Loading...
HomeMy WebLinkAboutTIMBERLINE CENTER - PDP - 41-05A - REPORTS - MODIFICATION REQUEST (6)The result is that the setback distance along Bear Mountain Drive is 13 feet beyond the required 15 feet. Therefore, the north side of Building B and the south side of Building C do not meet the required 15-foot setback for 30% of the building's length. The request is for a modification to allow a greater setback along Bear Mountain Drive for Buildings B and C. The setback varies from 27 feet to 28.5 feet, but is not 15 feet for 30% of it's length. Justification A justification for this request per the Modification Criteria (Section 2.8.2(H) (1) is that the proposed plan will serve the standard equally well or better than would a plan which complies with the standard. We believe the proposed project meets this criterion in the following ways: 1. Setting the building back an additional 13.5 feet allows for more landscaping and patio area for outdoor dining on the south side of Building C creating a more attractive streetscape. 2. Setting Building B back an additional 13.5 feet would allow for an attractive symmetrical streetscape appearance. 3. A connecting walkway is provided in the most convenient location to allow pedestrians to enter the building without crossing driveways or parking lots. V Y F:1ipl4Ea_y.00tATES INC Landscape Architecture Urban Design Planning Modification Request Timberline Center PDP Build -To Lines November 23, 2005 This request is for a modification to the "build -to" line requirements as outlined in the City of Fort Collins Land Use Code. The modification being requested is from section 3.5.3 (B)(2)(a) and (b), Relationship of Buildings to Streets, Walkways and Parking. This regulation reads as follows: and; (a) To establish "build -to " lines, buildings shall be located and designed to align or approximately align with any previously established building/sidewalk relationships that are consistent with this standard. Accordingly, at least thirty (30) percent of the total length of the building along the street shall be extended to the build -to line area. If a parcel, lot or tract has multiple streets, then the building shall be built to at least two (2) of them according to (b) through (d) below, i.e. to a street corner. (b) Buildings shall be located no more than fifteen (1 S) feet from the right-of- way of adjoining street if the street is smaller than a full arterial or has on -street parking. Project Description The Timberline Center property consists of 18.5 acres and is located south of Prospect Road and north of Drake Road on the west side of Timberline Road. Timberline Center will be a well -planned and architecturally coordinated commercial center consisting of retail, restaurant, office, storage and auto related uses. Modification The west side of Building B is located approximately 11 feet from Joseph Allen Drive right-of-way line, meeting the "build -to" line standard for an adjoining street smaller than a full arterial street. The north side of Building B is located approximately 28 feet from the Bear Mountain Drive right-of-way line not meeting the required 15-foot set back for an adjoining street smaller than a full arterial street. The west side of the Building C is located approximately 12 feet from the from Joseph Allen Drive right-of-way line, meeting the "build -to" line standard for an adjoining street smaller than a full arterial street. The south side of Building C is located approximately 28 feet from the Bear Mountain Drive right-of-way line not meeting the required 15-foot set back for an adjoining street smaller than a full arterial street. Phone 970.224.5828 Fax 970224.1662 401 West Mountain Ave. Suite 201 Fort Collins, CO 80521-2604 vfripley.com