HomeMy WebLinkAboutSPRING CANYON COMMUNITY PARK - PDP - 20-05 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTTable 4. Storm Sewer Inlet Summary for Spring Canyon Community Park. Basin No. Inlet Type No. of Inlets On -Grade or Sump? Q100 cfs 1 Type R 3 Sump 9.8 2 and 6 Type 13 2 Sump 6.4 3 Type R 3 Sump 8.2 4 TVpe 13-combo 4 Sump 20.6 5 Type 13 2 Sump 11.6 7 Type R 3 Sump 9.6 8 Type 13-combo 3 Sump 13.7 9 and 10 Type 13 1 Sump 21.5 11 Type 13 1 Sump 22.4 12 Type 13 2 Sump 35.6 131 Type 13 1 On -Grade 0.0 13 Type 13 2 Sump 19.2 15 Type 13 1 Sump 7.1 18. Type 13-combo 2 On -Grade 4.5 Pond A outlet Type C 1 Sump 33.5 Pond B outlet Type C 1 Sump 15.1 'Area inlet for pervious area in Basin 13 is for incidental runoff on a perched area of the softball complex. All flow for this inlet is accounted for at the downstream sump with 19.2 cfs. 4. EROSION CONTROL Construction of the Spring Canyon Park will require implementation of erosion control BMPs to minimize the amount of sediment carried offsite by wind and water. Drainage from the park property flows into Spring Creek and erosion control practices must be implemented to minimize the impacts. The erosion control methods to be implemented during the construction of the Spring Canyon Park is located on the Erosion Control Sheet C10. The City of Fort Collins erosion and sediment control construction notes are included on this sheet. Erosion control BMPs for construction of the Spring Canyon Park will include wattle dikes and straw bale dikes set across all flowpaths determined by the general grading plan. The wattle dikes are placed in the flow paths for each 2 feet of vertical drop to slow the conveyance of water and prevent significant erosion before vegetation is installed. The straw bales dikes are to be used in the constructed portion of the Spring Creek channel. Silt fencing is to be added around the construction site to prevent sediment form leaving the site during construction. Drop inlet protection will be installed around each inlet, grated manhole lid, and pond outlet structure to prevent sediment from leaving the project site and entering Spring Creek or downstream stormwater facilities. Straw mulch will be applied after seeding to prevent erosion from runoff and help establish plant cover. A vehicle tracking pad is to be installed at the south entrance of the project site to prevent mud from being carried off site on vehicle tires. Vehicle tracking pads must also be provided at any other access locations to the worksite. Erosion control performance standards will be calculated for the site prior in the final erosion control plan. 6 Ayres Associates Basins 16 and 17 are almost entirely overland and gutter flow to a low point at the west central edge of the park. The low point will become Pond B, and will be located north of the inline hockey rink and east of the parking lot roundabout. Pond B flow will ultimately be carried to Spring Creek through an inlet and storm sewer pipe configuration that will be determined at a later date. The 100-year WSEL at Pond B is 5,126.30 ft, and the total 100- year detention volume is 0.15 ac-ft. A summary of the pond storage characteristics is included in Table 3. Table 3. Detention Summary for Water Quality Ponds. Design Storm Pond 10-Year 100-Year WSEL ft Pond A 5,123.45 5,124.74 Volume ac-ft Pond A 0.531 0.705 WSEL ft Pond B 5,125.58 5,126.30 Volume(ac-ft Pond B 0.038 0.146 Pond A begins to spill over the weir to the north at 5,124.00 ft elevation. No additional detention volume assumed after weir flow occurs. 3.4 Hydraulic Analysis Each of the storm sewer trunklines and the associated laterals were analyzed with the HEC- 22, energy gradeline method. This provided the basis for all pipe sizing, taking into account the tailwater conditions and headloss associated with the different hydraulic structures. The HEC-22 worksheet is included as part of the Appendix. Inlets for the storm sewer system were sized using UD-Inlet v1.04(CASFM).xls; a spreadsheet developed by UDFCD applying methods outlined in the USDCM. The Type-C inlet at Pond A was designed to operate in conjunction with a weir north of the pond. A range of inlet flows were developed from a range of depths based on incremental variation in WSEL. The discharge exiting Pond A over the weir to the north was calculated for the same range of WSELs, and the combined total discharge of weir flow and inlet flow was incorporated into a rating curve of discharge versus WSEL. This rating curve is included in the Appendix. It