[ 10/ 12 / 05] There needs to be some differentiation in the line weights on
the Site & Landscape Plans.
JCL Architecture Response [11128105]: Line weights adjusted..
Number 57:
[10/ 12/05] Please clarify some of the symbols on the Site & Landscape
Plans.
JCL Architecture Response [11128105]: Symbols have been clarified as
requested.
This development request has been scheduled for an administrative public
hearing on Thursday, November 10, 2005 at 3:30 p.m. at 281 North
College Avenue.
Be sure and return all red -lined plans when you re -submit.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours Truly,
Steve Olt
City Planner
cc: Dan DeLaughter
Stewart & Associates
Project File #34-05
Page 7
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Uti lity p lans
Number: 16 Created: 9 / 7/ 2005
[10/ 11/05] Add note to define the connection as shown on the redlined
plans.
Stewart 8t Associates Response: Added Mote.
[9/7/05] Clearly define all connections to the existing water main.
Stewart & Associates Response: Defined connection.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: Zoning
Number: 2 Created: 8 / 22 / 2005
[9/30/051
[8/22/05] There is no building wall articulation along the south and north
elevations - see section 3.5.3(D)(2)
JCL Architecture Response [11128105]: There is a color and panel change on
south side.
Number: 3 Created: 8 / 22 / 2005
[9/30/051
[8/22/05] Add a note to the landscape notes regarding installation of
landscaping prior to issuance of a CO.
JCL Architecture Response [11128105]: Noted has been added.
Number: 4 Created: 8 / 22 / 2005
[9/30/05]
[8/22/05] On landscape plan, there are no foundation plantings being
shown nor are there any street trees being shown along Hickory. Please
review article 3 of the Land Use Code for landscaping requirements.
9-30-05 Landscaping is insufficient. Does not meet tree stocking
requirements, does not meet foundation planting requirements, nor
perimeter requirements.
JCL Architecture Response [11128105]: JCL has met with Advanced Planning
- the updated landscape plan reflects the planting agreed upon.
Page 6
2. The Site Plan and Landscape Plan show an additional line for a City
Floodway that does not exist. These lines have been removed from the
grading and utility plans. Please remove these lines from the site plan and
landscape plan.
JCL Architecture Response [11128105]: Line has been removed.
3. Please revise the base flood elevation and floor elevation on the site
plan. - REPEAT COMMENT
JCL Architecture Response [11128105]: Revised as requested.
Topic: Stormwater
Number: 24 Created: 9 / 9 / 2005
[ 10/ 11 / 05] Project can go to a hearing.
[9/9/05] Project can go to a hearing after building is elevated to the correct
elevation. No more 50% comments. More comments will be presented at
final compliance submittal.
Department: Transportation Planning
Issue Contact: Kurt
Ravenschlag
Topic: Utility plans
Number: 35
Created: 10/ 11 / 2005
[ 10/ 11 / 05] No Comments
Department: Water Wastewater
Issue Contact: Roger
Buffington
Topic: Utility plans
Number: 33
Created: 10 / 11 / 2005
[10/ 11/05] Show and label the ELCO water main in Hickory Street.
Stewart & Associates Response: ELCO water tine has been labeled.
Number: 34 Created: 10/ 11 / 2005
[10/ 11/051 Provide insulation for all portions of the sanitary sewer with
less than 4 feet of cover. Insulation must be the type specifically made for
underground applications. Submit design of the insulation for review.
Include specifications for the insulation on the plans. (I have a contact
name for product and design information.) THIS IS A FINAL COMPLIANCE
ITEM.
Stewart 8a Associates Response: Added insulation note over shallow
sewer.
Page 5
Number: 51 Created: 10/ 12/2005
[10/ 12/051 Reference current/updated soils investigation report on cover
sheet.
Stewart & Associates Response: Corrected cover sheet.
Number: 52 Created: 10/ 12/2005
[10/ 12/05] Show curb return details including spot elevations to verify that
minimum grades are met (FC).
Stewart & Associates Response: Added spot elevations for curb
returns.
Number: 53 Created: 10/ 12/2005
[10/ 12/05] Please see redlines for additional minor revisions.
Stewart & Associates Response: Modified construction set.
Topic: Technical Services
Number: 54 Created: 10/ 12/2005
[10/ 12/05] Technical Services would like to know how the ROW is
dedicated along Hickory.
Stewart & Associates Response: By previous projects.
Number: 55 Created: 10/ 12/ 2005
[10/ 12/05] Technical Services comment: The South ROW is not parallel
with the E/W section line.
