Loading...
HomeMy WebLinkAboutINNOVATION ISLAND, FIRST FILING - PDP - 40-05A - CORRESPONDENCE -If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truly, teve Olt City Planner cc: Dan DeLaughter Habitat for Humanity Interwest Consulting Group King Surveyors Project File #40-05A Page 8 Number: 36 Created: 10/ 18/2005 [ 10/ 18/051 Provide access ramps for handicap parking stall located near playground. Department: Zoning Issue Contact: Peter Barnes Topic: Zoning Number: 3 Created: 10/ 11 /2005 [ 10/ 11 /05) There needs to be a note on the Cover Sheet (sheet 1 of 6) to the effect that this is a qualifying affordable housing project. Number: 4 Created: 10/ 11 /2005 [ 10/ 11 /05) A 6' high solid fence is required along the parking areas on the south side of the lot. There's a note on the site plan showing an "existing fence ® south property line", but it's unclear how tall that fencing is, and if It's all along the south lot line. If it's all along the south lot line, then a note should be added stating that in the event the homeowners to the south remove their fence, then the developer or HOA will be responsible for constructing a fence to screen the parking spaces as required. Number: 5 Created: 10/ 11 /2005 [ 10/ 11 /05) A 5' wide landscape strip is required along the east lot line adjacent to the driveway and 3 parking spaces unless the driveway will also provide access to the future commercial phase on Lot 2. If A will provide such access, then a note to that affect should be on the plan. Number: 6 Created: 10/ 11 /2005 [10/11/051 Section 3.5.2(D)(1) requires a minimum building setback of 30' from the ROW of an arterial street. It appears that the building setback along the Taft Hill ROW is less than that. Number: 7 Created: 10/ 11 /2005 [10/11/051 Where is bicycle parking going to be provided? This item has been scheduled for the November 17, 2005 Planning & Zoning Board public hearing, concurrent with the Innovation Island, ODP. The ODP will be heard first, followed by this PDP. It is not necessary to re -submit plans based on these comments before going to public hearing on November 17th. They can be addressed with the Final Compliance submittal. Please check with me for submittal reauirements Drior to submitting Final Compliance Dlans. Be sure and return all red -lined plans if/when you re -submit. Page 7 Topic: Grading the swale along the south property line looks to very close to the edge of Number: 29 Created: 10/ 17/2005 [10/ 17/051 The swale on the south side of Building B looks very tight, please provide a cross-section at that location verifying that the proposed grading will work for that area. Topic: Sewer Number: 38 Created: 10/ 18/2005 [10/18/051 Please relocate sanitary line to avoid water quality outlet structure. Since the landscaping in the Woodridge HOA tract will be disturbed during boring operations, please add a note stating that the landscaping will be put back to an equal or better condition to what it was before construction operations. Please make sure that the sanitary line has a minimum 4 feet of cover as it crosses under the proposed water quality pond. Topic: Water Number: 37 Created: 10/ 18/2005 [10/18/051 Please call out all water lines appurtenances: valves, thrust blocks, swivel Ts, curb stops, meter pits etc... It is suggested that a 6 " line be used to serve Buildings D and E. Please use a valve to isolate that line from the rest of the development. Call out all existing water lines, call out which ones are district and which ones are City. Department: Traffic Operations Issue Contact: Eric Bracke Topic: Trgffiic Engineering Number: 8 Created: 10/ 12/2005 [ 10/ 12/051 The access onto Taft Hill Road is to be an emergency access ONLY. Please have the access blocked off with bollards. Department: Transportation Planning Issue Contact: Hurt Ravenschlag Topic: Technical Services Number: 34 Created: 10/ 18/2005 [ 10/ 18/051 Walkways should be 6' in width if attached to driveway. Number: 35 Created: 10/ 18/2005 [ 10/ 18/051 A direct walkway needs to be provided to connect building D with play area to eliminate the two drive way crossings as currently shown. Page 6 Department: Light & Power Issue Contact: Doug Martine Topic: Landscape