HomeMy WebLinkAboutJORDAN-LEBESCH GUEST HOUSE - PDP - 38-05 - CORRESPONDENCE - (3)appropriate development review process by City staff and affected outside
reviewing agencies. The new guest house is subject to an administrative
(Type I) review and public hearing.
8. The City's Current Planning Department will accept the development
requests and will coordinate the development review process. The required
submittal packages will be submitted to this department and distributed
accordingly to other City departments and outside reviewing agencies
involved in development review.
9. This development proposal is subject to the requirements as set forth in the
City's LUC, specifically Articles 2. Administration (Development Review
Procedures), Article 3. General Development 5tandards, and Division 4.6 -
Neighborhood Conservation, Low Density Zoning District. Copies of these
Articles are available in the Current Planning Department or on the City of
Fort Collins website @ www.fc og v.com. Go to Departments, then the Current
Planning Department, to find the City's LUC.
W
imperviousness then water uag ntity detention is not required. Parking
lot detention is allowed as long as it is not deeper than one foot.
Since this project will probably add over 350 square feet of
imperviousness a site grading plan is required.
C. The standard drainage and erosion control report and construction
plans may be required. If so, they must be prepared by a professional
engineer registered in the State of Colorado.
d. The property is in the City's Old Town floodplain, but due to the
process the project is following it is exempt from the current
floodplain regulations. The applicant, however, is being cautioned that
the property is subject to flooding and should consider elevating the
new structures (new residence and guest house) 18" above the 100-
year floodplain elevation.
Please contact Glen, at 224-6065, if you have questions about these
comments.
5. Rob Irish of the Light A Power Department offered the following
comments:
a. There is existing City electric in the alley along the rear of the
property and it is undergrounded.
b. Any relocation of existing electric service or any necessary system
modifications will be at the property owner's expense.
C. There will be electric capacity charges assessed for the new
development on this property.
Please contact Rob, at 224-6167, if you have questions about these
comments.
6. Dave Averill of the Transportation Planning Department indicated that the
development plan must provide for necessary sidewalks for pedestrian
connectivity to the buildings.
7. This development request will be subject to the Development Review Fee
Schedule that is available in the Current Planning Department office. The
fees are due at the time of submittal of the required documents for the
4
A Development Agreement may be required and a Development
Construction Permit will definitely be required for development on
this property.
Please contact Katie, at 221-6750 or 221-6605, if you have questions about
these comments.
3. Roger Buffington of the Water/Wastewater Department offered the
following comments:
a. There is an existing 4" water main in West Mountain Avenue.
b. There is an existing 8" sanitary sewer main in the alley along the
south side of the property. This main may have to be relocated.
C. Separate water and sanitary sewer services may be required to each
building.
d. Provide easements, as necessary, for water and sanitary sewer
services to the buildings.
e. Plant investment fees and water rights may apply and, if so, they will
be collected at the time of issuance of building permits.
Please contact Roger, at 221-6854, if you have questions about these
comments.
4. Glen Schlueter of the Stormwater Utility offered the following comments:
a. The site is located in the Old Town Drainage Basin, where the new
development fee is $4,150 per acre, which is subject to the runoff
coefficient reduction. This fee would be paid at the time of issuance
of building permits. The fee is charged when there is an increase in
imperviousness greater than 350 square feet. This proposal is for a
new 16' x 18' structure, which would be 288 square feet in size, plus
the new imperviousness associated with increasing the footprint of
the existing building (main house) that is being replaced.
b. On -site detention is required with a 2-year historic release rate for
water quantity and extended detention is required for water ug ality
treatment. If there is 5,000 square feet or less of new
3
2. Katie Moore of the Engineering Department offered the following
comments:
a. The standard utility plan submittal requirements will apply to the
development request.
b. Street oversizing fees will apply to this development request. The
fees are based on the vehicle trip generation for the proposed land
use(s) on the development plan. Please contact Matt Baker of
Engineering, at 224-6108, for detailed information on the fees. The
fees will be collected at the time of issuance of building permits.
C. The Lorimer County Road Impact Fees will apply to development on
this property.
d. This development will be subject to the requirements set forth in the
Lorimer County Urban Area Street Standards (LUCASS) as they
pertain to public improvements.
• It is probably OK to submit a combined Site/Landscape/Utility
Plan for this Project Development Plan (POP) request.
e. A Transportation Impact Study (TI5), addressing all modes of
transportation, may be required with your development submittal.
Please contact Eric Bracke of the Traffic Operations Department,
at 224-6062, and David Averill of the Transportation Planning
Department, at 221-6608, to determine what information would be
needed in the TIS pertaining to Level of Service (LOS) for vehicle,
pedestrian, bicycle, and transit modes of transportation if one is
required.
f. New development on this property will be responsible for dedicating
the necessary 8' wide utility easement along the alley.
g. New development on this property will be responsible for repairing or
replacing any damaged curb, gutter, or sidewalk adjacent to the
property.
h. New development on this property will be responsible for the
undergrounding any existing overhead utility lines.
N
MEETING DATE. August 16, 2004
ITEM: New Guest House on Rear of Lot at 1427 West
Mountain Avenue
APPLICANT: Craftsmen Builders
c/o Steve Josephs
319 East Magnolia Street
Fort Collins, CO. 80524
LAND USE DATA:
Request for 16' x 18' guest house structure on the rear of the lot, next to the
existing garage, at 1427 West Mountain Avenue. There currently is an existing
single-family residence on the front of the lot. The property is located on the
south side of West Mountain Avenue, between McKinley Avenue (to the east) and
Roosevelt Avenue (to the west). The property is in the NCL - Neighborhood
Conservation, Low Density Zoning District in the City of Fort Collins.
COMMENTS:
Jenny Nuckols of the Zoning Department offered the following comment:
a. The property is in the NCL - Neighborhood Conservation, Low Density
Zoning District.
b. The proposed guest house on the rear of the lot apparently will
contain water and/or sewer service. In Section 4.6(0)(3) of the
City's Land Use Code (LUC) this type of structure is defined as an
"Accessory Building with Habitable Space (or Potential Future
Habitable 5pac -- ich-is permitted in this District, subject to an
administrati e (Type I) review and public hearing.
Please contact Jenny, at 416-2313, if you have questions about these
comments.