Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6750.
Sincerely,
Shelby Sommer
Associate City Planner
Page 6
and the south side, along Birch Street). The address needs to be on both sides, to
identify that the building is addressed off Shields and not Birch. And including the
street name, along with the numeral, will not only look classier, it also will help
convey the address.
[5/2/07] STREET ADDRESSING: Please note that PFA is emphasizing consistency
in addressing. Future projects shall comply with International Fire Code and PFA
policy, which require that buildings be addressed off the street that provides access
to the site. In the future, a project such as this will receive a Birch Street address,
which is the actual, accurate street that provides access onto the site. The two lots in
this project at one time had Shields Street access; however, the development is
starting from scratch, the property is being redeveloped, and access is not off
Shields Street. PFA's emphasis on consistent addressing requirements ensures
accurate, clear addressing, which enables PFA to provide emergency services as
expediciously as possible.
Department: Stormwater-Water-Wastewaterlssue Contact: Wes Lamarque
Topic: Stormwater
Number: 71 Created: 3/16/2007
[12/11/07] OK to go to hearing.
[5/2/07] Repeat Comment -The comment below can be addressed with an informal
meeting at City Utilities.
[3/16/071 After the amount of detention volume is agreed upon, the grading plan
reviewed to show this volume is achievable, offsite flows shown to safely pass
through the site, PDP can go to a hearing.
Number: 88 Created: 5/2/2007
[12/11/07]
[5/2/07] The detention pond needs to have some freeboard. This can be discussed
at Final Compliance.
The pond has multiple overfloiv spill points.
Department: Stormwater-Water-Wastewaterlssue Contact: Roger Buffington
Topic: Water/Wastewater
Number: 118 Created: 12/11 /2007
[12/11/07] Fire hydrant east of Shields on Birch does not have adequate
clearances. Move to location with minimum of 5 feet clear on all sides. As shown,
there is also no undisturbed soil behind hydrant for a thrust block. In this situation,
all joints, fittings and valves need to be restrained.
The fire hydrant has been moved to the other side of water meter to give it proper
clearance.
Number: 119 Created: 12/11/2007
[12/11/07] The sanitary sewer that extends north from Birch to Coy was replaced
during summer of 2007. Revise note to delete reference to the replacement of this
sewer.
The note has been removed
Pa„e i
[12/11/07] Please fix all line over text conflicts in the Coy Street design profile.
Mask text if needed. (TYP)
Acknowledged
Number: 113 Created: 12/11 /2007
[12/11/07] Please clearly show, label and dimension the Coy Street R.O.W. and
U.E. on the Coy design plan view.
Acknowledged
Number: 114 Created: 12/11 /2007
[12111/07] The information shown on the Coy Street design centerline profile at the
pan is not clear to me. You are showing it coming in at .05 percent and also 3.5
percent on both sides. Show only the proposed slopes at the centerline.
One profile is the design profile that. lowlilnes are based on, and the other is the profile
of the crown transition. The two profiles are now labeled.
Number: 115 Created: 12/11 /2007
[12/11/07] Please fix the text on the LCUASS details on sheet 7. The text is too
heavy and will not scan or copy well.
Acknowledged
Number: 116 Created: 12/11 /2007
[12/11/07] Please see redline comments on the Plat and Site plan and verify that all
of the plans are consistent with each other.
The plans should be consistent now.
Number: 117 Created: 12/11 /2007
[12/11/07] The Coy Street local portion cost estimate is currently still under review
by Street Oversizing. This will be completed prior to final compliance and
development agreement preparation.
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric Utility
Number: 73 Created: 4/24/2007
[12/4/07]
[4/24/07] The developer will need to coordinate power requirements by providing a
completed Commercial Service (C-1) form to Light & Power Engineering. The reply
comments to the previous round of City staff comments indicated that the form was
attached to the resubmittal. The form was not included in the Light & Power packet
for the resubmittal.
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 90 Created: 5/2/2007
[12/12/07] ADDRESSING: I recommend that you put "609 S. Shields" or "609 S.
Shields St." on BOTH street -facing sides of the building (east side, along Shields,
Page 4
Number: 105 Created: 12/11 /2007
[12/11/07] Please remove any landscape layers from the Utility Plan set. This can
all be shown on the Landscape Plan and adds clutter to an already busy plan.
Layer has been removed
Number: 106 Created: 12/11 /2007
[12/11/07] The stop bar on the Shields egress access should be shown more
perpendicular to the path of travel. It will not work well as shown and should be
rotated at the north end.
This has been changed.
Number: 107 Created: 12/11 /2007
[12/11/07] Construction sequencing information is not required on the Utility Plan
set. Please remove.
Table has been removed
Number: 108 Created: 12/11 /2007
[12/11/07] Please clearly label & dimension the Coy Street R.O.W. and U.E. on the
Grading, Utility and Street Design sheets (TYP).
Dimensions have been moved around,for better clarity. Missing lines have been placed
back on the drawing.
