HomeMy WebLinkAboutEVANGELICAL LUTHERAN GOOD SAMARITAN, NEXTEL WTE - PDP/FDP - 33-05 - CORRESPONDENCE - (5)44
Sincerely,
Shelby Sommer
Associate City Planner
Page 3
Number: 4 Created: 8/29/2005
[8/29/05] Load requirements and meter location have already been
coordinated with Light and Power. Refer to Non W.O. #2714
Department: Natural Resources Issue Contact: Doug Moore
Topic: General
Number: 2 Created: 8/25/2005
[8/25/05] The Construction Timing standard 3.4.1(N)(4) will apply to this
project due to the presence of a communal Ferruginous Hawk winter night roost
site locate adjacent to the east side of the site. Construction may not occur
during the roosting season which occurs from October 15 thru March 15. Please
note this construction timing constraint on the site plan or under construction
notes on the utility plans. Timing constraint may also be placed as a condition of
approval for the project and will be included in a development agreement if an
agreement is required. No other issues. Contact Doug at 224-6143 or
dmoore@fcgov.com.
Department: Transportation Planning
Topic: General
Number: 7
[8/30/05] No Comments
Department: Zoning
Topic: zoning
Number: 1
Issue Contact: Kurt Ravenschlag
Created:8/30/2005
Issue Contact: Peter Barnes
Created: 8/17/2005
[8/17/05] Section 3.8.13(C)(3) requires the antennae to be screened. If that's
possible to do, then the screens need to be shown.
Please revise your plans, taking into account the aforementioned comments.
When you are ready to submit your revisions, please contact me at (970) 221-
6750 to schedule a submittal appointment. You should submit the following
items:
• Site/elevation plan sets - 8 copies
• Written response to City comments - 8 copies
If you have any questions regarding these issues or any other issues related to
this project, please feel free to call or email me.
Page 2
Sef 61/2/65 t0 )ef. Mid@ neXK) -OW-)
STAFF PROJECT REVIEW
City of Fort Collins
JEFF KEITH Date: 09/02/2005
NEXTEL
333 INVERNESS DR. SOUTH
ENGLEWOOD, CO 80112
Staff has reviewed your submittal for EVANGELICAL LUTHERAN GOOD
SAMARITAN, NEXTEL WTE - TYPE II, and we offer the following comments:
ISSUES:
Department: Current Planning
Topic: 6enerol
Issue Contact: Shelby Sommer
Number: 5 Created: 8/30/2005
[8/30/05] All wireless telecommunication equipment shall be located as far
from the edge of the roof as possible. (Section 3.8.13(C)(3)).
Number: 6
Created:8/30/2005
[8/30/05] Roof- and ground -mounted wireless telecommunication equipment
shall be screened by parapet walls or screen walls in a manner compatible with
the building's design, color and material. (Section 3.8.13(C)(3)). Please screen
antennae as much as possible.
Number: 8 Created: 8/31/2005
[8/31/05] Rick Lee of the Building Department (221-2340) requests that you
provide structural design to resist 100 MPH exposure "B" wind load.
Number: 9 Created: 8/31/2005
[8/31/05] Technical Services indicated that the lines on the plans could be
darker for better readability/scanability.
Department: Light & Power
Topic: General
Number: 3
Issue Contact: Alan Rutz
Created:8/29/2005
[8/29/05] On the cover sheet T1, Power provider is listed as Xcel. Power will
be supplied by Ft Collins Utilities.