Loading...
HomeMy WebLinkAbout410 LINDEN - PDP - 45-05 - CORRESPONDENCE - (3)[1217/05] No comments. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely, nne H. Asper{ P City Planner Page 3 Number. 8 Created: 11 /28/2005 [11/28/05] Please use a greyscale for all existing improvements and black for proposed improvements. It is not really clear what this development is actually proposing to do. This needs to be a Site Plan (not an improvement survey plat) and the layout needs to be defined better. Please see Anne Aspen for examples of what a site plan should look like. Number: 9 Created: 11/28/2005 [11/28/05] Is this development only involving lot 3? If so, please fade back lots 1 and 2. Number: 10 Created: 11 /28/2005 [11/28/05] Please show all existing improvements within 150' of the project boundaries. Department: Light & Power Issue Contact: Doug Martine Topic: Electric Number: 2 Created: 11 /16/2005 [11/16/05] The existing electric system to the site is designed for a maximum of a 125 amp 120/240 volt single phase service. If any change is required there will be electric development charges that will apply. Contact Light & Power Engineering at (970)221-6700 if any service changes are needed. Also, the owner will need to contact Ft. Collins Utility Billing at (970)212-2900 to change the electric rate from residential to commercial. Department: Natural Resources Issue Contact: Doug Moore Topic: General Number: 1 Created: 11/16/2005 [11/16/05] No issues. Department: Police Issue Contact: Joseph Gerdom Topic: General Number: 11 Created: ,11 /29/2005 [11/29/05] Landscaping, if any, parking, and lighting needed. Department: Traffic Operations Issue Contact: Eric Bracke Topic: TRAFFIC I ' Number: 3 Created: 11 /18/2005 [11/18/05] The Transportation Memorandum submitted with the project is acceptable. The traffic produced by this project is minimal and will have little or no effect on the adjacent public street system. Department: Transportation Planning Issue Contact: David Averill Topic: General Number: 12 Created: 12/6/2005 [12/6/05] Please show the proposed bike rack location on the site plan. Thanks. Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater Number: 13 Created: 12/6/2005 [12/6/05] No comments. Department: Stormwater-Water-Wastewater Topic: WaterMastewater Number: 16 Issue Contact: Roger Buffington Created: 12/7/2005 Page 2 STAFF PROJECT REVIEW Cityof Fort Collins JESSE AND DOROTHY GODINEZ Date: 12/12/2005 3000 CONESTOGA COURT FORT COLLINS, CO 80526 Staff has reviewed your submittal for 410 LINDEN PDP, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Anne Aspen Topic: General Number: 14 Created: 12/6/2005 [12/6/05] An improvement survey plat is not an appropriate document for the PDP. The combined site and landscape plan must show the site plus 150' around it at a large enough scale to review it, the building footprint, the existing and proposed landscaping, the proposed patio including dimensions and materials proposed. You need to show parking, bike racks, site lighting, sidewalks (where applicable —where not, make a note indicating that the sidewalk will be designed and constructed based on the outcome of the downtown river improvement district.) The site and landscape plan needs to have the title of the project and address at the top (Poudre Ice Creamery, or whatever, 410 Linden, Fort Collins, CO), it should have the legal description, signature blocks for both the owner (and notary) and the Director of Current Planning. There should be a notation about the change of use from single family residence to•ice cream shop. There should be a vicinity map. Any improvements need to be shown accurately on the plan including but not limited to the patio, site lighting, bike racks, walkways etc. You may need to hire a planning or architecture consultant to depict these things accurately, or you may be able to get it done between your surveyer and a draftsperson. Please refer to the examples I gave you after staff review. Topic: WaterJWastewater Number: 17 'Created: 12/12/2005 [12/12/05] The Post Office and Forestry have indicated that they have no issues or concerns with the proposed project. Department: Engineering Issue Contact: Dan Delaughter Topic: Engineering Pavement Number: 15 Created: 12/6/2005 [12/6/05] From Rick Richter: Linden was overlaid in 2005. Department: Engineering Issue Contact: Susan Joy Topic: General Number: 5 Created: 11/28/2005 [11/28/05] Please show, label and dimension the row from edge to edge (see redlines). Number: 6 Created: 11 /28/2005 [11/28/051 Please show, label and dimension all easements. Number: 7 Created: 11 /28/2005 [11/28/05] Please show all utilities, driveways, parking, etc. Page 1