HomeMy WebLinkAboutTIMBERLINE CENTER - PDP - 41-05A - CORRESPONDENCE -Convenience Shopping Center as a one separate use category. Then, under this
category, please describe the proposed uses within this center as components.
12. The table should use the terminology "Retail Stores with Vehicle Servicing" for the tire
shop and "Vehicle Minor Repair Servicing and Maintenance" for the tube shop and
carwash. Also, please note the distinction in the restaurant definitions between "fast
food" and "drive-in." The two restaurants shown on the plans for Buildings E and K and
designated as 'fast food" are actually "drive-in."
13. Buildings A, B, C, F and G contain the designation "restaurant." This should be further
described as "Standard Restaurant."
14. Please re -label Sagebrush Drive as "Joseph Allen Drive."
15. Should the site plan contain multiple ownership signature blocks like the plat?
16. Please add the following note to General Notes on the site plan:
"Electrical transformers and natural gas equipment shall be fully screened from public
view by a solid hedge of plant material or an enclosure meeting the clearance
specifications of Light and Power. Such enclosure must match the predominant
materials of the building(s) being served. Transformers must be within ten feet of hard
surface."
17. Please add the following note to the General Notes on the site plan:
"All outside functions associated with the restaurants, whether standard, fast food or
drive-in, shall be fully screened from public view. Such functions may include, but are
not limited to, delivery operations, loading docks, walk-in coolers and freezers, trash
receptacles and the like. Screening materials must match the predominant materials of
the building.
18. On General Note number nine, please add: "... and will not interfere with pedestrian
walkways."
19. Please replace General Note 11 with the following:
"All internal pedestrian walkways shall be distinguished from driving surfaces through
the use of durable, low -maintenance surface materials such as scored concrete to
enhance pedestrian safety and comfort as well as the attractiveness of the walkways."
20. Comments related to the Lighting Plan will be made under separate cover.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Ted Shepard
Chief Planner
V Page 7
outdoor walk-in coolers and freezers. If the end -users are not known at this time, then
the P.D.P. should provide a "typical' detail that calls out these screening elements.
3. In order to preserve the view from the public streets, Section 3.5.1 — Operational and
Physical Compatibility Standards - will be applied to this project to the maximum extent
feasible. Please note that this may require specific screening devices for such areas
and appurtenances as used tire storage, tire display racks, outdoor vending machines
and the like.
4. There appears to be outdoor patios provided for Buildings E, K, L, M and N. These
areas should be labeled as such. Also, an outdoor waiting area/patio should be
provided for customers of the carwash — Building H. A good example of such an area
is the Old Town Carwash on North College Avenue. In fact, outdoor customer waiting
areas and outdoor dining opportunities abound within this project. Staff recommends
that these outdoor areas feature an amenity package common to all users so that
furniture, lighting, trash receptacles, etc. are of high quality and consistent across the
center.
5. For Buildings E, F, G and H, the parking layout runs parallel to the storefronts versus
perpendicular. This means that customers in the parking lot must walk between
parked cars to gain access to individual stores, or to cross the center to gain access to
another building. To ease pedestrian travel through the parking lots, and to comply
with Section 3.2.2 — Access, Circulation and Parking — centrally located north -south
sidewalks must be provided. These walks can be added next to the landscaped
islands so that the walkways are shaded.
6. Building E features a drive -through lane along a property line that separates the
Industrial zone from the Employment zone. This does not provide a sensitive transition
and the drive -through lane should be mitigated with a solid screen wall or a dense
hedge of landscaping. Please refer to Section 3.5.1(H) — Land Use Transition.
7. For all drive-in uses, please refer to Section 3.2(H) — Drive -In Facilities. Based on this
standard, if the bank features a drive -up A.T.M., then a walk-up A.T.M. must also be
provided.
8. For the bank, Building J, a screen wall or dense hedge of landscaping will be needed
to shield headlights from the drive -through lane that will face east onto Timberline
Road.
9. For Building K, under the drive -through restaurant scenario, the drive -through lane and
pick-up window along the east side of the building will need significant screening from
Timberline Road.
10. The amount of parking will be calculated based on five spaces per 1,000 square feet of
gross leasable area for all but the enclosed mini -storage. Based on this ratio, the
center will be allowed a maximum of 490 spaces. The parking provided, 487, falls
below this maximum. Please adjust the parking analysis table accordingly.
11. Please create a new land use, square footage and parking table so that it more
accurately reflects the permitted use list in the Industrial zone. Please describe the
Page 6
Number: 34 Created: 11 /2/2005
[11/2/05] Please call out all fittings, thrust blocks, type and length of pipe, etc.
Number: 42 Created: 11 /4/2005
[11/4/05] Is the Timberline Star property going to need new water and sewer services when
the property develops? If so, the extension of the water and sewer mains in Sagebrush
Drive to the property line may be warranted.
Department: Water Utilities Issue Contact: Roger Buffington
Topic: Water/WW
Number: 39 Created: 11 /3/2005
[11/3/05] Please schedule a meeting with Water and PFA to discuss fire hydrant locations.
