HomeMy WebLinkAboutPENNY FLATS (BLOCK 33) - FDP - 32-05/A - CORRESPONDENCE - (10)Number: 197 Created: 7/11 /2006 [7/11/06] Add water service and sewer service Std Details. Number: 198 Created: 7/11 /2006 [7/11/06] Provide the design calc's for the fire line insulation. Also include a detail on the utility plans. (Another possible source of information is: Michael Lentz with Dow at 303-794- 9140). Number: 205 Created: 7/13/2006 [7/13/06] See plans for other comments. Once the intersection and ramp have been reviewed and found to be acceptable, and once all other comments above have been addressed, you will be able to go to mylars. Feel free to share pdfs or paper copies of any changes with us before going to mylar to avoid having to make revisions to the mylars. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6206. Sincerely, Anne H. Aspen City Planner Page 6 Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater Number: 206 Created: 7/14/2006 [7/14/06] Please add a note regarding the Kiosk construction on the site, landscape, and utility plan stating the thickness of the concrete slab and how the Kiosk can be removed (lifted) if ever the storm box culvert needed to be excavated. Number: 207 Created: 7/14/2006 [7/14/06] Please clearly state on the utility, storm sewer, and drainage sheets how the existing inlets on Cherry and Maple Streets are being modified and provide all the necessary details and/or blowup views. Number: 209 Created: 7/14/2006 [7/14/06] All proposed storm sewer connections to existing storm box culverts or pipes need to be clarified with details and notes. Please call our office for more information. Number: 210 Created: 7/14/2006 [7/14/06] All inlets need to be designed for structural strength and can not be left for the contractor to decide, like area inlet D. Number: 211 Created: 7/14/2006 [7/14/06] The water quality mitigation payment in lieu has been agreed upon and the details of payment needs to be worked out and included within the development agreement. Topic: Stormwater-Erosion Control Number: 208 Created: 7/14/2006 [7/14/06] 1. 1 did not find a project schedule or surety calculation, and a previous comment relating to a brief meeting with Bob Zakely has not been accomplished. Please schedule. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: WaterMastewater Number: 191 - Created: 7/11/2006 [7/11/06] Water services 2-inch and smaller do not require a tapped tee. Number: 192 Created: 7/11/2006 [7/11/06] Water Std Detail 5 not found in plans. Number: 193 Created: 7/11/2006 [7/11/06] Correct the water main fitting sizes as noted on plans. Number: 194 Created: 7/11/2006 [7/11/06] Sanitary sewer services must be connected by cutting tees into the sewer mains. Services tees should be directed up at approx a 45-degree angle as shown in sewer service detail (Std Detail 9). Number: 195 Created: 7/11/2006 [7/11/06] Add 8 x 6 reducer after the fire line branch in the ped spine water main. Number: 196 Created: 7/11/2006 [7/11/06] Add note to maintain 4 foot of clearance between meter pits and bldgs and trash enclosures. Page 5 [7/11/06] The construction phasing drawings now shown do help clarify. A concern regarding the phasing plan sheets is that the successive phasing numbers should not show the proceeding street phasing work. As an example, it would be beneficial to know if with the construction of Phase 2, how much pavement in and around the handicap stall that was previously installed with Phase 1 needs to be removed for Phase 2. By showing Phase 1's patching limits on Phase 2, this information cannot be verified. Add a note regarding requiring a sawcut between patching areas of successive phases. [5/5/06] With the phasing plan for utilities now being shown, there is a general question as to how each phase as it develops will tie into existing conditions. Please provide more detailed phasing showing how each successive phase of development ties into the existing conditions. The demo plan should be shown in phases as well. [10/26/05] The construction drawings showed phasing on the grading plan with regards to buildings, pedestrian spine, and parking structure. The phasing plan should also show how utilities are installed per phase as well as access. Of concern for example, does PFA need the entire parking structure built across Lots/Phases 1 & 2 to ensure through access to Cherry Street? The building numbers should be shown on this sheet for clarity. (Perhaps a new sheet should be created instead of using the grading plan.) [8/25/05] With the project intending to be phased, a phasing plan for the public improvements is required to be created on the construction drawings. Topic: Plat Number: 190 Created: 7/11 /2006 [7/11/06] The standard certificate of dedication language on the plat has been discussed by City legal staff and it was concluded that it doesn't seem to be appropriate given that the City is singing the plat as an owner. Please replace the Certificate of Dedication language on the plat with the following, which