HomeMy WebLinkAboutSPRING CANYON COMMUNITY PARK - PDP - 20-05 - REPORTS - RECOMMENDATION/REPORTSpring Canyon Community Park, Project Development Plan, #20-05
September 8, 2005 Administrative Hearing
Page 5
These buildings are internal to the 123 acre park site and relate to
the various park activities. They are unique to the specific park
theme.
2. Section 3.5.3, Mixed Use, Institutional and Commercial Buildings
The proposed public buildings in this community park are situated
internal to the site and relate to the various activities within the
park. Although it is infeasible for the buildings to meet the "build -to"
line standards there is a network of pedestrian trails within the park
that provide direct access from the buildings to adjacent street
sidewalks and into the surrounding neighborhoods without having
to make many driveway crossings.
4. Neighborhood Information Meeting
The Spring Canyon Community Park, PDP contains a proposed land use
that is permitted as a Type 1 use, subject to an administrative review. The
proposed use is a community park. The LUC does not require that a
neighborhood meeting be held for a Type 1 development proposal and a
City -facilitated neighborhood meeting was not held to discuss this
proposal. However, the City's Parks Planning Department and their
planning/design consultants from the private sector did conduct several
open houses and public outreach meetings prior to formal submittal of the
park plans to the City for development review.
FINDINGS OF FACT/CONCLUSIONS
After reviewing the Spring Canyon Community Park, Project Development Plan,
staff makes the following findings of fact and conclusions:
1. The proposed land use is permitted in the POL — Public Open Lands
zone district.
2. The Project Development Plan complies with all applicable General
Development Standards contained in Article 3 of the Land Use Code.
RECOMMENDATION:
Staff recommends approval of the Spring Canyon Community Park, Project
Development Plan - #20-05.
Spring Canyon Community Park, Project Development Plan, #20-05
September 8, 2005 Administrative Hearing
Page 4
e. The proposal complies with Section 3.2.1(E)(4)(b) in that the on -
site parking areas will be screened from West Horsetooth Road
to the south by a distance separation of approximately 180', with
significant earthen berming and landscaping in the setback.
f. The proposal complies with Section 3.2.1(E)(5) in that it will
provide at least 10% interior landscaping in the parking areas,
satisfying the minimum requirement.
2. Section 3.2.2, Access, Circulation and Parking
a. The proposal complies with Section 3.2.2(C)(4)(a) in that it
provides secure and conveniently located bicycle parking in the
amount of approximately 18% of the total number of automobile
parking spaces on -site, exceeding the minimum requirement of
5%.
b. The proposal complies with Section 3.2.2(C)(5) in that it
provides direct, safe, and continuous walkways and bicycle
connections to major pedestrian and bicycle destinations in the
surrounding area.
c. The proposal complies with Section 3.2.2(D) in that it provides
for safe, convenient, and efficient bicycle, pedestrian, and
vehicular movement to and through the site. Vehicular access to
the park will occur via a curb cut from West Horsetooth Road (at
the south end of the park) and an access road from the south
end of Overland Trail (at the northwest corner of the park).
B. Division 3.3, Engineering Standards
1. Section 3.3.5, Engineering Design Standards
The proposal complies with the design standards, requirements,
and specifications for the services as set forth in this section.
C. Division 3.5, Building Standards
1. Section 3.5.1, Building and Project Compatibility
The proposed community park contains a total of 4 buildings. They
include the park's maintenance facility and the 3 restroom facilities.
Spring Canyon Community Park, Project Development Plan, #20-05
September 8, 2005 Administrative Hearing
Page 3
2. Division 4.10 of the Land Use Code, Public Open Lands Zone District
The proposed use of a community park is permitted in the POL zone
district subject to an administrative review. This proposal complies with
the purpose of the POL District as it is a public community park, with a
community -wide emphasis and intended service, which warrants inclusion
in the POL District rather than in the surrounding RL — Low Density
Residential, UE - Urban Estate, or RF - Residential Foothills Districts.