indicates a 100-year WSEL of 5,124.74 ft for a discharge of 207.9 cfs, calculated from the rational method analysis. This total discharge includes 33.5 cfs of inlet flow, and 174.4 cfs of weir flow. The inlet will be set at an elevation of 5,123.45 ft. The same UDFCD software used for sizing the inlet at Pond A was used to size the remaining inlet structures throughout the park. All inlets for the storm sewer system for the Spring Canyon Community Park are summarized in Table 4. The Type-C inlet at Pond B will be.set at an elevation of 5,125.58 ft, and the 100-year WSEL will be 5,126.30. ft. The 100-year discharge from Pond B will be 15.1 cfs. To prevent local scour at storm sewer outlets, it is necessary to include riprap revetment as outlet protection. Riprap revetment design will be based on procedures outlined in the UDFCD criteria manual. The two lines discharging into Pond A, and the outlets for Ponds A and B will require riprap, especially in the Spring Creek channel, to prevent local scour and erosion. The north weir overflow for Pond A will be protected on the upstream and downstream face with Recyclex turf reinforcement mat (TRM), or an approved alternative, to protect the weir from erosion and possible breach. The TRM will be seeded with a native dryland grass mixture approved for the Front Range and irrigated for the first year after installation. Ayres Associates Table 2. Rational Method Parameters and Results by Basin Number. Basin No. Drainage Area ac Percent Impervious % 010 cfs 0100 cfs 1 0.96 95 4.8 9.8 2 0.31 34 0.6 1.7 3 1.54 68 3.5 8.2 4 4.98 36 7.4 20.6 5 2.49 52 4.7 11.6 6 0.88 26 1.6 4.7 7 2.09 49 3.7 9.6 8 2.72 37 4.3 13.7 9 2.93 74 7.3 16.3 10 0.84 58 1.7 5.2 11 5.29 31 7.9 22.4 12 8.60 27 12.1 35.6 . 13 4.54 31 6.8 19.2 14 3.94 41 6.6 17.7 15 1.72 29 2.4 7.1 16 1.86 72 5.9 13.3 17 0.41 25 0.6 1.8 18 0.44 1 95 1 2.2 4.5 The storm drainage system for the park includes two main storm sewer trunklines. The first, and largest, is known as Line A. This line extends from its outlet point at Pond A back to the southeast corner of the park, including Basins 9 through 12. Two laterals and one trunkline branch from Line A. The second trunkline extends from Line A and carries runoff from the southwestern and south-central portions of the park, including Basins 1 through 6, 13, and 18. Two laterals branch off of Line D. A lateral drains Basin 15 directly to the pond, but does not connect to the trunklines. Basin 14 drains directly to Pond A by overland and gutter flow. Basins 16 and 17 drain to.Pond B by overland and gutter flow. Detention for the water quality Ponds A and B was determined using the UDFCD method. This method incorporates the total impervious percentage of area upstream of the pond and calculates the water quality capture volume in inches, the depth of the average runoff, and the total upstream tributary area. The calculated required storage for the 10-year storm will then be the total volume captured by the pond to contain the 10-year flow. Any flow exceeding this volume will then enter a Type-C inlet that discharges through directly into Spring Creek. The total volume captured by detention Pond A is 0.53 ac-ft. Water will rise to an elevation of 5,123.44 ft. All flows exceeding this WSEL will enter a Type C inlet that discharges through a 30-inch RCP storm sewer pipe connected to Spring Creek. Weir flow to the north occurs when the WSEL exceeds 5,124.00 ft. All weir flow will be conveyed by a swale to Spring Creek near the northern border of the park. The anticipated 100-year WSEL for Pond A is 5,124.74 ft. 4 Ayres Associates for the Spring Canyon Community Park. The proposed locations of two detention ponds and the two outlets to Spring Creek are indicated on the proposed plan sheets. Also shown are the locations of the minor storm drainage facilities that include curb inlets, grate inlets, combined inlets, storm sewer pipes, and minor drainage swales. Section 3.3 of this report presents a specific -description of the proposed drainage plan for the park. The design of inlets was performed based on the methodologies outlined in the Urban Storm Drainage Criteria Manual (USDCM) published by the Urban Drainage and Flood Control District (UDFCD) in Denver, Colorado. Storm sewers were designed using methods established in the Hydraulic Engineering Circular Number 22 Urban Drainage Design Manual, also known as HEC-22. Hydrologic calculations for the design of the local drainage facilities were performed using the rational method, as described in the Fort Collins manual. A detailed description of the design of the local drainage facilities is provided in Section 3.3. The detention ponds were sized in accordance with methods outlined in Volume 3 of the USDCM. The rational method analysis was used to determine the 10- and 100-year runoff for the subbasins that contribute to a pond. Details of the proposed conditions hydrology are included in Section 3.2. 