appears to better state the situation regarding the City's ownership of the property: "The easements as laid out and designated on this Plat shall be reserved by the City of Fort Collins from any conveyance of the land described herein to Penny Flats, LLC, provided, however, that reservation of said easements does not impose upon the city a duty to maintain the easements so reserved." Department: PFA Issue Contact: Carie Dann Topic: Fire Number: 200 Created: 7/12/2006 [7/12/06] MAINTENANCE OF FIRE LANE: The shadow projections cover the fire lane, which increases the likelihood of snow and ice covering the surface. The owner shall be responsible for ensuring that fire lane is maintained unobstructed at all times, including ice and snow. Language will need to be added to the Development Agreement to this effect. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Site Plan and Landscape Plan Number: 39 Created: 8/23/2005 [7/11/06] [5/2/06] Provide minimum 5 feet horizontal clearance between water main and kiosk, transformer and mailboxes. Page 4 part of a standard set forth by Parking Services in the downtown area and is implemented on the various block faces downtown. (Per staff review discussion on 7/12, the location of the parking spot should ideally be at the southeast corner of the site.) Number: 201 Created: 7/12/2006 [7/12/06] The access ramp on the south side of Maple Street tying into the crosswalk across Maple should be revised to not have the flare on the east side and mimic the curb transition on the west side for consistency. Number: 202 Created: 7/12/2006 [7/12/06] Provide additional information and clarity regarding the modification/additions to existing inlets along Maple and Cherry. For the new inlets along Cherry please call out the type and distinguish them in linetype from the existing for clarity. Also, how will these connect to the existing inlets? Number: 203 Created: 7/12/2006 [7/12/06] On Sheet C25 the crosswalk information is a little confusing for the crosswalk along Maple, is it intended to lineup with the access ramp on the north side of Maple? Why is it shown cutting into the sidewalk section? In general is it being verified that the crosswalk locations tie into the existing access ramps across the street in all areas? We should follow up with Transportation Planning to look at the crossings individually if they don't line up from existing to proposed access ramps. Number: 204 Created: 7/12/2006 [7/12/06] Per verification with Traffic Engineering, the use of striping for parallel parking along Mason Street should be removed as the City doesn't maintain this. Topic: General Number: 20 Created: 8/19/2005 [7/10/06] On Sheet C30, please remove the water quality planter detail as the use of these particular water quality features I understand is no longer being implemented. [5/5/06] Given the discussion at staff review regarding the possible payment to Stormwater in -lieu of providing water quality, the comment is deferred at this time. Should the water quality planter be used along Maple Street, additional information on the detail dimensioning the depth and slopes of the soil from the sidewalk edge should be provided. [10/26/05] The response indicated that a detail has been provided on the landscape plan with bike racks. The landscape plan shows the bike racks in plan view but no detail, instead a planting bed curb detail is provided. [8119/05] Please provide more detail information (beyond C5 of the construction plan set) as to the vertical depth of the planting bed for the street trees. I'm not aware of a situation in which landscaping and street trees are situated in an urbanized setting (without a grass parkway) of attached sidewalks where grates are not utilized to help ensure a smooth walking surface. How is the pedestrian less likely to inadvertently step in this landscape bed and possibly turn an ankle, trip, etc? A similar concept of these water quality beds were proposed on another project where a 1 foot drop to the planting bed was proposed, which looks like may not be occurring here. In that case, we wanted to explore the option of providing barrier curb with notches in the curb at location in order to provide the visual aspect of not being able to walk in this area unlike most other areas downtown where sidewalk grates are placed over the trees. Further discussion is needed. Number: 57 Created: 8/25/2005 Page 3 Department: Engineering Issue Contact: Marc Virata Topic: Construction Plans Number: 166 Created: 5/5/2006 [7/11/06] The concrete joint pattern detail is too faint to be noticed on the grading plan sheets. Please provide a more noticeable lineweight/linetype (also, remove the existing striping to prevent confusion). Provide a typical dimensioning of the pattern length and width. In checking with our Engineering Inspector, please also indicate the use of expansion joints between the gutter pan/spill gutter and the concrete pavement section as well as specifying the use of expansion joints on the