November 10, 2005 Administrative Hearing
Page 5
3.. The change of use plan complies with all applicable Land Use and
Development Standards contained in Article 4, Division 4.18 of the Land
Use Code.
RECOMMENDATION:
Staff recommends approval of the Valley Steel Addition, 200 Hickory Street -
Project Development Plan - #34-05.
Valley Steel Addition, 200 Hickory Street - PDP, #34-05
November 10, 2005 Administrative Hearing
Page 4
C. Division 3.5, Building Standards
1. Section 3.5.1, Building and Project Compatibility
The building height will be from 17'-6" to 26-6", with a sloped roof
from west to east.
Section 4.18(D) in the CN, Commercial - North College
District in the LUC states that the maximum height for all
buildings shall be 3 stories. The proposed maximum building
height of 26'-6" is well under the height allowed.
2. Section 3.5.3, Mixed Use, Institutional and Commercial Buildings
The proposal is exempt from the standards set forth in this section
in that the new warehouse building is intended solely for industrial
use.
4. Neighborhood Information Meeting
The Valley Steel Addition, 200 Hickory Street - PDP contains a proposed
land use that is permitted in the CN, Commercial - North College Zoning
District subject to an administrative (Type 1) review. The proposal is for a
new 19,000 square foot warehouse building to be used for steel storage.
The new building would be directly west of the existing building. The LUC
does not require that a neighborhood meeting be held for a Type 1
development proposal and a City -facilitated neighborhood meeting was
not held to discuss this proposal.
FINDINGS OF FACT/CONCLUSIONS
After reviewing the Valley Steel Addition, 200 Hickory Street - PDP, staff makes
the following findings of fact and conclusions:
1. The proposed land use is permitted in the CN, Commercial - North
College Zone District.
2. The proposed new warehouse building plan complies with all applicable
General Development Standards contained in Article 3 of the Land Use
Code.
Valley Steel Addition, 200 Hickory Street - PDP, #34-05
November 10, 2005 Administrative Hearing
Page 3
Street, just to the east of its proposed new warehouse building. The
proposed new building site is approximately 1,000' west of North College
Avenue.
3. Article 3 of the Land Use Code — General Development Standards
The change of use request complies with applicable General Development
Standards as follows:
A. Division 3.2, Site Planning and Design Standards
1. Section 3.2.1, Landscaping and Tree Protection
a. The proposal complies with Section 3.2.1(D)(2)(b) in that new
canopy shade (street) trees are provided in cutouts in the
sidewalk along Hickory Street.
b. The proposal satisfies the Landscape Area Treatment standards
set forth in Section 3.2.1(E)(2) by providing foundation plantings
along the south side of the building adjacent to Hickory Street
and shrub hedges between the fencing and sidewalk along
Hickory Street.
2. Section 3.2.2, Access, Circulation and Parking
a. The proposal complies with Section 3.2.2(C)(4)(a) in that it
provides secure and conveniently located bicycle parking that
will satisfy the minimum requirement of 5% of the total number
of automobile parking spaces on -site. The bicycle rack near the
front entry to the building will accommodate 2 - 4 bicycles and
there will be only 1 vehicular parking space on -site.
b. The proposal complies with Section 3.2.2(K)(5) in that it
provides 1 van accessible handicapped parking space for the
19,000 square foot warehouse (industrial use) building..
B. Division 3.3, Engineering Standards
1. Section 3.3.5, Engineering Design Standards
The proposal complies with the design standards, requirements,
and specifications for the services as set forth in this section.
Valley Steel Addition, 200 Hickory Street - PDP, #34-05
November 10, 2005 Administrative Hearing
Page 2
Warehouses and distribution facilities if located at least 200' from North College
Avenue are permitted in the CN, Commercial — North College Zoning District,
subject to administrative review. The purpose of the CN District is:
Intended for high traffic commercial corridors where a range of uses is
encouraged to create a transition from commercial operations on a
highway, arterial street or rail spur, to less intensive use areas or
residential neighborhoods. This designation is only for areas identified for
its application in the North College Corridor Plan.
This proposal complies with the purpose of the CN District as it is a permitted
land use in the developed North College Avenue business/commercial corridor.
Valley Steel already exists at 200 Hickory Street, just to the east of its proposed
new warehouse building. The proposed new building site is approximately 1,000'
west of North College Avenue.
COMMENTS:
Background
The surrounding zoning and land uses are as follows:
N: CN;
vacant land
S: CN;
vacant land
E: CN;
existing commercial uses
W: CN;
existing commercial uses
The property was annexed in December, 1959 as part of the College
Avenue, North, Consolidated Annexation.
The property has not previously been platted.
2. Division 4.18 of the Land Use Code, Commercial - North College Zone
District
Warehouses and distribution facilities if located at least 200' from North
College Avenue are permitted in the CN, Commercial — North College
Zoning District, subject to administrative (Type 1) review.
This proposal complies with the purpose of the CN District as it is a
permitted land use in the developed North College Avenue
business/commercial corridor. Valley Steel already exists at 200 Hickory
�a ^ ITEM NO.
MEETING DATE t Q �Y
STAFF 6TeV14 *Gt`l 0 t_-i"
Citv of Fort Collins HEARING OFFICER
STAFF REPORT
PROJECT: Valley Steel Addition, 200 Hickory Street - Project
Development Plan (PDP) - #34-05
APPLICANT: JCL Architecture
c/o Justin Larson
201 South College Avenue
Fort Collins, CO. 80524
OWNER: Randy Wright
11701 Kinard
North Little Rock, AR. 72117
PROJECT DESCRIPTION:
This is a request for an addition to the existing Valley Steel operation. The
proposal is for a new 19,000 square foot warehouse building to be used for steel
storage. The new building would be directly west of the existing building. The
property is at 200 Hickory Street and is in the CN, Commercial - North College
Zoning District.
RECOMMENDATION: Approval
EXECUTIVE SUMMARY:
This PDP complies with the following applicable requirements of the Land Use
Code LUC , more specifically:
the process located in Division 2.2 - Common Development Review
Procedures for Development Applications of ARTICLE 2 -
ADMINISTRATION;
standards located in Division 3.2 - Site Planning and Design
Standards, Division 3.3 - Engineering Standards, and Division 3.5 -
Building Standards of ARTICLE 3 - GENERAL DEVELOPMENT
STANDARDS; and
permitted uses and standards located in Division 4.18, Commercial -
North College District of ARTICLE 4 - DISTRICTS.