Loading...
HomeMy WebLinkAboutVALLEY STEEL ADDITION - PDP - 34-05 - CORRESPONDENCE -REVISION ROUTING SHEET . ' Item: V G J J2)� Sfee ( t Date Received: Planner: S!e i Engineer: 1)e, beL,4 2ti�� cunt l/oe? File -_Project Planner Advance Planning Building InspectionTechnical ■■■■■■�■■■■■■■■■ Engineering Engineering Pavement. Natural Resources Park Planning Post Office loss ■■■■■■■■■■■■■■■■ Services— .1 oil Transportation Planning Water & Wastewater Water Conservation .:. ................ :........ ................ Schools: Poudre Thompson 1 Department: Current Planning Issue Contact: Steve Olt Topic: General Number: 56 [ 10/ 12/051 There needs to be some differentiation in the line weights on the Site & Landscape Plans. Number 57: [ 10/ 12/051 Please clarify some of the symbols on the Site & Landscape Plans. *s*s**sst**:****s**s*ssss**s**s**st*ss****s**ss*s*s*•ss•s.sss.s.sesss***•**:**rss:.:s This development request has been scheduled for an administrative public hearing on Thursday, November 10, 2005 at 3:30 p.m. at 281 North College Avenue. Be sure and return all red -lined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truly, AZO - Steve Olt City Planner cc: Dan DeLaughter Stewart & Associates Project File #34-05 Page 5 Department: Water Wastewater Issue Contact: Roger Buffington Topic: Utility plans Number: 33 Created: 10/ 11 /2005 [ 10/ 11 /05) Show and label the ELCO water main in Hickory Street. Number: 34 Created: 10/ 11 /2005 [ 10/ 11 /05) Provide insulation for all portions of the sanitary sewer with less than 4 feet of cover. Insulation must be the type specifically made for underground applications. Submit design of the insulation for review. Include specifications for the insulation on the plans. (I have a contact name for product and design information.) THIS IS A FINAL COMPLIANCE ITEM. Department: Water Wastewater Issue Contact: Jeff Hill Topic: Utility plans Number: 16 Created: 9/7/2005 [ 10/ 11 /05) Add note to define the connection as shown on the redlined plans. [9/7/05) Clearly define all connections to the existing water main. Department: Zoning Issue Contact: Jenny Nuckols Topic: Zoning Number: 2 Created: 8/22/2005 19/30/051 [8/22/051 There is no building wall articulation along the south and north elevations - see section 3.5.3(D)(2) Number: 3 Created: 8/22/2005 [9/30/051 18/22/051 Add a note to the landscape notes regarding installation of landscaping prior to issuance of a CO. Number: 4 Created: 8/22/2005 19/30/051 [8/22/051 On landscape plan, there are no foundation plantings being shown nor are there any street trees being shown along Hickory. Please review article 3 of the Land Use Code for landscaping requirements. 9-30-05 Landscaping is insufficient. Does not meet tree stocking requirements, does not meet foundation planting requirements, nor perimeter requirements. Page 4 Number: 53 Created: 10/ 12/2005 [ 10/ 12/051 Please see redlines for additional minor revisions. Topic: Technical Services Number: 54 Created: 10/ 12/2005 [ 10/ 12/051 Technical Services would like to know how the ROW is dedicated along Hickory. Number: 55 Created: 10/ 12/2005 [ 10/ 12/051 Technical Services comment: The South ROW is not parallel with the E/W section line. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Floodplain Number: 32 Created: 10/ 11 /2005 [ 10/ 11 /05] 1. Critical facilities are not allowed in the floodplain. This includes storage or use of hazardous, flammable, toxic, or water reactive materials. See the definition in Chapter 10 of City Code. Please describe in the drainage report that there will not be any materials meeting the critical facilities definition stored or used in this building. If there are any questions about material storage, please submit a copy of the Hazardous materials impact analysis and material safety