plan Number: 1 Created: 10/7/2005 [10/7/05] There is an existing streetlight on Taft Hill Rd., approximately 20 ft. south of this site. The location of the most southerly street tree will need to be adjusted to provide a minimum of 40 ft clearance between the light and the tree. As an alternative, the tree could be changed to an ornamental type which requires only a 15 ft. clearance. Department: Natural Resources Topic: General Number: 2 [10/7/05] No issues. Issue Contact: Doug Moore Created: 10/7/2005 Department: PFA Issue Contact: Michael Chavez Topic: General Number: 41 Created: 10/ 19/2005 [10/19/051 Emergency Access Easement: The private drive shall be platted as a "Emergency Access Easement" on the final Plat. Number: 42 Created: 10/ 19/2005 [ 10/ 19/051 Addressing: Unit and Building address shall be posted on both sides of the buildings. (Sidewalk side & garage side). Number: 43 Created: 10/ 19/2005 [ 10/ 19/051 Water Supply: Fire hydrant locations are approved. Fire hydrant flow shall be 1500 gpm w/20 psi residual. Number: 44 Created: 10/ 19/2005 [ 10/ 19/051 This project will NOT require the use of Fire Sprinklers. Department: Stormwater Utility. Issue Contact: Basil Hamdan Topic: Drainage Number: 28 Created: 10/ 17/2005 [10/ 17/05] In order to minimize the amount of untreated flows coming off the site, please add a note to the grading plans stating that all downspouts from the Building A along Harmony will be directed to the south. Topic: Drainage Report Number: 30 Created: 10/ 17/2005 [ 10/ 17/05] Good job on the written portion of the report explaining the design constraints that controlled the design of the stormwater facilities for this site. Thanks. Page 5 Number: 23 Created: 10/ 14/2005 [ 10/ 14/051 It appears that some utilities are not located in easements. (addressed at meeting) Number: 24 Created: 10/ 14/2005 [ 10/ 14/051 Please show existing offsite grades for a minimum of 50', including the neighborhood to the south. Will any offsite grading be necessary? If so, we need a letter of intent from the owner prior to hearing. (FC) Number: 25 Created: 10/ 14/2005 [ 10/ 14/05) Please show all features 150' min offsite, including existing structures on the north side of harmony. (FC) Number: 26 Created: 10/ 14/2005 [ 10/ 14/05) You are showing an outer curve radius of 30' in an emergency access lane. The minimums required by PFA are 25' inner, 50' outer. Please revise. (addressed- accepted by Ron Gonzales) Number: 27 Created: 10/ 14/2005 [ 10/ 14/051 Please refer to redlines for additional comments and revisions Number: 39 Created: 10/ 19/2005 [ 10/ 19/051 All newly installed sidewalks are to be 6" minimum thickness. You are showing our old details with 4". Please revise per Standard Drawing 1601. Number: 40 Created: 10/ 19/2005 [10/19/051 Add standard street cut note: "Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards." Topic: Technical Services Number: 31 Created: 10/ 18/2005 [ 10/ 18/051 Tech. services comment: See typo in title Number: 32 Created: 10/ 18/2005 [ 10/ 18/051 Tech. services comment: Please show how Taft Hill & Harmony were dedicated. Number: 33 Created: 10/ 18/2005 [ 10/ 18/051 Tech. services comment: Is all of Lot 1 a Utility/Drainage/Private Access easement? Note on Sheet lis confusing. (Where will the structure be placed on Lot 1?) Page 4 Number: 15 Created: 10/ 14/2005 [10/14/051 The line type used for curb& gutter should be solid- please revise. (FC) Number: 20 Created: 10/ 14/2005 [10/ 14/051 Remove the landscape layer from all utility plan sheets. (FC) Topic: General Number: 9 Created: 10/ 14/2005 110/ 14/051 Reference the nearest 2 benchmarks on the cover sheet. It appears you are only referencing 1. (FC) Number: 13 Created: 10/ 14/2005 [ 10/ 14/051 You will need to provide a turnaround area for the parking spaces to the south since there is no real continuity there. Number: 14 Created: 10/ 14/2005 [10/14/051 Please indicate a PFA approved barricade on your plans to prevent public use of the Taft Hill access. (Detail for FC) Number: 16 Created: 10/ 14/2005 [ 10/ 14/051 Please label and dimension all existing and proposed ROW. Number: 17 Created: 10/ 14/2005 [10/14/051 Show concrete to the back of ROW for all proposed