concrete pavement section at intervals not to exceed 100 feet. In addition, it should be indicated that these areas shall adhere to the City's concrete pacing standards and that all joints are to be sealed. [5/5/06] Please provide a concrete scoring and joint pattern detail for the concrete areas of inset parking along Maple Street and Mason Street. Number: 171 Created: 5/5/2006 [7/11/06] A variance request was received. In general, we'd like to do some further investigation of the ridability and maintainability of the street section in response to the cross slope information provided. If there is excessive undulation along the travel way as a result of the neckdowns in conjunction with inleflocations and existing -grades, pertiaps the design should look at a quarter crown situation where the grades steepen up along the parking areas but are less steep along the travel way. Providing flowline and centerline elevations along Maple and Howes will help in the review of how the street systems will function. [5/5/06] There are locations along Maple Street and Howes Street where cross slopes along the street do not meet our 2-3% requirement. Howes Street is notably out of compliance where the neckdown is being incorporated. Please look at the cross slopes along these two streets. Additionally, please provide cross slopes (existing and proposed) along these two streets at 50 foot intervals and at several points along each of the neck downs to help ascertain how much of the cross slope concerns are due to existing conditions verses caused by the design. Number: 173 Created: 5/5/2006 [7/11/06] The information shown specifies 8% grades behind the sidewalk, which is steeper than I had thought the applicant was looking to achieve. Per our discussion at the staff review on 7/12, additional information will be provided and reviewed by the City for possible concerns. [5/5/06] Please provide a construction drawing illustrating the subsurface area of the buildings to help illustrate how the parking structure area is situated in relation to right-of- way and easements as well as how elevations are continued from the entrances of the parking garage(s) to the basement. Number: 189 Created: 7/11/2006 [7/11/06] The street patching shown needs to be expanded for the patching along Maple Street between the crosswalk and the fiber optic line in accordance with our patching repair standards (25.7.2.B.6 of LCUASS). This may also be the case for the patching along Maple Street between the crosswalk and the fiber optic line needing to be connected (see Sheet C7), provided that patching is needed for the access ramp instead of a clean edge being maintained to pour the concrete against. Number: 199 Created: 7/11 /2006 [7/11/06] The handicap parking stall along Maple Street will need to be widened to accommodate loading on either side, which will result in the losing of a parking spot. This is Page 2 STAFF PROJECT REVIEW Citaof Fort Collins COBURN DEVELOPMENT INC. Date: 07/14/2006 DANIEL ROTNER 1811 PEARL ST. BOULDER, CO 80302 Staff has reviewed your submittal for PENNY FLATS (BLOCK 33) PDP AND FINAL PLANS - TYPE I, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Anne Aspen Topic: General Number: 186 Created: 7/7/2006 [7/7/06] The USPS comments as follows (though I see that you have shown mailbox locations on your site plan...: "Mail Service: Centralized delivery using a minimum of 10 centralized box units (industry - type III) is required -Revise plan to show the required CBU locations as approved by the US Postal Service. In all cases the CBUs must be located in the public right-of-way or a designated easement. Be advised the responsibility of purchase and maintaining the CBUs with the concrete pads is that of the owner/developer/builder/HOA. Prior to occupancy within the development, approved mail receptacles will be in place. Delivery Agreement will be in place prior to any delivery of mail. Contact Bonnie Ham Growth Coordinator, US Postal Service, 301 E. Boardwalk, Fort Collins, CO, phone 970-225-4130, cell 970-214- 3668, fax 970-225-4139. Number: 187 Created: 7/7/2006 [7/7/06] The following departments and agencies indicate that they have no further concerns or issues with the proposed: Zoning. Number: 212 Created: 7/14/2006 [7/14/06] As discussed in staff review, please forward a profile (and plan detail if needed) of the ramp into the underground parking structure to me. I will pass along to Marc V, David A and Ward S. and we will get back to you shortly with any comments or concerns before you go to mylar. Number: 213 Created: 7/14/2006 [7/14/06] Please forward a plan detail of the intersection of Maple and Howes as well and I'll forward it on to the same staff group for review before you go to mylars. Topic: Site Plan (SA3.2) Number: 188 Created: 7/7/2006 [7/7/06] Please add a bollard or sign at the top of the turnaround space indicated on the redlines. Also, the parking reconfiguration has added a couple of tight spots that I think will need back-up spaces. Page 1