Loading...
HomeMy WebLinkAbout605 WEST LAKE STREET BOARDING HOUSE - PDP - 48-05 - CORRESPONDENCE - (10)EVISION ROUTING SI ET .i�'ol FUtt �0!inte Date Received: Planner: // , (�-L�' Engineer: , Items Requested Redlined Items Being Returne v, G O C 00 M i. bD ce O File: Project Planner Advance Planning Building Inspection Comcast Engineering Engineering Pavement Forestry GIS Light & Power Natural Resources Neighborhood Services V Park Planning Poudre Fire Authority o Post Office = Qwest ROW Planning Stormwater Street Oversizin Technical Services Traffic Operations Transfort Transportation Plamiin Water & Wastewater / Water District: Water Conservation Xcel Energy Zoning CDOT b Ditch Co.: Railroad: z REA/DOE/PRPA Schools: Poudre / Thompson TOTAL To be Submitted Number: 2 Created: 11 / 23 / 2005 [6/8/06] This doesn't appear to be what is shown on our electronic parcel map. You are labeling 65', while it appears to be more like 63'. What is shown on the existing plat? [11/23/05] Dimension the existing ROW. Number: 9 Created: 12/ 1/2005 [6/9/06] The shed is within the easement. [12/ 1/05] Show the existing 5' easement (per Blevins Subdivision plat) on south of the site. It appears your shed is located within this easement. The shed would have to be moved or utilities must give approval for it to remain. Number: 22 Created: 6 / 8 / 2006 [6/8/06] The scale of the site plan is not quite 1"=10' as indicated. Please adjust. Number: 23 Created: 6/ 9 / 2006 [6/9/06] See redlines for additional minor revisions. Number: 24 Created: 6/ 23 / 2006 [6/23/06] At the time of Final Compliance, a $1000 Transportation Development Review fee will be owed to engineering. This completes staff (and outside reviewing agencies) review and comments at this time. Another round of staff review may be necessary before this development request can be scheduled for a public hearing. This proposal is subject to the 90-day revision re -submittal requirement (from the date of this comment letter, being June 26, 2006) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure and return all red -lined plans when you re -submit. The red -lined plan from the last round of review was not provided with this re -submittal. The number of copies of each document to re -submit is shown on the attached Revisions Routing Sheet. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truluk/ , S eve Olt City Planner Page 2 STAFF PROJECT REVIEW James Swanstrom P.O. Box 271516 Fort Collins, CO. 80527 Date: 6/ 26/2006 Staff has reviewed your submittal for 605 WEST LAKE STREET, BOARDING HOUSE - PDP, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: Electric service Number: 18 Created: 12/8/2005 [6/26/06] Repeated just for confirmation that this can be assessed the residential electric rate. [12/8/05] After additional research and discussion, it has been concluded that boarding houses can be on the residential electric rate. Rate ordinances from several years ago stipulated that boarding houses would be on the commercial rate; however, current rates are silent on boarding houses. Since the expected electric use pattern is like that of a residence, it has been concluded that the appropriate rate is residential. Anyway, there is very little difference between the two rates. Topic: General Number: 14 Created: 12 / 6 / 2005 [6/26/06] Repeat comment. How is this requirement being met? [12/6/05] This facility, proposed for 6 bedrooms, must provide for one van accessible handicap parking space with wheelchair access into the building. Based on the information provided, it is difficult to determine if this development proposal satisfies the requirement. Number: 26 Created: 6/26/2006 [6/26/06] Based on the plan scale of 1" = 10', the width of the proposed 3- car off-street parking area scales to be 23.5' wide. This is not wide enough for the required 3 parking spaces off-street. Department: Engineering Issue Contact: Dan DeLaughter Topic: General Number: 1 Created: 11 / 23 / 2005 [6/8/06] The sidewalk is only 32" here. With curb and gutter, it may be 4.5', but please label as 32" sidewalk, not 4.5 'concrete. [11/23/051 Sidewalk along frontage must be dimensioned. Page 1