Loading...
HomeMy WebLinkAboutTIMBERLINE CENTER - FDP - 41-05B - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEET04- (— Or;� FINAL PLAN ROUTING SHEET Item: EX L / nJ E G FN iZX -- T7� This project went to / has been scheduled for Public Hearing on cur or wn cam• The following table lists final plan submittal requirements for this project. A final fee of $1,000.00 is required at the time of submittal unless otherwise waived or reduced. Fee Waiver/Reduction Approval: Amount: &/000 Date: 02 —1 L'G 6 Planner: TFD S • Engineer: f Q S A n) 17V V Items ..q • • File: Project Planner Advance Planning Building Inspection air- =====�MMMMMM • ��_ M ====_MMMMMM ' �K4 _MMMMMM Light & Power Natural Resources Poudre Fire Authority Post Office Street Oversizing Technical Services J ! Traffic Operations Transportatining Water Water :Wastewater • MIN MEMMEMEME Water Conservation MMMMM�MMMMM MMMMM_MMMMMM County Assessor TOTAIL To be Submitted