3.2 Proposed Conditions Hydrology The tributary area for the Spring Canyon Community Park site includes a 46.5 acre portion of the park and Horsetooth Road immediately south of the park. There is no development planned around the park that might add runoff to the site. The proposed Spring Canyon Community Park was subdivided into 18 individual sub -basins with regard to topography and flow contribution. These basins are numbered 1 through 18, and were incorporated into rational method calculations performed according to the City of Fort Collins Storm Drainage Design Criteria and Construction Standards manual. Basins 1 through 15, and 18, will drain to the detention pond known as Pond A, on the north side of the site. Pond A will maintain a constant water surface elevation (WSEL) of approximately 5122.0 ft. Basins 16 and 17 will drain to a smaller depression known as Pond B. This pond will retain stormwater, and will be sized with an outlet pipe at a later time. Both ponds will capture the entire 10-year runoff volume to meet water quality requirements for flows emptying into Spring Creek. The Appendix contains storage discharge relationships for Ponds A and B in the developed condition. The rational method calculations contain four distinct impervious values describing land uses within the park. These land uses consist of undeveloped areas (typically mowed grass), gravel areas, ponds, and asphalt or concrete paving. The impervious values for these areas are 20%, 50%, 95%, and 95%, respectively. The basin parameters and hydrologic calculations are included in the Appendix for the 10- and 100-year storm events. This data is summarized in Table 2. 3.3 Proposed Drainage Plan A discussion of the detailed design of drainage facilities is included this section. Attached to this report are the Drainage and Erosion Control Plan Sheets. Storm drainage on the Spring Canyon Community Park will follow the flowpaths determined from the grading plan. Flow tends to concentrate in a series of inlets that drain to a storm sewer network. Drainage will eventually make its way to the Pond A (north central park site) and Pond B (west central park site), where runoff discharged from the project site will be held to controlled release rates. Ayres Associates In the western portion of the Park site, Spring Creek is a poorly -defined channel that also appears to have been excavated to.convey nuisance stormwater flows to the north. Several large deciduous trees have grown adjacent to the Spring Creek channel. On the far north end of the Park site, the Spring Creek channel becomes more well-defined, and bends to the northeast. At its confluence with the Pleasant Valley and Lake Canal (PV&L), Spring Creek is conveyed in a 12-inch pipe under the canal, with any excess flows being conveyed over . the ditch. It should be noted that at this location, the canal appears to have been dug primarily from excavation, meaning the downstream bank does not appear to be a fill -slope, but instead native soil. With the existing condition climate and irrigation practices, the Spring Creek channel does not have a consistent base flow until downstream of the PV&L Canal. On the southern boundary of the Park, Horsetooth Road has been extended west to Horsetooth Court. Runoff from Horsetooth Road, Horsetooth Court and releases from the Springfield Subdivision detention pond are all conveyed on the south side of Horsetooth Road west to the valley low point. In the southwest corner of the proposed Park site, there is an existing fenced -in dog park. The vegetation in this park site has been predominantly removed in this area, resulting in a more hard -packed earth, rather than grassed vegetation that characterizes the surrounding Park site. On the western boundary of the Park, the northern frontage of the Spring Creek channel is bounded on the west by Cottonwood Glen Park, a neighborhood park constructed in 2000. The drainage patterns on the Cottonwood Glen Park generally direct water from west to east. A portion of the runoff is intercepted by a landscape/irrigation lake and released to Spring Creek. The remainder of the runoff is discharged directly to Spring Creek. The Spring Creek Master Drainage Plan provided a big -picture hydrologic analysis of the Spring Creek Basin, including the Park site. The hydrologic modeling was done in the MODSWMM model, to be representative of developed conditions with existing drainage facilities. The discharge in Spring Creek at various design points in the vicinity of the Park site are given in Table 1. Table 1. 