Number: 109 Created: 12/11 /2007
[12/11/07] There are a couple walls shown on the northerly boundary. Please label
them consistently throughout the plans and indicate if they are retaining at all. If
retaining, we will want a cross section and elevations TW/BW shown and a note that
any retaining walls over 30" require a separate building permit.
The Nall is a short landscape wall less than 30" high. Top and bottom elevations are
now shown.
Number: 110 Created: 12/11 /2007
[12/11/07] The Utility Plan sheet (sheet 4) shows a note to provide two 4 inch
conduits. You will need to show the exact location of these conduits more clearly
and where they extend to.
The conduits have been removed
Number: 111 Created: 12/11 /2007
[12/11/07] The south flowline profile shows a single point grade break that exceeds
the max allowable of 0.4 percent. Please provide a series of grade breaks or vertical
curve.
A vertical curve has been used on the profile.
Number: 112
Created: 12/11 /2007
Page 1
Department: Engineering Issue Contact: Randy Maizland
Topic: Engineering
Number: 98 Created: 12/11/2007
[12/11/07] The Sheet Index on the Utility Plan set indicates a Plat will be included
for reference but it is not in the plan set. Please insert the final plat with your next
submittal.
Acknowledged
Number: 99 Created: 12/11/2007
[12/11/07] Update the date/year on the cover sheet of the Utility Plan.
Acknowledged
Number: 100 Created: 12/11/2007
[12/11/07] The plotter seems to be having some problems. Unwanted lines though
text etc... Please correct for any final plan submittals & mylar plotting.
Acknowledged
Number: 101 Created: 12/11/2007
[12/11/07] The driveway cross section A-3 on the Grading sheet is not entirely clear.
Please show the profile cross section and dimensions only where the section is
taken. Do not include background information.
The driveway cross section has been revised.for clarity.
Number: 102 Created: 12/11/2007
[12/11/07] Please clearly show label and dimension the limits of R.O.W. and Utility
Easements on all of the utility Plan sheets (TYP). See redlines.
Dimensions have been moved around fbr better clarity.
Number: 103 Created: 12/11/2007
[12/11/07] The sidewalk on Birch Street does not fit entirely in the R.O.W. therefore,
you will need to either dedicate additional R.O.W. or dedicate the easement behind
the R.O.W. as Utility and Access to include the sidewalk. The Plat, Utility Plans and
Site Plan should all reflect this consistently. See redlines for clarification.
Acknowledged
Number: 104 Created: 12/11/2007
[12/11/07] The proposed sidewalk on Shields is not shown in the correct location.
The sidewalk should be shown in the ultimate location with the back of sidewalk at
the R.O.W. limits. If the street is widened to the ultimate condition (constrained
arterial 102" wide) the sidewalk will not need to be reconstructed in the future. The
ramp on the south side of the Shields access should be lined up with the cross walk
and ultimate sidewalk rather than skewed into the site. The directional ramp at the
Shields/Birch intersection should be relocated to line up with the ultimate sidewalk.
Per the meeting at City of'Ft. Collins 12120107. the sidewalk has been moved to 2 '
East of the R.O. W... t/he ramps have been moved to serve the new walks.
Page 2
6aSTAFF PROJECT REVIEW
Citvof Fort Collins
Don Brookshire Date: 12/14/2007
Eastpoint Studio, LLC
552 Kinnikinnik Ct.
Windsor, CO 80550
Staff has reviewed your submittal for HELLENIC PLAZA PDP (635 S. SHIELDS ST.)
- TYPE I, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Shelby Sommer
Topic: Landscape plan
Number: 95 Created: 12/10/2007
[12/10/07] In order for ornamental trees to be counted as "mitigation trees" they
must be a minimum 2 1/2" caliper. 2" is shown on the plans. The 3" shade trees
shown are fine.
Number: 96 Created: 12/10/2007
[12/10/071 On the southwest corner of the site there appears to be a light pole
directly in the middle of the sidewalk. The sidewalk also crosses the concrete drain
pan at this location. Please revise to provide uninterrupted sidewalk from Birch St.
to the north side of the property.
Number: 97 Created: 12/10/2007
[12/10/07] You will need to submit a modification request for Section 3.2.2(J) to
reduce the landscape setback along the west property line from 5 feet to 3 feet.
Topic: Site Plan
Number: 92 Created: 12/10/2007
[12/10/07] It would be helpful to have a Land Use Statistics table for the entire PDP
in addition to the MMN and NCB tables shown on the cover sheet. This was
discussed with the previous designer but not incorporated into this round of review.
Number: 93 Created: 12/10/2007
[12/10/07] As you may remember, this project was waiting for the July 2007 code
change that allowed "Type 2" uses in mixed -use buildings, as part of a "Type 1"
review. You may want to revise the proposed uses in the MMN to be more inclusive
of those "type 2" uses since you waited for that code change to come into effect.
Number: 94 Created: 12/10/2007
[12/10/07] Convenience retail is not a permitted use in the NCB Zone District.
Please correct proposed uses prior to hearing.