Loading...
HomeMy WebLinkAboutINNOVATION ISLAND - ODP - 40-05 - CORRESPONDENCE - (4)REVISION ROUTING SHEET ob P -lid Date Received: Planner: Engineer: 2- C� En �2 a CttvofFort Collins S g ��. l ,sS�v REKT PLANMG lo/2t&j File- Project Planner Advance Planning Building Inspection Engineering Engineering Pavement Light & Power Natural Resources be ROW Planning ■■■■■■■■■■■■■■■■ Street • ■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■ Technical Services ■■■■■■■■■■■■■■■■ WMIMM KMIMMM Water & Wastewater Water Di strict: Water Conservation ■■■■■■■■■■■■■■■■ wo loll[ Schools: Poudre ■■■■■■■■■■■■■■■■ TOTAL To be Submitted Department: Police Issue Contact: Joseph Gerdom Topic: General Number: 10 Created: 10/ 19/2005 [ 10/ 19/051 Lighting standards for playground call for min of 5.Ofc. Parking lot area minimum fc is 1.0. Need detailed planting schedule keyed to site plan. (Current Planning) This comment really relates to the Innovation Island, Mrst Mling - PDP. Department: Stormwater Utility Issue Contact: Basil Hamdan Topic: General Number: 5 Created: 10/ 17/2005 [ 10/ 17/051 No comments on ODP. Department: Transportation Planning Issue Contact: Hurt Ravenschlag Topic: General Number: 6 Created: 10/ 18/2005 [ 10/ 18/051 No Comments Department: Zoning Issue Contact: Peter Barnes Topic: Zoning Number: 3 Created: 10/ 11 /2005 [ 10/ 11 /051 No comments Be sure and return all red -lined plans if/when you re -submit prior to the scheduled November 17, 2005 Planning & Zoning Board public hearing. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truly, Ak&- Steve Olt City Planner cc: Dan DeLaughter Habitat for Humanity Project File #40-05 Page 3 r Department: Natural Resources Issue Contact: Doug Moore Topic: General Number: 2 Created: 10/7/2005 [10/7/05) No issues. Department: PFA Issue Contact: Michael Chavez Topic: General Number: 7 Created: 10/ 19/2005 [10/19/051 PREMISES IDENTIFICATION: Approved numerals or addresses shall be provided for all new and existing building in such a position as to be plainly visible and legible from the street or road fronting the property. 1997 UFC 901.4.4 A. In Multi -story buildings the following requirements shall pertain. 1. The first floor units shall be designated with 100's. 2. The second floor units with 200's 3. The third floor units with 300's, and so forth. B. All brass letters and numerals shall be posted on a black background. C. Some multi -family layouts may require address postings from the back side as well as the front of the buildings. D. A clockwise addressing pattern shall be maintained when ever possible. E. An addressing scheme shall be submitted to the fire department for approval prior to being posted on the building. Number: 8 Created: 10/ 19/2005 [ 10/ 19/051 WATER SUPPLY: Commercial No commercial building can be greater then 300 feet from a fire hydrant. Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable of delivering 1500 gallons of water per minute at a residual pressure of 20 psi. 1997 UFC 901.2.2.2 Number: 9 Created: 10/ 19/2005 [10/19/051 These two conditions, if not met, would require the installation of a fire sprinkler system. 1) Water Supply - If a hydrant, when required can not be provided for whatever reason, a fire sprinkler system shall be provided. 2) Fire Apparatus Access - When any portion of the facility or any portion of an exterior wall of the first story of the building is located more then 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility it shall be fire sprinklered. Page 2 gal STAFF PROJECT REVIEW City of Fort Collins 0 Fort Collins Habitat For Humanity, Inc. Date: 10/21 /2005 c/o Vignette Studios - Don Tiller 144 North Mason Street, Suite 2 Fort Collins, CO 80524 Staff has reviewed your submittal for INNOVATION ISLAND, ODP - TYPE 2, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: General Number: 11 Created: 10/21 /2005 [10/21/051 Parcel B must reflect the density if it develops as multi -family residential instead of commercial. 10 units/ 1.3 acres = 7.7 DU/AC. Number: 12 Created: 10/21 /2005 [ 10/21 /05) Under the LAND USE BREAKDOWN, Parcel B must show both Multi -Family Residential and Commercial as the proposed land uses. Also, add another column showing Density for Parcels A & B (see red -lined ODP). Number: 13 Created: 10/21 /2005 [ 10/21 /05) Please see the red -lined ODP for Current Planning's comments. Number: 14 Created: 10/21 /2005 [ 10/21 /051 -This item has been scheduled for the November 17, 2005 Planning & Zoning Board public hearing. Because of known concerns and opposition from the surrounding neighborhood, this item will be on the Board's discussion portion of the agenda. Department: Engineering DeLaughter Topic: General Number: 4 [ 10/ 13/05) No Comments Issue Contact: Dan Created: 10/ 13/2005 Department: Light & Power Issue Contact: Doug Martine Topic: General Number: 1 Created: 10/7/2005 [10/7/05) No Comments from Light & Power Page 1