HomeMy WebLinkAboutVERIZON WIRELESS FTC DRAKE CROSSING - PDP/FDP - FDP130032 - CORRESPONDENCE -Comment Numbb
Comment Originated: 08/21/2013
08/21/2013: EMERGENCY GENERATOR
The storage and use of diesel fuel, in conjunction with the diesel generator, shall comply with any
applicable sections of Chapter 34 of the International Fire Code on Flammable and Combustible
Liquids. The equipment shelter housing the generator shall be property signed and labeled.
Department: Stormwater Engineering
Contact: Jesse Schism, 970.218.2932, jschiam(a)fcoov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 08/01/2013
08/01/2013: No Comment from Erosion Control. This site; disturbs less than 10,000 sq-ft, is not in a
sensitive area, and is not in a larger development under construction. Therefore, no submittal of
erosion control material is needed. However, the site still must still be swept and maintained to
prevent dirt and other pollutants from entering the stone sewer or else BMPs will be required of the
site. If you need clarification concerning this, or if there are any questions please contact Jesse
Schlam 970-218-2932 or email @ jschlam@fcgov.com
Contact: Wes Lamarque, 970.416.2418, wlamaraue(a'lfcoov.com
Topic: General
Comment Number: 2
08/19/2013: No comments.
Department: Technical Services
Contact: Jeff County, 970.221.6588, icountv(e)fcoov.com
Topic: General
Comment Originated: 08/19/2013
Comment Number: 1 Comment Originated: 08/07/2013
08/07/2013: Please rotate the text marked on sheet A1.0, 180 degrees so it is read from the right side
of the sheet. See redlines.
Comment Number: 2 Comment Originated: 08/07/2013
0810712013: There is one line over text issue on sheet A3.0. See redlines.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970.221.6854, rbuffinaton(Mcgov.com
Topic: Site Plan
Comment Number: 1 Comment Originated: 08/22/2013
08/22/2013: Show existing water service, meter pit and fire line on the site plan.
Page 3of3
T—
Contact: Andrew Gingerich, 221.6603, aninnerichAfcoov.com
Topic: General
Comment Number: 1 Comment Originated: 08/20/2013
08/20/2013: From the plat of the Drake Crossing Center 2nd Filing it appears that there is a building
envelope surrounded by a blanket access and utility easement. Measuring from the plat and aerials it
appears that the new structure may just barely fit within the existing building envelope and potentially
encroach into the easement by 1- 2 feet. Please provide information confirming that the structure will
fit within the building envelope, otherwise we may need to proceed with vacating a small portion of the
blanket easement.
Comment Number: 2 Comment Originated: 08/20/2013
08/20/2013: An excavation permit will be required for any work within the right of way for tying in
communication lines.
Comment Number: 3
Comment Originated: 08/20/2013
08/20/2013: Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project,
shall be replaced or restored to City of Fort Collins standards at the Developers expense prior to the
acceptance of completed improvements and/or prior to the issuance of the first Certificate of
Occupancy.
Department: Environmental Planning
Contact: Lindsay Ex, 970.224.6143, lex0fcaov.com
Topic: General
Comment Number: 1
08/1312013: No comments.
Department: Light And Power
Contact: Rob Irish, 970-224-6167, ridsh(a)fcoov.com
Topic: General
Comment Originated: 08/13/2013
Comment Number. 1 Comment Originated: 08/14/2013
O8/14/2013: Existing transformer is a 500KVA 120/208v 3-phase. Any relocation or modification to the
existing electric facilities will incur system modification charges.
Comment Number: 2
Comment Originated: 08/14/2013
08/14/2013: A C-1 form and One -line diagram will need to be submitted to Light & Power Engineering
showing power requirements.
Comment Number: 3
Comment Originated: 08/14/2013
08/1412013: Owner will be responsible for Electric Capacity Fee and Building Site charges.
Contact Light & Power Engineering @ 970-221-6700.
Department: PFA
Contact: Jim Lynxwiler, 970.416.2869, ilynxwiler0poudre-fire.oro
Topic: General
Page 2 of 3
Fort Collins
August 23, 2013
Irene Cooke
Closser Consulting LLC
P.O. Box 423
Tabemash, CO 80478
RE: Verizon Wireless FTC Drake Crossing, FDP130032, Round Number 1
Community Development and
Neighborhood Services
281 North College Avenue
PO eox 580
Fort Collins, CO 80522
970.221.6760
970.224.6134 - fax
lcgov. com/developmentreview
Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of
the above referenced project. If you have questions about any comments, you may contact the individual
commenter or direct your questions through the Project Planner, Noah Beals, at 970-416-2313 or
nbeals@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Noah Beals, 970.416•2313, nbealsl�fcaov.com
Topic: General
Comment Number: 1
Comment Originated: 08/19/2013
08/22/2013: Applicant pointed out where this information has already been provided. No further action
is needed for this comment.
08/19/2013: Land Use Code (LUC) 3.8.13(C)(3) Roof monted equipment shall be located as far away
as possible for the roofs edge as possible. Please explain the proposed location and why it is as far
away from the roof edge as possible.
Comment Number: 2
Comment Originated: 08/19/2013
08/19/2013: LUC 3.18.13(C)(4) Along with the relocation of the two shurbs and one tree. Additional
landscaping should be added North of the equipment shelter.
Comment Number: 3
Comment Originated: 08/19/2013
08/19/2013: LUC 3.18.13(C)(3) What is the cable tray made of? It should resemble a brick column to
blend better with the buildng.
Comment Number: 4
Comment Originated: 08/19/2013
08/19/2013: LUC 3.18.13(B) The applicant has explained why co -locations was not possible in current
near by locations. But please provide information how the current proposal will allow for co -location.
Comment Number: 5
08/19/2013: Remove the word future from plans.
Department: Engineering Development Review
Comment Originated: 08/19/2013
Page 1 of 3