Some of the hydrants in the mini -storage lot do not appear to be useable by PFA, and the
FH's at the entrances to the mini -storage need to be moved out to the Sagebrush R.O.W
Number: 40 Created: 11 /3/2005
[11/3/05] A utility coordination meeting is strongly recommended early in the design
process.
Number: 41 Created: 11 /3/2005
[11/3/05] The 24-inch water main in Timberline is cathodically protected; therefore, the 8-
inch connection must be isolated per the City detail. (Final compliance item)
Department: Zoning Issue Contact: Gary Lopez
Topic: Zoning
Number: 1 Created: 10/24/2005
[10/24/051 Indicate building dimensions on site plan.
Number: 2 Created: 10/24/2005
[10/24/05] Show parking lot pole lights on site plan.
Number: 3 Created: 10/24/2005
[10/24/05] Area is located in the Neighborhood Residential sign district requiring standards
as a Neighborhood Service Center and requiring that proposed locations of building wall
signs be approved on the elevation drawings.
Comments from Current Planning:
1. Staff will not be supporting the Modification to the three-quarter mile separation
between Convenience Retail Stores with Fuel Sales based on the Current Planning
Director's Administrative Interpretation #8-05 dated July 1, 2005. Your Request for
Modification will be forwarded to the Planning and Zoning Board for their consideration.
2. Buildings A, B, C, D, F, G, J, K, L and M comply with the connecting walkway standard
but it is the rear or sides of the buildings that face the street. Since none of these
buildings have an entrance that faces the street, Staff is concerned about the
relationship between the sides and rear and the public streets. Special landscaping
and screening will be required to screen the utility meters, transformers, ground -
mounted HVAC equipment, outdoor condensers and, in the case of restaurants,
Page 5
Department: Transportation Planning Issue Contact: David Averill
Topic: Site Plan
Number: 29 Created: 11 /1 /2005
[11/1/05] Bicycle parking locations are a bit confusing when looking at the different plan
sets. The site plans have a "B" for the location, which often looks like its sitting off in the
grass away from a paved surface. The landscape plans use a more discernable bicycle
rack symbol, and these look like they are to be installed on a hard surface - which the code
requires. Can we coordinate these a bit better for future submittals.
Number: 30 Created: 11/1/2005
[11/1/05] How much bicycle parking is going to be provided with this project? Call out the
specific number in the "Parking Analysis" table on sheet one of the preliminary stie plan.
Thanks.
Number: 31 Created: 11 /1 /2005
[11/1/05] The access ramp in the vicinity of Bldg N confuses me. Is there a handicap space
somewhere nearby, or a is this in anticipation of future development on the Timberline Star
property. Just looking for clarification.
Topic: utility plans
Number: 27 Created: 11 /1 /2005
[11/1/05] Need directional ramps crossing Bear Mountain at Sage Brush. Also, it would be
good to provide a crossing here that directly links the walkway in front of Bldg AA (the mini -
storage office) to the street sidewalk on the east side of Sage Brush.
Number: 28 Created: 11 /1 /2005
[11/1/05] Site and Utility Plans - please call out the dimensions of all sidewalks that are
adjacent to head -in parking. These should be a minimum of 6' unless wheel stop are to be
utilized. If your going to use wheel stops, that should be noted on the plans.
Department: Water Utilities Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 35 Created: 11 /2/2005
[11/2/05] Please call Wes Lamarque at 416-2418 to discuss the off -site flows being routed
through the pond outlet pipes.
Number: 43 Created: 11 /4/2005
[11/4/05] A letter of intent for the off -site grading is required before a hearing. Stormwater is
ready for a hearing after the letter of intent is received.
Number: 44 Created: 11 /4/2005
[11/4/05] Is the 15.4 cfs release from this site the 2-year historic? Please discuss in the text
of the report.
Topic: Water/WW
Number: 32 Created: 11 /2/2005
[11/2/05] All services must be located on the lot that it serves. If a service is to pass onto
another lot, than a utility easement is required.
Number: 33 Created: 11 /2/2005
[11/2/05] Please label all curb stops, meter pits and service sizes on the utility plan.
Page 4
street may become a Commercial Local with the frontage along the Police Station
"constrained". Please update the TIS to include all internal streets and we'll go from there.
Topic: Site Plan
Number: 13 Created: 10/31 /2005
[10/31/05] Please dimension all parking stalls, sidewalks, and parking setbacks.
Number: 18 Created: 10/31 /2005
[10/31/05] Please dimension the parkway width along Timberline.
Topic: Traffic Study
Number: 45 Created: 11 /4/2005
[11/4/05] The TIS does not address the internal streets. Please update it to include
Sagebrush and Bear Mountain.
Department: Light & Power Issue Contact: Monica Moore
Topic: General
Number: 4 Created: 10/26/2005
[10/26/05] Developer needs to coordinate' power requirements and locations for electrical
transformers, lines and equipment with Light and Power Engineering. Since this is a fairly
tight site, it is highly recommended this be coordinated prior to finalizing the site plan.
