Loading...
HomeMy WebLinkAboutTIMBERLINE CENTER - PDP - 41-05A - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWPlease let us know if you have any other issues. Sincerely: �- 16 --? ''f -'_1 Sandy McFeron Project Manager V.F. Ripley Associates, Inc. Mike Oberlander Project Manager North Star Design, Inc. f. If there is to be any residential uses in this development the minimum parking requirements are set forth in Section 3.2.2(K)(1) of the LUC. No residential uses have been planned with this development. 9. This development request will be subject to the Development Review Fee Schedule that is available in the Current Planning Department office. The fees are due at the time of submittal of the required documents for the appropriate development review process (overall development plan, project development plan, final compliance) by City staff and affected outside reviewing agencies. However, development proposals may be approved only after the required rezoning of the property (from T - Transition to something other, conceivably I - Industrial) is approved by City Council. Acknowledged. 10. This development proposal is subject to the requirements as set forth in the City's LUC, specifically Articles 2. Administration (Development Review Procedures), Article 3. General Development Standards, and Division 4.23 - Industrial District, if zoned as such. Copies of Article 3 and Division 4.23 are available in the Current Planning Department or on the City of Fort Collins website @ www.fcgov.com. Go to Departments, then the Current Planning Department. Acknowledged. 11. The City's Current Planning Department will coordinate the development review process. The required submittal package will be submitted to this department and distributed accordingly to other City departments and outside reviewing agencies involved in development review. Acknowledged. 12. The proposed ODP and/or PDP would be subject to a Type 2, Planning and Zoning Board review and public hearing, based on some of the proposed land uses. • Section 2.1.2(D) of the LUC states that when a development application contains both Type 1 and Type 2 uses, it will be processed as a Type 2 use. Acknowledged. unless it is included in a convenience shopping center, which is a permitted use. All general retail is located within a convenience shopping center. Refer to site plan for designated convenience shopping center. b. The convenience store, with fuel sales, as shown in the Convenience Center on the conceptual plan would not be permitted based on Section 4.23(B)(3)(c)5 of the LUC, which prohibits a convenience retail store with fuel sales from being within 3/4 of a mile of another c-store with fuel sales. There is an existing Shell c-store with fuel sales at the corner of East Prospect Road and Specht Point Road, which is 2,600' away (or just 1/2 mile). A modification is being requested for the convenience store. An alternate plan is also being submitted. c. Freestanding standard and fast food restaurants are permitted in the I District, without drive-in or drive -through facilities. Drive-in restaurants are permitted, only if located in a convenience shopping center. The drive-thru restaurant has been included within a convenience shopping center. Refer to site plan. d. Please review the lists of uses permitted in the I - Industrial District, subject to administrative review (Type 1) and public hearing or Planning and Zoning Board review (Type II) and public hearing. Acknowledged. e. The maximum parking allowances (for non-residential uses) for this development will be based on the proposed uses on the PDP. A convenience shopping center (no more than 7 acres in size) would be allowed no more than 5 parking spaces per 1,000 square feet of total leasable floor area in the center. Parking allowances for other freestanding uses would be based on the Non - Residential Parking Requirements set forth in Section 3.2.2(K)(2) of the LUC. Acknowledged. d. A Fugitive Dust Control Permit may be required and this permit is issued by the Larimer County Environmental Health Department. Please contact them directly, at 498-6700, to discuss their requirements. Acknowledged. Department: Transportation Planning Issue Contact: David Averill Topic: General Number. 7 a. A TIS, addressing all modes of transportation, will be required with your PDP submittal. Please contact Eric Bracke of the Traffic Operations Department, at 224-6062, and David Averill of the Transportation Planning Department, at 416-2643, to determine what information will be needed in the TIS pertaining to Level of Service (LOS) for vehicle, pedestrian, bicycle, and transit modes of transportation. A Transportation Impact Study (TIS) is being submitted with this submittal. b. A direct pedestrian walkway from the convenience store to the public sidewalk along South Timberline Road must be provided. A direct pedestrian walkway from the convenience store to the public sidewalk along South Timberline Road has been provided. Refer to site plan. C. A 7' wide detached sidewalk along the west side of South Timberline Road, initially built to the ultimate width, must be constructed as part of this development. A T wide detached sidewalk will be constructed with Timberline Road. Department: Current Planning Issue Contact: Steve Olt Topic: General Number: 8 a. After further review of the I - Industrial District in the LUC, it is important that the applicant be aware of the fact that freestanding retail buildings (presumed to be General Retail), as shown on the north portion of the conceptual plan, would not be permitted in the I District. General retail is not a permitted use in this district a. Currently there is no City of Fort Collins power to the site. There is an overhead Public Service line in the area. NSD — Power will be running up the east side of Timberline with the Timberline Road Project. b. There apparently are no real problems in getting City electric service to the property. Acknowledged. C. The standard electric development charges will apply to this development request. Acknowledged. d. The transformer locations must be coordinated with Light & Power. Acknowledged. Department: Natural Resources Issue Contact: Doug Moore Topic: General Number. 