Stewart & Associates Response: See previous projects for ROW
alignment.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: FloodpIain
Number: 32 Created: 10/ 11 / 2005
[10/11/05] 1. Critical facilities are not
allowed in the floodplain. This includes storage or use of hazardous,
flammable, toxic, or water reactive materials. See the definition in Chapter
10 of City Code. Please describe in the drainage report that there will not be
any materials meeting the critical facilities definition stored or used in this
building. If there are any questions about material storage, please submit a
copy of the Hazardous materials impact analysis and material safety data
sheets for those items. - REPEAT COMMENT
Stewart & Associates Response: We reference chapter 10 as you
requested - now we have added the above verbiage to our report.
P�i-c 4
Stewart & Associates Response: Added sleeve in note to plans.
Number: 46 Created: 10/ 12/2005
[10/ 12/051 Show, label, dimension all easements on plat, overall utility
plan.
Stewart & Associates Response: All easements on plat and utility
plan labeled.
Please use a concrete hatch pattern for all sidewalk and standard driveway
approaches to back of ROW.
Stewart & Associates Response: We have been told by your scanning
department, hatch patterns are not allowed.
Number: 47 Created: 10/ 12/2005
[10/ 12/05] Label all existing and proposed utilities. It does not appear that
you've labeled existing gas.
Stewart & Associates Response: Existing and proposed gas have been
added to the utility plan.
Number: 48 Created: 10/ 12/2005
[10/ 12/05] Inconsistent line types are used on profile sheets for contours.
Please revise.
Stewart & Associates Response: Acknowledged and corrected.
Number: 49 Created: 10/ 12/2005
[10/ 12/05] Show the locations of the transformers on the utility plan set.
Stewart 8s Associates Response: Added location of transformer to
utility plan.
Number: 50 Created: 10/ 12/ 2005
[10/ 12/05] Please provide the following standard details:
a. 1601 Standard Sidewalk
b. 1602 Sidewalk Detail- modified to show tree grates
C. 1603 Access Ramp Details
d. 1607 Access Ramp Scoring
e. 2501 (If needed) Sidewalk Widening Detail
Stewart & Associates Response: Added detail sheet with requested
details.
Number: 40 Created: 10/ 12/2005
[10/ 12/05] Entry gates to the property must be far enough back from the
road to allow a standard vehicle to stop behind them and not encroach onto
the street or sidewalk (20'?).
Stewart & Associates Response: The gate has been set back to allow
for one car length as shown on architect site plan.
JCL Architecture Response [11128105]: Entry gate is set 20' from curb as
discussed. This will be clear of parking and bike lanes.
Number: 41 Created: 10/ 12/2005
[10/ 12 / 05] Existing features should be shown in a gray or dashed line
type.
Stewart & Associates Response: Acknowledged.
Number: 42 Created: 10/ 12/2005
[10/ 12/05] Show parking islands around power poles on the overall utility
plan set to match the site plan.
Stewart & Associates Response: Site plan modifications have been
added to the construction set.
Number: 43 Created: 10/ 12/2005
[10/ 12/05] What is happening with the sidewalk along Hickory Street?
Please show clearly which sections are to be removed and replaced and
which sections you plan to widen. Any widening must be at least 4' in
width.
Stewart 8s Associates Response: Sidewalk improvements are shown on
architectural site plan.
JCL Architecture Response 111128105]: Entire sidewalk to be replaced as
shown on Sheet 1.
Number: 44 Created: 10/ 12/2005
[10/ 12/05] Include power and gas in your legend.
Stewart & Associates Response: Added to legend.
Number: 45 Created: 10/ 12/2005
[10/ 12/05] Please indicate on the overall utility plan that a PVC sleeve will
be installed N/S for future power line undergrounding. Please note which
power lines are to be undergrounded by Fort Collins Light 8v Power.
Page 2
STAFF PROJECT REVIEW
Cityof Port Collins
JCL Architecture [Original] Date: 10/21/2005
c/o Justin Larson
201 South College Avenue [Response] Date: 11/30/2005
Studio 205
Fort Collins, CO. 80521
Staff has reviewed your submittal for VALLEY STEEL ADDITION, PDP -
TYPE 1, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Dan
DeLaughter
Topic: General
Number: 36 Created: 10/ 12/2005
[10/ 12/05] See redlines for remaining scanability issues -minor.
Stewart & Associates Response: Modified plans for scanability
issues.
Number: 37 Created: 10/ 12/2005
[10/12/05] Repeat: Grading still doesn't tie into existing contours.
Stewart & Associates Response: The grading plan has been modified
to show proposed contours connecting into the existing contours.
Number: 38 Created: 10/ 12/2005
[10/ 12/05] Add standard street cut note: "Limits of street cut are
approximate. Final limits are to be determined in the field by the City
Engineering Inspector. All repairs to be in accordance with City street
repair standards."
Stewart & Associates Response: Added standard street cut note to
sheets 2 & 3.
Number: 39 Created: 10/ 12/2005
[10/ 12/05] Label and dimension the ROW along Hickory Street for the
portion to the East of your property. We need to be sure that the ROW has
actually been dedicated before the sewer can be built.
Stewart & Associates Response: This is being looked into.