Loading...
HomeMy WebLinkAbout300 BLEVINS COURT BOARDING HOUSE - PDP - 46-05 - CORRESPONDENCE - (5)..EVISION ROUTING SFL.ET Item: M, Date Received: Y .g115\� Items Requested Redlined Items Being Returne bA o n a O - ( A. ] o ro Q cC �D h9 cC F sLam' ty c a O - cz v ti m °. File: Project Planner Advance Planning Building Inspection Comcast Engineering Engineering Pavement Forestry GIS Light & Power Natural Resources Neighborhood Services Park Planning Poudre Fire Authority Post Office Qwest < ROW Planning_ Stormwater Street Oversizin Technical Services Traffic Operations Transfort Transportation Planning Water & Wastewater / Water District: Water Conservation Xcel Energy Zoning CDOT a Ditch Co.: L Railroad: z REA/DOE/PRPA Schools: Poudre / Thompson TOTAL To be Submitted 277 Topic: General Number: 1 Created: 11 /23/2005 [6/9/06] After a site visit, it is clear that while the on street space requirement cannot be met on your frontage, the cul-de-sac as a whole provides enough public parking to meet the requirement in our standards. [11/23/05] Off -site parking is required per LCUASS. Requires 19' min plus 5' clearance from any driveway edge. If cul-de-sac frontage does not have space required for on -street parking, a variance request by a professional engineer will be required. This requirement is not applicable if you resubmit under basic development review. Number: 3 Created: 11 /23/ 2005 [6/9/06] Show, label and dimension. Repeat. [ 11 / 23 / 05] Sidewalk along frontage must be dimensioned. Number: 19 Created: 6/ 9 / 2006 [6/9/06] See redlines for additional minor changes Number: 21 Created: 6/ 23 / 2006 [6/23/06] At the time of Final Compliance, a $1000 Transportation Development Review fee will be owed to the Engineering Department. This completes staff (and outside reviewing agencies) review and comments at this time. Another round of staff review may be necessary before this development request can be scheduled for a public hearing. This proposal is subject to the 90-day revision re -submittal requirement (from the date of this comment letter, being June 26, 2006) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure and return all red -lined plans when you re -submit. The number of copies of each document to re- submit is shown on the attached Revisions Routing Sheet. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truly, S4X� Steve Olt City Planner Page 2 STAFF PROJECT REVIEW James Swanstrom P.O. Box 271516 Fort Collins, CO. 80527 Date: 6/ 26/ 2006 Staff has reviewed your submittal for 300 BLEVINS COURT, BOARDING HOUSE - PDP, and we offer the following revised comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: Electric Service Number: 15 Created: 12 / 8 / 2005 [6/22/06] Carried over just to confirm that this boarding house will be assessed the residential electric rate. [12/8/05] After additional research and discussion, it has been concluded that boarding houses can be on the residential electric rate. Rate ordinances from several years ago stipulated that boarding houses would be on the commercial rate; however, current rates are silent on boarding houses. Since the expected electric use pattern is like that of a residence, it has been concluded that the appropriate rate is residential. Anyway, there is very little difference between the two rates. Topic: Site Plan Number: 9 Created: 12 / 6/ 2005 [6/22/06] The revised Site Plan, as submitted, still does not show the aforementioned concrete pad/parking space in the front yard. This comment is still relevant. This 4-bedroom boarding is required to have a minimum of 2 off-street, unobstructed parking spaces. Is this being met? [ 12 / 6/ 05] Based on a site visit to Blevins Court, the Site Plan does not correctly show the off-street parking spaces in the front yard of this property. There is one additional concrete paved parking space to the northeast of the parking as shown on the plan. It is over the sidewalk as shown. Because of this additional space the allowable 40% parking in a front yard may be exceeded. This must be verified. Department: Engineering Issue Contact: Dan DeLaughter Topic: fire Number: 18 Created: 6 / 9 / 2006 [6/9/06] Dimension the existing access easement. Page 1