6 a. Native plant materials and grasses should be incorporated in the Landscape Plan for the development. The use of bluegrass should be minimized. Acknowledged. b. If prairie dogs exist on this property they must be relocated or humanely eradicated prior to any construction occurring on - site, including overlot grading. This is set forth in Section 3.4.1(N)(5) of the LUC. Acknowledged. c. All trash enclosures will need to comply with Section 3.2.5 (Trash and Recycling Enclosures) of the LUC. Trash enclosures have been design large enough to incorporate recycling. NSD — Per the Timberline Widening Report, this area is in the Foothills Basin and will release to storm pipes constructed with Filing 2 of SideHill at the 2-year historic rate (for the developing area). b. The site is on Stormwater Inventory Map #11 K. A copy of the map can be obtained from the Utility Service Center at 700 Wood Street. Acknowledged. C. The standard drainage and erosion control report and construction plans are required and they must be prepared by a professional engineer registered in the State of Colorado. A preliminary report has been prepared for the PDP. d. On -site detention is required with a 2-year historic release rate for water quantit and water ug ality extended detention is required to treat the runoff. Detention and Water Quality has been provided per the standard. e. The outfall for this site is probably South Timberline Road. Presently there is no curb and gutter or storm sewer, so until the City's Timberline Road improvements project installs curb and gutter the outfall to the north would have to be analyzed and possibly improved since this project would be adding to the outfall. The street improvements are scheduled to start in March, 2006. There may be storm sewer built with the project that could be used by development on this site. There have been discussions with the Sidehill development and the Engineering Department about building detention on the west side of South Timberline Road when the street is widened. That detention would then outfall through the Sidehill development to the east, which is another option for an outfall. This PDP will provide detention on site to the 2-year historic rate and discharge to the storm sewer being built on SideHill. Department: Light & Power Issue Contact: Bruce Vogel Topic: General Number. 5 Acknowledged. Department: Water/Wastewater Issue Contact: Roger Buffington Topic: General Number: 3 a. There is an existing 24" water main on the west side of South Timberline Road. Development on this property will be responsible for a repay for the water main. Acknowledged. b. There currently is no sanitary sewer service to this site. Water/Wastewater is looking at several locations for sanitary sewer in this area, with the Sidehill project being one of the locations. The sanitary sewer should be constructed with the road construction. The Timberline Project will build sewer around the Police Station and to the south property line of this site. This sewer is able to serve the entire project. C. Plant investment (development) fees and water rights will apply to this development request. They will be collected at the time of issuance of building permits. Acknowledged. d. The City's water conservation standards for landscaping and irrigation systems will apply to this development request. Acknowledged. e. A grease interceptor would be required for any restaurant in the development. Acknowledged. Department: Stormwater Utility Issue Contact: Glen Schlueter Topic: General Number: 4 a. The site is located in the Spring Creek Drainage Basin, where the new development fee is $2,175 per acre, which is subject to the runoff coefficient reduction. The fee is to be paid at the time of issuance of building permits. A median and 3/ access is included in the Timberline Plans — no other access from Timberline will be allowed (per Eric Bracke). • This project should be coordinated with the Timberline Road plans. Triple street cut fees may apply. Please contact Matt Baker, at 224-6108, regarding this. No cuts in Timberline should be required with the current plan. • The interior road classifications will be determined by the TIS. Acknowledged. • There may be a need to vacate the existing railroad ROW adjacent to this property. Acknowledged. • Street Oversizing is construction interim improvements to the west side of South Timberline Road along this property frontage. This development will be responsible for designing and constructing the rest. All Timberline requirements for this project will be satisfied with the Timberline Widening • No structures of any kind are allowed in easements. Acknowledged. A subdivision plat will be required as part of this submittal to the City for development review. A Plat is included with the PDP submittal. k. A Development Agreement and a Development Construction Permit will be required for