HomeMy WebLinkAboutINNOVATION ISLAND, FIRST FILING - FDP - 40-05B - CORRESPONDENCE - (5)iW,
Done.
Please label all sewer lines as SDR 35.
Done.
Please label all stations on the sewer profile plan view.
Done.
Be sure and return all of your redlined plans when you re -submit.
Done.
Page 9
Topic: Water and Wastewater
Number: 77 Created: 5 / 30 / 2006
[5/30/06]
Please provide 10 feet of separation between water and sewer lines, close to
Buildings D and E and between fire and water service lines on Building D.
10 feet is provided.
Please label clearly area where the sewer line connects to the HOA Tract as
a Utility Easement.
Done.
Please call out all water and sewer service lines. If only a 1 inch service line
is used on the buildings then supporting calculations would need to be
provided.
Per conversations with Roger Buffington and a review of the proposed
fixture counts, we are proposing a 1 112 inch water service for the 7-
plex (Building A) and a 1 inch water service for the remaining units.
All sewer services are called out to be 4 inch PVC.
Please call out a swivel tee and a gate valve at the fire hydrant connection
near the Harmony Road entrance.
Done.
The water main line connecting to Harmony seems to be crossing under the
proposed wrought iron fence. According to the detail, the fence will have
fence posts every 70 inches or so that will have over 3 feet of footing of
depth. Please add a note and a special detail that would span the water
main with a removable section with at least 5 feet of clearance on either side
of the main, so that the footings will not affect the line.
Providing a 10 foot removable section would require a custom built
fence. Roger Buffington approved usage of an 8 foot removable
section.
Add a note stating that all water mains are to be ductile iron with polywrap.
Done.
If the plan is use directional boring for the last section of the sanitary sewer
line in the HOA Tract; that line is typically HDPE.
This pipe segment has been changed to HDPE.
Please add a note to reshape existing manhole bench to direct flow to
existing channel.
Done.
Correct details to say water details.
Page 8
Done.
2. The pond should be utilized as a sediment trap. Also, what will protect
Harmony Road during and after the outlet pipe connection?
A sediment trap is now called out on the plans. Silt fence has been
added along areas where sediment may be directed toward Harmony
Road. Otherwise, inlet protection for the existing and proposed inlets
will be provided.
3. The site drains east, but is the slope sufficient that Taft Hill and the
southwest portion of the project don't need any runoff protection during
construction?
Additional silt fence has been added along the Taft Hill frontage.
4. If the existing stormwater pipe FES at the southeast end of the site
needs to be protected per your drawing, why isn't the silt fencing
extended around this area as well?
See response to number 2 above.
Topic: Stormuater
Number: 78 Created: 5/ 30/ 2006
[5/30/061 Please add a pan to the swale on the south side as slope is less
than 2%.
Done.
Please provide underdrain detail.
The detail provided has been expanded as requested.
It is not clear how the undedrain will tie into the face of curb. Clarify and
provide detail.
The 4 inch PVC outlet pipe is to connect to the back side of the
sidewalk chase rather than the face of cub. A detail has been added
to show the connection point.
Will cable and gas lines be underneath drainage swale? This might present
a problem especially if the swale is lined with a concrete channel as
requested. Please provide a cross section showing swale and all dry utilities
proposed in that easement.
The cable line is now shown on the typical section to be south of the
concrete pan. The gas line is coming from the west and will remain
well north of the concrete pan.
Will the drainage swale on south be graded without disturbing existing
fences? Please add a note to that effect.
A note has been added.
Page 7
Topic: Site Plan
Number: 80 Created: 5 / 31 / 2006
[5/31/061 Remove general note #6 since these are final development plans.
Done.
Number: 81 Created: 5 / 31 / 2006
[5/31/061 Please change the utility easement dimension to reflect the plat
(14.6' should be 15').
Done.
Topic: Technical Services
Number: 82 Created: 5/ 31 / 2006
[5/31/061 Technical Services Comments:
1. Boundary and Legal Close.
2. Typo in title- see redlines, "R" is missing in Quarter.
3. Response to Q-3 (Oct. 19, 2005) on Taft, ROW incomplete, is full ROW
120' .
(I talked with J.R. in Technical services, and he would like an additional
line shown where the actual street ROW is located and a note of which book
number it was dedicated in). Please coordinate directly with J.R. if you have
any other questions on this issue.
The right-of-way for the adjacent lots are now shown as requested.
We were not able to retrieve the recording information prior to this
submittal; however, that information will be provided on the Final
Plat submittal.
Department: PFA Issue Contact: Carle Dann
Topic: Fire
Number: 79 Created: 5/ 31 / 2006
[5/31/06] EMERGENCY ACCESS EASEMENT: The Emergency Access
Easement needs to be specifically designated as such on the plat. It cannot
be called an "Access Easement", which is what the plat currently shows.
