HomeMy WebLinkAboutTHE INN AT CITY PARK, 1734 WEST MOUNTAIN AVENUE - FDP - 43-05/A - CORRESPONDENCE - (3)provide funds for the sidewalk frontage along Mountain Avenue and Frey Street. An estimate of the dollar
amount for sidewalk (4.5' in width on Frey, 5' on Mountain) will need to be prepared by the applicant and
approved by the City, or alternatively the City can prepare such an estimate.
Department: Stormwater-Water-Wastewater
Topic: General
Number: 16
[3/16/06)
[11/10/05] No Comments.
UNDERSTOOD
Department: Stonnwater-Water-Wastewater
Topic: General
Number. 7
[3/14/06]
[11/8/05] No comments.
UNDERSTOOD
Department: PFA
Topic: fire
Number.20 Created:12/21/2005
(3/21/06]
Issue Contact: Basil Harridan
Created: 11/10/2005
Issue Contact: Roger Buffington
Created: 11/8/2005
Issue Contact: Ron Gonzales
[12/21/05] Single station smoke detectors are required in each bedroom, and one on every level.
WILL BE ADDRESSED IN THE BUILDING PERMIT PROCESS
Number 21 Created:12/21/2005
[3/21106]
[12/21/05] Because this is a conversion to a Bed and Breakfast, the address shall be visible from the street on
which you front with minimum 6" numerals posted on a contrasting background
WILL BE ADDRESSED IN THE BUILDING PERMIT PROCESS
Once you have addressed any comments above that pertain to the drawings, you may prepare and submit one
set of signed mylars.
PLEASE FIND MYLARS ENCLOSED
Page 2
RESPONSE TO FINAL PLAN SUBMITTAL COMMENTS
ANNE ASPEN DATE: 03/22/2006
CURRENT PLANNING
CITY OF FORT COLLINS
281 NORTH COLLEGE AVENUE
FORT COLLINS, CO 80524
RESPONSE TO STAFF PROJECT REVIEW DATED 03/I 7/2006
Staff has reviewed your submittal for THE INN AT CITY PARK, 1734 WEST MOUNTAIN AVENUE BED &
BREAKFAST PDP AND FINAL PLANS - TYPE I, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Anne Aspen
Topic: General
Number. 22 Created: 3/14/2006
[3/14/06] The following departments and agencies have no further concerns with this proposal: Xcel, Comcast,
and Water Conservation.
UNDERSTOOD
Number: 23 Created: 3/14/2006
[3/14/06] Rick Lee with Building Inspection has no further comments at this stage in the development review but
includes information on codes and standards that will come into play during the building permit process.
UNDERSTOOD AND WILL ADDRESS IN BUILDING PERMIT PROCESS
Number. 24 Created: 3/14/2006
[3/14/06) Why is the striped loading area of the handicap parking stall not as long as the space it serves?
THE STRIPED LOADING AREA IS AS DEEP AS THE HANDICAP PARKING
STALL IT SERVES, SHOWN ON DRAWING.
Department: Engineering Issue Contact: Marc Virata
Topic: General
Number 8 • Created:ll/9/2005
[3/15/06] As the applicant has elected to proceed with option 3, details will be finalized with the development
agreement.
UNDERSTOOD AND WILL PROCEED WHEN WE HAVE RECEIVED THE
DEVELOPMENT AGREEMENT FROM THE CITY
[11/10/05] The outcome on the question of the lack of existing public improvements is as follows:
The estimate for the cost required of the project to upgrade Frey Street and Mountain Avenue is $64,733.20.
This dollar amount was based upon an estimate in September 1999 and does not account for inflation. The
applicant has several options with regards to fulfillment of the street improvement requirement:
1) Provide the funds referenced above to the City (adjusted for inflation at the time of payment), or
2) Work out a payment plan for the fund noted with terms acceptable to both the applicant and the City, or
3) Agree to improve Frey Street and Mountain Avenue frontages at such time when the City determines the
improvements are needed. In addition, the applicant would agree to not opposing the formation of a special
improvement district for either Frey Street or Mountain Avenue. Should the applicant choose this option, the
deferral of costs is sufficient for only the roadway portion, not the sidewalk. The applicant will still be required to
Page 1