Loading...
HomeMy WebLinkAboutFIRST COMMUNITY BANK PLAZA - PDP - 49-05 - REPORTS - RECOMMENDATION/REPORTL. Section 3.5.3(B)(2)(b)(c) — Build -To Lines This standard requires that the building be placed back from the J.F.K. Parkway right-of-way (arterial) by a distance measuring between 10 and 25 feet. The building is setback from J.F.K. Parkway by 25 feet thus complying with the standard. M. Section 3.5.3(D)(1-6) — Character and Image There are no building bays that exceed 30 feet without a change in wall plane or a three-dimensional feature to articulate the facade. All sides use consistent materials. The street -facing facade along J.F.K. Parkway features windows. Both entrances are highlighted by a projecting glass atrium and a modest flat roof for weather protection. As mentioned, the exterior materials synthetic stucco and pre -cast concrete panels. The flat roof is punctuated by a projecting, curving architectural feature consisting of rust -colored wall panels. A series of projecting windows breaks up the facade for horizontal relief. N. Section 3.6.4 — Transportation Level of Service Requirements The Transportation Impact Study has been reviewed and evaluated by the Traffic Operations and Transportation Planning Departments. The P.D.P. adequately provides vehicular and bicycle facilities necessary to maintain the adopted transportation Level of Service standards contained in Part II of the City of Fort Collins Multi -modal Transportation Level of Service Manual for the following modes of travel: motor vehicle, bicycle and pedestrian. Currently, and in the short range future, the key intersections will operate acceptably. 4. Findings of Fact/Conclusion: In evaluating First Community Bank Plaza P.D.P., Staff makes the following findings of fact: A. The land uses, general office building and financial services are allowed within the C, Commercial zone district. B. The P.D.P. complies with the applicable standards of the C, Commercial zone district of Article Four. C. The P.D.P. complies with the applicable standards of the General Development Standards of Article Three. RECOMMENDATION: Staff recommends approval of First Community Bank Plaza P.D.P., #49-05. 144 spaces. Parking provided totals 133 spaces thus complying with the standard. H. Section 3.2.4 — Site Lighting Parking lot and building -mounted lighting will feature down -directional and sharp cut-off fixtures. There are no foot-candles that exceed the maximum allowable. Section 3.5. 1 (B)(C)(E)(F) — Building Project and Compatibility This standard is designed to ensure compatibility of new buildings with the surrounding context. In this case, the context is the Continental Plaza to the north, Toys R Us to the south and Palmer Design Center to the west. These existing buildings, while individually attractive, do not represent any one particular form or style. The exterior materials are predominantly synthetic stucco and pre -cast concrete panels. The top floor is stepped back to mitigate the mass and scale of the overall height. There is generous use of glass, particularly by incorporating atriums at both north and south entrances. There are two significant architectural features that project above the flat roofline which create a very distinctive top. J. Section 3.5.3(B)(1) — Relationship of Buildings to Streets, Walkways and Parking This standard requires that entrances face and open directly onto a connecting walkway with pedestrian frontage. Both main entrances are located along pedestrian frontages which tie directly into the existing public sidewalk. K. Section 3.5.3(B)(2)(a) — Orientation to Build -to Lines for Streetfront Buildings This standard requires that commercial buildings be brought up to the street so that there is an urban relationship between building and street. In addition, no less than 30% of total length of the building along the streets is extended to the build -to lines. The orientation of the building is brought up to J.F.K. Parkway such that 100% of the east elevation faces a public street. B. Section 3.2. 