Number: 5 Created: 10/26/2005
[10/26/05] All street trees must maintain minimum clearances to streetlights. (15-feet from
ornamental and 40-feet from shade trees to streetlights.) Contact Light and Power
Engineering to initiate a streetlight design for this project.
Number: 6 Created: 10/26/2005
[10/26/05] Maintain minimum clearances to all other utilities: 10-feet from water, sewer and
stormwater. 5-feet from gas.
With regards to the placement of transformers, 3-feet of clearance must be maintained
along the sides and rear of transformers from all site walls, trees, shrubs, etc.
Number: 7 Created: 10/26/2005
[10/26/05] Normal Light & Power electric polices and charges will apply for this
development.
Department: Natural Resources Issue Contact: Doug Moore
Topic: General
Number: 8 Created: 10/28/2005
[10/28/05) Please provide a detail of the trash enclosures, measurement from the site and
utility plans indicate that the enclosure is not size appropriately. Please refer to the
guidelines provided online at http://www.fcgov.com/recycling/pdf/enclosure-
guidelines0804.pdf
Page 3
[10/31/05] Final Compliance: Since the Timberline Road improvements are being
constructed by City's Street Oversizing department, the plans need to clearly show who is
building what. An estimate for all Timberline improvements must be submitted for Matt
Baker's review and approval. Once that number is agreed upon it will be put into the
Development Agreement and payable prior to the issuance of the first building permit.
Topic: Landscape
Number: 24 Created: 10/31 /2005
[10/31/05] Remove the contours.
Number: 25 Created: 10/31/2005
[10/31/05] Show, label, and dimension all easements, rows, etc.
Topic: Offsite Easements and ROW
Number:21 1 Created:10/31/2005
[10/31/05] Letters of intent must be provided for all offsite easements, row and construction
prior to scheduling the public hearing. The actual easements and row dedications will need
to be provided prior to plan approval.
Topic: Plat
Number: 22 Created: 10/31 /2005
[10/31/05] All easements must be locatable. Please dimension all easements.
Number: 48 Created: 11 /7/2005
[11/7/05] From Technical Services: Boundary and legal do not close using curve date. OK
using chord bearing and distance, ck curves.
Number: 49 Created: 11 /7/2005
[11/7/05] From Technical Services: Quarter corner location - I have discussed with Steve
Lund.
Number: 50 Created: 11 /7/2005
[11/7/05) From Technical Services: The hatching is confusing, can it be "toned down", lot
specific?
Number: 51 Created: 11/7/2005
[11/7/05] From Technical Services: There are several existing easements affecting the lots.
Are they to be vacated?
Topic: Public Hearing
Number: 46 Created: 11 /4/2005
[11/4/05] The following items must be addressed prior to scheduling the public hearing: 12,
14, 17, 21 and 45.
Topic: Sagebrush Drive Variance
Number: 12 Created: 10/31 /2005
[10/31/05] Your variance request for the modified industrial local has been denied. There is
quite a bit of history to this but I'll try keep it short. The street section along the Police
Station was based on an old TIS for Mansion Park, a residential neighborhood that is no
longer going to happen. What was to be Mansion Park has asked for rezone to
commercial and the anticipated traffic patterns will change. Depending on the TIS, the
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
VF RIPLEY ASSOCIATES Date: 11/08/2005
SANDY MCFERON
401 WEST MOUNTAIN AVENUE, SUITE 201
FORT COLLINS, CO 80521
Staff has reviewed your submittal for TIMBERLINE CENTER PDP, and we offer the
following comments:
ISSUES:
Department: Engineering Issue Contact: Susan Joy
Topic: Alternative Site Plan
Number: 19 Created: 10/31 /2005
[10/31/05] Same comments apply here.
Number: 47 Created: 11 /4/2005
[11/4/05] Please check with Ted on this, but I thought that the drive -through could not
interrupt the sidewalk along the street frontage.
Topic: Bear Mountain Variance
Number: 11 Created: 10/31 /2005
[10/31/05] The proposed typical cross section has been approved with some changes to the
striping. Please strip in 6' bike lanes and 12' travel lanes.
Topic: General
Number: 10 Created: 10/31/2005
[10/31/05] Sagebrush needs to be renamed to match Spring Creek Farms North PDP. Ted
Shepard has that info.
Number: 14 Created: 10/31 /2005
(10/31/05] Parking setbacks are determined by the AWDTs in the TIS and must be
designed in accordance with figure 19-6. The parking lot entrances off Sagebrush and Bear
Mountain do not meet the minimum 50' setback requirement.
Number: 16 Created: 10/31 /2005
[10/31/05) Please label, dimension and design all curb return radii in accordance with Table
8-2.
Number: 17 Created: 10/31 /2005
[10/31/05] Does the emergency access easement through the mini storage meet PFA's
minimum 25' inside and 50' outside turning radii requirement? You can show this with a
separate exhibit if you like.
Number: 20 Created: 10/31 /2005
[10/31/05] The utility plans and plat show offsite improvements that need to be shown on all
plan sets. All plan sets need to match and show the same information.
Number: 26
Created: 10/31 /2005