3. Article 3 of the Land Use Code — General Development Standards
The Project Development Plan complies with all applicable General
Development Standards as follows:
A. Division 3.2, Site Planning and Design Standards
1. Section 3.2.1, Landscaping and Tree Protection
a. The proposal complies with Section 3.2.1(D)(1)(c) in that it
provides "full tree stocking" within 50' of the restrooms, pavilion
structures, and maintenance building, according to the
standards set forth in this section.
b. The proposal complies with Section 3.2.1(D)(2)(a) in that
canopy shade (street) trees are provided at a 25' to 35' spacing
in the parkway along West Horsetooth Road; and, at a 35' to 40'
spacing in the center median and along the east side of the
entry drive from Overland Trail at the northwest corner of the
park site.
c. The proposal complies with Section 3.2.1(D)(3) in that no one
species of the proposed new trees on the development plan will
exceed the allowable percentage (%) of the total number of
trees on -site.
d. The proposal complies with Section 3.2.1(E)(4)(a) in that trees
are provided at a ratio of at least 1 tree per 25 lineal feet along
West Horsetooth Road south of the parking lots.
Spring Canyon Community Park, Project Development Plan, #20-05
September 8, 2005 Administrative Hearing
Page 2
standards located in Division 3.2 - Site Planning and Design Standards
and Division 3.5 - Building Standards of ARTICLE 3 - GENERAL
DEVELOPMENT STANDARDS; and
the proposed use of a community park is permitted in Division 4.10
Public Open Lands (POL) of ARTICLE 4 — DISTRICTS, subject to an
administrative review.
Parks (except neighborhood parks) are permitted in the POL — Public Open
Lands Zoning District, subject to administrative (Type 1) review. The purpose is:
The Public Open Lands District is for large publicly owned parks and open
lands which have a community -wide emphasis or other characteristics
which warrant inclusion under this separate designation rather than
inclusion in an adjoining neighborhood or other District designation.
This proposal complies with the purpose of the POL District as it is a public
community park, with a community -wide emphasis and intended service, which
warrants inclusion in the POL District rather than in the surrounding RL - Low
Density Residential, UE - Urban Estate, or RF - Residential Foothills Districts.
COMMENTS:
Background
The surrounding zoning and land uses are as follows:
N: RF, RL;
S: POL, RL;
R2 in Larimer County;
E: UE, RL;
W: POL;
existing residential (Quail Hollow)
existing residential (Overland Hills, 2nd)
existing residential (Springfield)
existing residential and school (Tefft
Acres, Olander Elementary)
existing natural area (Pine Ridge)
The property was annexed in March, 1998 as part of the Pine Ridge,
Fourth Annexation.
The property has not previously been platted.
ITEM NO.
MEETING DATE
i STAFF���J�
City of Fort Collins HEARING OFFICER
STAFF REPORT
PROJECT: Spring Canyon Community Park, Project Development Plan
- #20-05
APPLICANT: BHA Design, Inc.
c/o Russell Lee
4803 Innovation Drive
Fort Collins, CO. 80525
OWNER: City of Fort Collins
Cultural, Library, and Recreational Services
215 North Mason Street
Fort Collins, CO. 80521
PROJECT DESCRIPTION:
This is a request for a 123.4 acre public community park to be owned,
constructed, and operated by the City of Fort Collins. The park will include a
maintenance building and storage yard, 3 restroom facilities, 9 pavilions, 2
unlighted ballfields, soccer fields and multi -purpose play area, 3 lighted tennis
courts (with space for 2 future courts), 3 basketball courts, 2 sand volleyball
courts, roller hockey rink, skate park, playgrounds, a dog park, and associated
parking areas containing 389 spaces. The site is located west of South Taft Hill
Road between West Drake Road and West Horsetooth Road. The property is in
the POL — Public Open Lands Zoning District.
RECOMMENDATION: Approval
EXECUTIVE SUMMARY:
This PDP complies with the applicable requirements of the Land Use Code
L( UC), more specifically:
the process located in Division 2.2 - Common Development Review
Procedures for Development Applications of ARTICLE 2 -
ADMINISTRATION;
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
PLANNING DEPARTMENT