data sheets for those items. - REPEAT COMMENT 2. The Site Plan and Landscape Plan show an additional line for a City Floodway that does not exist. These lines have been removed from the grading and utility plans. Please remove these lines from the site plan and landscape plan. 3. Please revise the base flood elevation and floor elevation on the site plan. - REPEAT COMMENT Topic: Stonnwater Number: 24 Created: 9/9/2005 [ 10/ 11 /05] Project can go to a hearing. [9/9/05] Project can go to a hearing after building is elevated to the correct elevation. No more 50% comments. More comments will be presented at final compliance submittal. Department: Transportation Planning Issue Contact: Hurt Ravenschlag Topic: Utility plans Number: 35 Created: 10/ 11 /2005 [ 10/ 11 /05] No Comments Page 3 Number: 43 Created: 10/ 12/2005 [ 10/ 12/051 What is happening with the sidewalk along Hickory Street? Please show clearly which sections are to be removed and replaced and which sections you plan to widen. Any widening must be at least 4' in width. Number: 44 Created: 10/ 12/2005 [10/12/051 Include power and gas in your legend. Number: 45 Created: 10/ 12/2005 [10/12/051 Please indicate on the overall utility plan that a PVC sleeve will be installed N/S for future power line undergrounding. Please note which power lines are to be undergrounded by Fort Collins Light & Power. Number: 46 Created: 10/ 12/2005 [10/12/051 Show, label, dimension all easements on plat, overall utility plan. Please use a concrete hatch pattern for all sidewalk and standard driveway approaches to back of ROW. Number: 47 Created: 10/ 12/2005 [10/12/051 Label all existing and proposed utilities. It does not appear that you've labeled existing gas. Number: 48 Created: 10/ 12/2005 [10/12/051 Inconsistent line types are used on proffie sheets for contours. Please revise. Number: 49 Created: 10/ 12/2005 [10/12/051 Show the locations of the transformers on the utility plan set. Number: 50 Created: 10/ 12/2005 [10/12/051 Please provide the following standard details: a. 1601 Standard Sidewalk b. 1602 Sidewalk Detail- modified to show tree grates c. 1603 Access Ramp Details d. 1607 Access Ramp Scoring e. 2501 (If needed) Sidewalk Widening Detail Number: 51 Created: 10/ 12/2005 [10/12/051 Reference current/updated soils investigation report on cover sheet. Number: 52 Created: 10/ 12/2005 [ 10/ 12/051 Show curb return details including spot elevations to verify that minimum grades are met (FC). Page 2 STAFF. PROJECT REVIEW City of Fort Collins JCL Architecture Date: 10/21 /2005 c/o Justin Larson 201 South College Avenue Studio 205 Fort Collins, CO. 80521 Staff has reviewed your submittal for VALLEY STEEL ADDITION, PDP - TYPE 1, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Dan DeLaughter Topic: General Number: 36 Created: 10/ 12/2005 [10/12/051 See redlines for remaining scanability issues -minor. Number: 37 Created: ' 10/ 12/2005 [10/12/051 Repeat: Grading still doesn't tie into existing contours. Number: 38 Created: 10/ 12/2005 [ 10/ 12/051 Add standard street cut note: "Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards." Number: 39 Created: 10/ 12/2005 [10/12/051 Label and dimension the ROW along Hickory Street for the portion to the East of your property. We need to be sure that the ROW has actually been dedicated before the sewer can be built. Number: 40 Created: 10/ 12/2005 [10/12/051 Entry gates to the property must be far enough back from the road to allow a standard vehicle to stop behind them and not encroach onto the street or sidewalk (207). Number: 41 Created: 10/ 12/2005 [10/12/051 Existing features should be shown in a gray or dashed line type. Number: 42 Created: 10/ 12/2005 [10/12/051 Show parking islands around power poles on the overall utility Plan set to match the site plan. Page 1