(See also Mike Chavez's comment #41 from 10/ 19/2005.) Contact Carie
Dann, phone 416.2869, if you want to further discuss the "approved
barricades" at the emergency access easement.
The easement label has been revised.
Department: Stormwater-Water-Wastewater Issue
Contact: Basil Hamdan
Topic: Erosion and Sediment Control
Number: 53 Created: 5/ 19/2006
[5/ 19/06]
May 19, 2006
1. Please submit project schedule and required calculations including
surety.
Page 6
Number: 75 Created: 5 / 26 / 2006
[5/26/06] At driveway/street intersections, please provide all necessary
spot elevations (refer to Figure 7.28 in LCUASS).
Additional spot grades have been added; however, the full extent of
grades as shown on the referenced detail is not appropriate for this
design. The detail shows additional grades for an intersecting
crowned pavement section which does not exist for this project.
Number: 76 Created: 5/ 26/ 2006
[5/26/06] Replace Detail D-6 with the standard curb and gutter details 701
and 702.
Done.
Topic: Plat
Number: 56 Created: 5 / 26 / 2006
[5/26/06] Poudre Valley REA should be signing the plat since you will be
doing work within their easement.
John Thomas with PVREA is currently reviewing the plans and plat
and has indicated that he will be prepared to sign the final plat upon
completion of his review/comment.
Number: 57 Created: 5/ 26/ 2006
[5/26/061 Easements for emergency vehicles need to be called out as
Emergency Access Easements.
Done.
Number: 58 Created: 5 / 26/ 2006
[5/26/061 Please label the sight distance easements.
Done.
Number: 59 Created: 5 / 26 / 2006
[5/26/06] Please provide us with a copy of the temporary drainage
easement on the south side of the property.
Copy attached.
Number: 60 Created: 5/ 26/ 2006
[5/26/061 Please show actual property lines on the west side of Taft Hill Rd.
As drawn, it appears that there is only 1/2 of a street dedicated.
Done.
Number: 61 Created: 5 / 26/ 2006
[5/26/06] Provide a legend for the abbreviations on the plat. The cover
sheet does not get filed with the plat, so it's not adequate to just have them
on the cover.
Done.
Page 5
Number: 67 Created: 5 / 26 / 2006
[5/26/06] Cable and gas utilities appear to be running in the bottom of the
drainage ditch. Are the utilities ok with being in the ditch? And is there
anything in the drainage easement language that would prevent the ability
to locate utilities here? It may be a maintenance issue.
Per our team meeting, those utilities can run within the drainage and
utility easement but we have noted them to be located to the north of
the proposed concrete pan.
Number: 68 Created: 5/ 26/ 2006
[5/26/06] Please move the fence on the north side of the property back
behind the easement line. Permission from utilities would be needed to
encroach on the easement.
The only utility that is proposed to be within the easement is Xcel
Energy's gas line and written permission is attached from Xcel to
locate the fence as shown. The remaining dry utility companies
propose to locate their facilities north of the sidewalk and will not
conflict with the fence; however, we have also obtained permission
from Comcast and the City of Fort Collins Utility Department. Due to
the holidays we have not received the anticipated approval from
Qwest but will forward that upon receipt.
Number: 70 Created: 5/ 26/ 2006
[5/26/06] The underdrain design is lacking in detail. How does the
transition from pipe to sidewalk chase work? You have 8" of gravel layer
tying into a 6" sidewalk culvert.
Additional detail has been added for the construction of the
underdrain.
Number: 73 Created: 5 / 26 / 2006
[5/26/06] The drainage ditch water level is shown to come up right to the
base of the fence along the south property line. If the fence ever has to be
rebuilt on your side, it doesn't seem that you'd be able to do it without
either encroaching on the ditch, or the neighboring property.
With the addition of the concrete pan, the water level has been
lowered and therefore has moved away from the fence line.
Number: 74 Created: 5/ 26/ 2006
[5/26/061 It is unclear how the grading will be phased with this project.
Please add a note if it is all in the first phase, and phase lines if grading will
be done with both phases.
The previous note has been modified to include all grading shown as
part of Phase L
Page 4
Department: Engineering Issue Contact: Dan
De Laughter
Topic: General
Number: 14 Created: 10/ 14/2005
[5/ 15/06] Please provide a detail.
[10/ 14/05] Please indicate a PFA approved barricade on your plans to
prevent public use of the Taft Hill access. (Detail for FC)
Per conversations between Bob Hand (Habitat for Humanity) and Ron
Gonzales (PFA), a knock -down version of the barricade will be utilized
and a detail has been added to the plans.
Number: 19 Created: 10/ 14/2005
[5/ 15/06] Length and location are not entirely clear.
[10/ 14/051 Provide conduit for future undergrounding of overhead lines on
SW side of the site- this should be shown and labeled on the plans.
The length, size and location of the conduit has been clarified.
Number: 54 Created: 5 / 26 / 2006
[5/26/061 Please see redlines for additional minor revisions.
