site so there is sufficient available power to serve the proposed use.
The location of the transformer must be coordinated with Light and Power. The
transformer must be both accessible (within ten feet) to hard surface for
emergency change -out and screened for aesthetic purposes, if visible from a
public street or the neighborhood. Meters should be screened as well, especially
if visible from Timberline Road. Any modification to the existing system would be
at the developer's expense. A Commercial One ("C-1 ") Form must be completed
by a licensed electrical contractor. Please refer to the hand-out describing the
development fees and charges. Street trees in the parkway strip must be kept 40
feet from streetlights. Ornamental trees must be kept 15 feet from streetlights.
For further information, please contact Alan Rutz, 221-6700.
5. This site is in the Fox Meadows drainage basin where there new development
fee is $6,468 per acre, subject to the runoff coefficient and amount of impervious
surface. The standard drainage and erosion control reports and construction
plans are required and they must be prepared by a professional engineer
registered in Colorado. Onsite detention is required for both quantity and for
water quality. Water quality is usually provided by extended (40 hours)
detention. The site is on Stormwater inventory map #120. A copy can be
obtained from the Utilities office at 700 Wood Street.
6. The existing detention pond serves the existing Fox Meadows Apartments and
the approved but not built office and retail tract just to the north across Bighorn
Drive. This pond will need to be expanded to accommodate the new
imperviousness. Water quantity detention to meet the present rainfall criteria
needs to be added to the existing pond or provided onsite. Extended detention
for water quality is required and can be provided onsite or if added to the existing
pond, the sizing will need to include all areas draining to the pond. If the
applicant and owner believe the pond was upgraded to include this site with the
previous filings, then, the applicant's engineer will need to verify this capacity and
provide the documentation. The applicant also showed pictures that show a
water quality riser so the pond may have been sized to include extended
detention. Again, the design engineer will need to provide the documentation to
show this site was included. This type of water quality technique is no longer
3
0000
CONCEPTUAL REVIEW STAFF COMMENTS
City of Fort Collins
ITEM: Colorado Health and Fitness/Wellness Membership Club at
Tract B, Fox Meadows Business Park at the Southeast
Corner of Timberline Road and Bighorn Drive
MEETING DATE: May 17, 2005
APPLICANT: Mr. Cliff Buchholtz c/o Ms. Linda Ripley, V-F Ripley and
Associates, 401 West Mountain Avenue, Fort Collins, CO
80521.
LAND USE DATA: Request for a Health and Membership Club consisting of two (but
could be combined into one) buildings on approximately two acres located at the
southeast corner of Timberline Road and Bighorn Drive. The proposed building(s) is
one-story and contains approximately 14,000 square feet. Activities within the club are
anticipated to include general exercise, aerobics, yoga, pilates, rehabilitation, day spa
and tanning booth. A portion of the club may be set aside exclusively for women. The
site abuts an existing stormwater detention pond to the east and the Sunstone drainage
channel to the south.
COMMENTS:
The site is zoned E, Employment. The proposed use, Health and Membership
Club, is permitted subject to review by the Planning and Zoning Board (Type Two
Review). The use is also considered a secondary use versus a primary use
which means it cannot occupy more than 25% of the development plan. On April
21, 2005, however, the Planning and Zoning Board granted approval of a
Modification of Standard to allow a Health and Membership Club to occupy 100%
of the development plan at this location. This Modification is valid for one year.
For further information regarding this Modification, please refer to Planning File
#19-05.
2. The minimum parking requirement for a Health and Membership Club is not
specified. There is a minimum requirement, however, for Recreational Uses but
only if located in a residential zone. This requirement is one space per four
persons maximum rated capacity. Although the subject site is located in the
Employment zone, the specification of one space per four persons maximum
rated capacity is a guideline that may have validity. In the past, Staff has
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES E81 N. College Ave. PO. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
CURRENT PLANNING DEPARTMENT
Community Planning and Environmental Services
Current Planning
City of Fort Collins
May 23, 2005
Ms. Linda Ripley
V-F Ripley
401 West Mountain Avenue
Fort Collins, CO 80521
Dear Ms. Ripley:
For your information, attached is a copy of the Staffs comments for the Colorado
Health and Fitness/Wellness Center, Tract B, Fox Meadows Business Park, at the
Southeast Corner of Timberline Road and Bighorn Drive which was presented
before the Conceptual Review Team on May 16, 2005
The comments are offered by staff to assist you in preparing the detailed components of
the project application. Modifications and additions to these comments may be made at
the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in the
review process, please feel free to call me at 970-221-6750.
Sincerely,
Ted Shepard
Chief Planner
cc: Project Planner
File
281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020