Loading...
HomeMy WebLinkAbout600 BLEVINS COURT BOARDING HOUSE - PDP - 47-05 - CORRESPONDENCE - (7).EVISION ROUTING St ET Item: Date Received: Planner: e//- L`)'� Engineer: Items Requested Redlined Items Being Retume C 0 C.. M — rn C y a ti �D O. i0 - C File: Project Planner Advance Planning Building Inspection Comcast Engineering Engineering Pavement Forestry GIS Light & Power Natural Resources Neighborhood Services Y Park Planning 00 Poudre Fire Authority Post Office — west ROW Planning Stormwater Street Oversizin Technical Services Traffic Operations Transfort Transportation Planning Water & Wastewater / Water District: Water Conservation Xcel Energy Zoning CDOT is Ditch Co.: Railroad: 7 REA/DOE/PRPA Schools: Poudre / Thompson TOTAL To be Submitted 2, This completes staff (and outside reviewing agencies) review and comments at this time. Another round of staff review may be necessary before this development request can be scheduled for a public hearing. This proposal is subject to the 90-day revision re -submittal requirement (from the date of this comment letter, being June 26, 2006) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure and return all red -lined plans when you re -submit. The number of copies of each document to re- submit is shown on the attached Revisions Routing Sheet. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truly, *A;ehV-- Steve Olt City Planner Page 2 STAFF PROJECT REVIEW James Swanstrom P.O. Box 271516 Fort Collins, CO. 80527 Date: 6/26/2006 Staff has reviewed your submittal for 600 BLEVINS COURT, BOARDING HOUSE - PDP, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: Electric service Number: 15 Created: 12 / 8 / 2005 [6/22/06] This comment is being repeated just to confirm that this boarding house will be assessed the residential electric rate. [12/8/05] After addition research and discussion, it has been concluded that boarding houses can be on the residential electric rate. Rate ordinances from several years ago stipulated that boarding houses would be on the commercial rate; however, current rates are silent on boarding houses. Since the expected electric use pattern is like that of a residence, it has been concluded that the appropriate rate is residential. Anyway, there is very little difference between the two rates. Topic: General Number: 20 Created: 6/22/2006 [6/22/06] The 28'-0" dimension for the existing concrete paving (parking pad) as shown on the revised Site Plan appears to be incorrect, based on the plan scale of 1" = 10'. The width would scale to be about 23'-6" to 24'-0". A total of 3 off-street parking spaces are required for the 5-bedroom boarding house. Unless only compact cars are going to be parked here the width is not sufficient for 3 cars. At least 27' of width would be needed. Department: Engineering Issue Contact: Dan DeLaughter Topic: General Number: 2 Created: 11 / 23 / 2005 [6/23/06] The dimension should be for sidewalk, not concrete, and the sidewalk width is 32". Please dimension and label. [11/23/05] Dimension the sidewalk. Number: 21 Created: 6 / 23 / 2006 [6/23/06] At the time of Final Compliance, a $1000 Transportation Development Review fee will be owed to the Engineering Department. Page 1