Additional redline comments have been addressed or noted otherwise
on the plans.
Number: 55 Created: 5/26/2006
[5/26/061 Cover Sheet:
1. Street labeled as Horsetooth Road should actually be W. County Rd. 38E
2. Provide 2 benchmarks.
3. Some line types in the legend are still difficult to see.
The Cover Sheet comments noted have been addressed.
Number: 62 Created: 5 / 26 / 2006
[5/26/061 Provide a detail for the fire access barricade in the detail sheets.
Detail provided.
Number: 63 Created: 5 / 26/ 2006
[5/26/061 Striping in the parking area is too light to show up.
Striping line types have been made darker.
Number: 64 Created: 5 / 26 / 2006
[5/26/06] Please modify note 5 on sheet 6 to include any features and
utilities in the Tract. The low wall and fence are not mentioned.
Additional features have been mentioned as requested.
Number: 66 Created: 5 / 26 / 2006
[5/26/061 Please add the standard street cut note where cuts are shown
rather than the "5' sawcut each side" note.
Done.
Page 3
Doug Martine of the City Light 8a Power Department confirmed ability
for developer to contract with the Light & Power Department for the
installation, on -going maintenance, and monthly lighting fee of the
proposed American Revolution Cutoff, Series 247 parking lot lights
(Type 'A" iuminaire) as shown on the Lighting & Photometric Plan.
Therefore, the note on the note is acceptable.
Number: 93 Created: 6 / 5 / 2006
[6/5/06] The Light & Power Department indicated that the southerly
street tree along South Taft Hill Road must be adjusted to meet the City's
street light/ street tree separation requirement of 40' for deciduous trees and
15' for ornamental trees. As shown on Sheet 4 of 7 of the Landscape Plan,
the most southerly proposed tree, south of the emergency drive into the
property, is an ornamental tree (Turkish Hazel) and appears to be almost 40'
from what appears to be a street light.
The ornamental tree is located 20' from the street light (drawing
scale was incorrect, has been corrected). There is insufficient space
to use a standard deciduous tree.
Topic: Site Plan
Number: 83 Created: 6/ 5 / 2006
[6/5/06] Change the year to 2006 in the signature blocks on Sheet 1 of 7,
Site Plan.
Done
Number: 84 Created: 6 / 5 / 2006
[6/5/06] General Note 2 on the Site Plan specifies landscaping within
adjacent right-of-way to be maintained by the Homeowner's Association
(HOA). Planting Note 7 on Sheet 3 of 7 of the Landscape Plan specifies the
building owner to be responsible for plantings in public street rights -of -way.
Are the building owners and HOA one in the same?
Reference to building owner changed to HOA.
Number: 85 Created: 6/ 5/ 2006
[6/5/06] The utilities (lines) should be removed from the Site Plan;
however, they should remain on the Landscape Plans.
Done.
Number: 86 Created: 6 / 5 / 2006
[6/5/06] The new 3' & 6' high wrought iron fences should be labeled on the
Site Plan. This reference could be done just in the Site Plan Legend as long
as the graphic line symbols are the same in the legend and on the plan
(which they are not currently).
Labeling has been added and legend corrected.
Page 2
Innovation Island - Response to FDP staff review comments dated June
5, 2006.
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Landscape plan
Number: 87 Created: 6/ 5/ 2006
[6/5/06] There is some overlapping information on Sheet 3 of 7 of the
Landscape Plan that is somewhat illegible.
The overlap has been eliminated.
Number: 88 Created: 6 / 5 / 2006
[6/5/06] The wrought iron fences should be labeled as such on Sheet 3 of 7
of the Landscape Plan.
Done.
Number: 89 Created: 6 / 5 / 2006
[6/5/06] Planting Note 7 on Sheet 3 of 7 of the Landscape Plan specifies
the building owner to be responsible for plantings in public street rights -of -
way. General Note 2 on the Site Plan specifies landscaping within adjacent
right-of-way to be maintained by the Homeowner's Association (HOA). Are
the building owners and HOA one in the same?
Reference to building owner changed to HOA.
Number: 90 Created: 6 / 5 / 2006
[6/5/06] Additional trees for screening of car headlights into homes to the
south should be planted at the south end of the drives/parking spaces east
of Buildings B & C on Sheet 4 of 7 of the Landscape Plan.
Additional trees for screening have been added.
Number: 91 Created: 6/ 5 / 2006
[6/5/06] Call out the footing depths for the 3' 8v 6' high wrought iron fence
details on Sheet 4 of 7 of the Landscape Plan.
Done.
Topic: Lighting
Number: 92 Created: 6/5/2006
[6/5/061 On the Lighting & Photometric Plan there is a note stating ...
"Type "A" luminaire is a standard product for Fort Collins street lighting and
may be provided and installed by the City of fort Collins utility department".
As City staff previously questioned, why would City Light 8a Power provide
and install these lights on private property and have they indicated that
they would?