100-Year Discharge From Spring Creek Master Plan MODSW MM Model. Location Model Node Discharge Horsetooth Road 961 1,412 Mid -point of Spring Canyon Community Park 962 1,680 Pleasant Valley and Lake Canal 338 1,871 Model SCDEV100.OUT provided by City of Fort Collins, March 24, 2005 3. PRELIMINARY DRAINAGE PLAN FOR THE SPRING CANYON COMMUNITY PARK 3.1 General The preliminary drainage plan for the Spring Canyon Community Park has been developed to provide a drainage system that meets the requirements established in the City of Fort Collins Storm Drainage Design Criteria and Construction Standards manual. This has been accomplished by designing a series of inlets, storm sewers, and detention ponds that will collect, convey, and detain runoff. Sheets C6 and C9 show the grading and drainage plan 2 Ayres Associates 1. INTRODUCTION The Spring Canyon Community Park (SCCP) project consists of approximately 136 acres located on the north side of West Horsetooth Road (LCR-40) and east of the Pineridge Natural Area in Fort Collins, Colorado. Figure 1 shows a vicinity map of the project site. The proposed development would convert an agricultural use area (alfalfa hay) to a recreational park with numerous athletic facilities, recreational opportunities, and maintained multi -use open areas. Figure 1. Vicinity map of the Spring Canyon Community Park. 2. EXISTING DRAINAGE CONDITIONS The existing Spring Canyon Community Park development site is primarily undeveloped. For decades, the property has been used as flood -irrigated grassland. The regularity of the existing ground contours shows evidence of a historic reworking of the land, with a ground slope of approximately 1.0% from south to north. Around the southern portion of the site, the Taft lateral is a periodic irrigation channel that is fed from a pressurized pipe system, with an outlet near the western terminus of Horsetooth Road. Through the middle of the site, a small drainage collector channel has been excavated to convey excess irrigation and stormwater flows north to Spring Creek. Ayres Associates TABLE OF CONTENTS 1. Introduction...................................................................................................................1 2. Existing Drainage Conditions.........................................................................................1 3. Preliminary Drainage Plan for the Spring Canyon Community Park ..............................2 3.1 General...........................:......................................................................................2 3.2 Proposed Conditions Hydrology.............................................................................3 3.3 Proposed Drainage Plan.............................................:..........................................3 3.4 Hydraulic Ahalysis...................................................................................................5 4. Erosion Control..............................................................................................................6 TECHNICAL APPENDIX................................................................................................... -- LIST OF FIGURES Figure 1. Vicinity map of the Spring Canyon Community Park.............................................1 LIST OF TABLES Table 1. 100-Year Discharge From Spring Creek Master Plan MODSWMM Model.............2 Table 2. Rational Method Parameters and Results..............................................................4 Table 3. Detention Summary for Water Quality Ponds........................................................5 Table 4. Storm Sewer Inlet Summary for Spring Canyon Community Park . ..................... :..6 Ayres Associates DRAFT PRELIMINARY DRAINAGE REPORT FOR SPRING CANYON COMMUNITY PARK Prepared for City of Fort Collins Stormwater Utility 215 North Mason Fort Collins, Colorado 80524 ,3756?>/G AMES �.::.... ASSOCIATES P.O. Box 270460 Fort Collins, Colorado 80527 (970) 223-5556, FAX (970) 223-5578 Ayres Project No. 32-0890.00 (Task 5) SP-CAN4T.DOC April 2005