1 (E)(4)(a) — Parking Lot Perimeter Landscaping The north parking lot is setback from J.F.K. Parkway by the stormwater detention pond which is 50 feet wide. The south parking lot is screened from J.F.K. Parkway by a 20-foot wide landscape strip located behind the public sidewalk. C. Section 3.2.1(E)(5) — Parking Lot Interior Landscaping The parking lot exceeds 10% interior landscaping in the form of islands which exceed the required minimum for lots with more than 100 spaces. D. Section 3.2.2(B) — Access, Circulation and Parking There will be one new parking lot access off J.F.K. Parkway located at the southern end of the site. Access to the northern lot will be gained via the existing parking lot circulation system serving Continental Plaza. Circulation between these two lots is provided along the west side of the site next to the irrigation ditch. E. Section 3.2.2(E) — Parking Lot Layout There will be an 8.5-foot wide sidewalk along the head -in parking on the north side of the building and a 15-foot wide plaza along the south side of the building. These two walkways connect the two entrances and also to the public sidewalk along J.F.K. Parkway, without crossing a drive aisle. F. Section 3.2.2(H) — Drive-in Facilities The first -floor bank will offer drive -through banking services within the southern parking lot. There will be five lanes for teller services and one lane for the automatic teller machine. The stacking and circulation system avoids crossing the walkway connection out to J.F.K. Parkway. There is one conflict, however, where cars exiting the drive -through banking lanes will cross an internal parking lot sidewalk. At the point of this conflict, there will be an enhanced crosswalk. Stacking appears adequate so as to not interfere with normal parking lot maneuvers. A walk-up service option is provided so that bicyclists and pedestrians do not have to navigate the drive -through lanes. G. Section 3.2.2(K)(2)(4) — Parking Lots — Maximum Number of Spaces The general standard requires that for the 10,000 square foot bank, there can be no more than 3.5 spaces per 1,000 square feet, or 35 spaces. For the 36,500 square foot general office, there can be no more than 3.0 spaces per 1,000 square feet, or 109 spaces. Total allowable parking is COMMENTS Background: The surrounding zoning and land uses are as follows: N: C; Existing Office Building (Continental Plaza) S: C; Existing Retail Store (Toys R Us) E: E; Vacant W: C; Existing Retail and Personal Service Shops (Palmer Design Center) There has been no previous planning or development activity associated with the parcel. 2. Compliance with Commercial Zone District Standards: A. Land Use A multi -tenant office building and financial services are permitted in the Commercial zone district, subject to review by the Hearing Officer. B. Site Design There are two main entrances to the building. Each features a small plaza that is directly connected to the public sidewalk along J.F.K. Parkway. At the north entrance, the retaining wall for the stormwater detention pond includes a low seat wall. In addition, one sidewalk connects to Continental Plaza and one connects to a bridge over the Larimer Number Two Canal. C. Maximum Height — Four Stories The building is four stories in height thus not exceeding the maximum. 3. Compliance with Applicable General Development Standards: A. Section 3.2.1(C)(D) — Landscaping and Tree Protection The P.D.P. provides full tree stocking around the entire site. Street trees are provided along J.F.K. Parkway. Foundation shrubs are provided around the building. ITEM NO. MEETING DATE STAFF TED .SN�'P/g�t� City of Fort Collins HEARING OFFICER STAFF REPORT PROJECT: First Community Bank Plaza P.D.P., #49-05 APPLICANT: Mr. Spiro Palmer c/o V-F Ripley Associates, Inc. 401 West Mountain Avenue Fort Collins, CO 80521 OWNER: Palmer Properties 3636 South College Avenue Fort Collins, CO 80525 PROJECT DESCRIPTION: The project consists of one four-story office building, including a bank on the first floor, with drive -through facilities. The building would contain a total of 46,500 square feet. The site is presently vacant and located on the west side of J.F.K. Parkway, approximately 500 feet south of Horsetooth Road. The Larimer Number Two irrigation ditch forms the western and southern boundaries of the site. Toys-R-Us is located directly south of the site. The site is 3.39 acres in size and zoned C, Commercial. RECOMMENDATION: Approval EXECUTIVE SUMMARY: An office building and bank, with drive -through facilities, are allowed in the C, Commercial zone district. The P.D.P. complies with the applicable standards of the Commercial zone (Article Four) as well as the General Development Standards (Article Three). COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO.80522-0580 (970) 221-6750 PLANNING DEPARTMENT