curb cuts (label and hatch) Number: 18 Created: 10/ 14/2005 [10/14/051 Please modify your sight distance easement variance request to account for the added lane of traffic that must be crossed for the left turn. The value you got from AASHTO is based off of a two-lane street. Number: 19 1 Created: 10/ 14/2005 [10/14/051 Provide conduit for future undergrounding of overhead lines on SW side of the site- this should be shown and labeled on the plans. Number: 21 Created: 10/ 14/2005 [ 10/ 14/051 Are structures shown on the south side of the site retaining walls? If so, label and provide a detail. If not, what are they? (FC) Number: 22 Created: 10/ 14/2005 [ 10/ 14/051 What is the honeycomb type hatching shown in the access on the grading plan? (FC) Page 3 Delivery Agreement must be in place prior to any delivery of mail. Contact Carl Jenkins, Growth Coordinator, U.S/. Postal Service, 301 East Boardwalk Drive, Fort Collins, CO., phone #970-225-4130, cell #970-214- 3668, fax #970-225-4139. Topic: Landscape plan Number: 46 Created: 10/24/2005 [ 10/24/051 Tim Buchanan, the City Forester, indicated that, on the Final Compliance Landscape Plan, the applicant must directly label the trees so that species can be identified. 4 Topic: Site Plan Number: 49 Creat d: 10/24/2005 [10/24/051 How will the proposed "emergency acce�s" drive at the southwest corner of the development be controlled, Number: 50 Created: 10/24/2005 110/24/051 Two types of fencing are being proposed but the plan is unclear as to where the fences will actually be. Pleas expand this information on the Site and Landscape Plans. Number: 51 Created: 10/24/2005 [10/24/051 There is a required sight distance easement along West Harmony Road that must be shown on the development plans (plat, Site Plan, Landscape Plan). Number: 52 Created: 10/24/2005 [ 10/24/051 The only bicycle rack shown on the Site Plan is at the playground area. Is it safe to assume that all of the residents will park bicycles in their attached garages? Department: Engineering Issue Contact: Dan DeLaughter Topic: format Number: 10 Created: 10/ 14/2005 [ 10/ 14/05] Please be sure all line types are differentiable. Number: 11 Created: 10/ 14/2005 [ 10/ 14/05] A legend must be included on each sheet, not just on one. (FC) Number: 12 Created: 10/ 14/2005 [ 10/ 14/051 There are a few scanability issues- please refer to redlines for comments, and refer to Appendix E-6 of LCUASS for scanability requirements. (FC) Page 2 STAFF PROJECT REVIEW City of Fort Collins Fort Collins Habitat For Humanity, Inc. Date: 10/24/2005 c/o Vignette Studios - Don Tiller 144 North Mason Street, Suite 2 Fort Collins, CO 80524 Staff has reviewed your submittal for INNOVATION ISLAND, FIRST FR NG, PDP - TYPE 1, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: Building Number: 47 Created: 10/24/2005 [10/24/051 Rick Lee of the Building Department offered the following comments: a. He is providing a copy of the Codes & Standards that his department will enforce. As stated on that sheet, there is a requirement to schedule a pre -submittal meeting with the Building Department. b. Provide accessibility per State Statute (CRS 9-5) and 1998 ANSI. Please contact Rick, at 221-6760, if you have questions about these comments. Topic: General Number: 45 Created: 10/24/2005 [10/24/051 Doug Moore of the Natural Resources Department indicated that, after visiting the site, he has determined that neither an Ecological Characterization Study or a Wetland Delineation will be required for this development proposal. Number: 48 Created: 10/24/2005 [ 10/24/051 Carl Jenkins of the Unites States Postal Service indicated that mail service must be provided by a centralized delivery using a minimum of 3 centralized box units (CBU's, 2 Industry Type III and 1 Type 1). Please revise the plan to show the required CBU locations as approved by the U.S. Postal Service. In. all cases the CBU's must be located in the public right -of --way or a designated easement. Please be advised that the responsibility of purchasing and maintaining the CBU's with the concrete pads is that of the owner/developer/builder/HOA. Prior to occupancy within the development approved mail receptacles must be in place. A Page I