development on this property. Acknowledged. City staff is recommending that a utility coordination meeting be held to discuss this development proposal. Susan Joy will assist you in scheduling this meeting. Please call her at 221- 6605 or 221-6750. h. The property owner / developer will be responsible for undergrounding any existing overhead utilities on or adjacent to the property. It is our understanding that the Timberline Project will remove the overhead lines. i. This development will be subject to the requirements set forth in the Larimer County Urban Area Street Standards (LCUASS). • A public street connection to adjacent developable or redevelopable land is required at a spacing of no more than 660', per Section 3.6.3(F) of the LUC. The layout accounts for street connections. • Development on this property will be responsible for preliminary design of off -site street improvements for a distance of 500'. Preliminary design to the north is included. • The Timberline Road access needs to meet the spacing / separation requirements set forth in LCUASS. The access location and movement (3/4) has been designed with the Timberline Project (in coordination with Engineering and Traffic). • Depending on where the Timberline Road access is located on the hill, there may be some sight distance problems. The access (designed with Timberline Road) is 600' south of the crest of the hill. Sight distance is about 960' and the access has a southbound acceleration lane. • Please contact the Poudre Fire Authority (PFA) for their emergency access needs and requirements. All buildings face a public street or an emergency access easement and drive. • There may have to be a median in Timberline Road in front of this property. There are 2 public streets proposed. The one off of Timberline was located with the design of Timberline Road. The north -south street is an extension of the street proposed on the west side of the Police Station. Variances for the street widths are included in the PDP submittal. C. A Transportation Impact Study (TIS), addressing all modes of transportation, will be required with your ODP and/or PDP submittal. Please contact Eric Bracke of the Traffic Operations Department, at 224-6062 and David Averill of the Transportation Planning Department, at 416-2643 to determine what information will be needed in the TIS pertaining to Level of Service (LOS) for vehicle, pedestrian, bicycle, and transit modes of transportation. A Transportation Impact Study (TIS) is being submitted with this submittal. d. The standard utility plan submittal requirements will apply to this development request. Preliminary plans are included in the PDP submittal. e. Street oversizing fees will apply to this development request. The fees are based on vehicle trip generation for the proposed land uses on the development plan. Please contact Matt Baker of Engineering, at 224-6108, for detailed information on the fees. The fees will be collected at the time of issuance of building permits. These fees have already been collected in order to include this frontage in the Timberline plans. f. The Larimer County Road Impact Fees will apply to development on this property. Acknowledged. g. Development on this property will trigger a repay for the Timberline Road improvements. Please contact Matt Baker, at 224-6108, for information on the repay. This project is participating in the Timberline project. b. This development will be subject to the parking requirements (vehicle & bicycle) set forth in Section 3.2.2(K) of the Land Use Code (LUC). Acknowledged. c. Sections 3.2.1(E)(5) and 3.2.2(M)(1) of the LUC set forth the parking lot interior landscaping requirements, in this case being at least 10% of the interior space of all of the parking lots (containing 100 spaces or more). Acknowledged. d. This property is in the City's Residential Neighborhood Sign District and is subject to the requirements set forth in Section 3.8.7(E) of the LUC. Acknowledged. e. Handouts of the various LUC sections were given to the applicant at conceptual review. Acknowledged. Department: Engineering Issue Contact: Susan Joy Topic: General Number: 2 a. The property fronts on South Timberline Road, which is designated as a 6-lane major arterial street on the City of Fort Collins Master Street Plan. This property will have to dedicate necessary street rights -of -way (ROW) and easements behind the ROW for South Timberline Road and the internal streets on the required subdivision plat. A total of 141' of right-of-way (ROW) width is required for Timberline Road in this location. This property is participating in the Street Oversizing Project and will be dedicating ROW and easements with that project (prior to the approvals of the development. b. The Overall Development Plan (ODP) and/or the Project Development Plan (PDP) will be subject to the requirements set forth in Section 3.6.3 - Street Patterns and Connectivity Standards of the LUC. \/ FT::lipheyASSOCIATES INC Landscape Architecture Urban Design Planning October 11, 2005 Mr. Ted Shepard Fort Collins Planning Department 281 North College Avenue Fort Collins, CO 80524 Timberline Commercial Center — TYPE II Response to staff Project Review comments Dear Mr. Shepard, We have reviewed the staff letter dated March 07, 2005 and have the following comments: Please note the site plan and building plan have been completely redesigned since conceptual review. ITEM: Request for a commercial center containing: • retail uses • bank • office uses • convenience center with fast food and fuel sales • multiple fast food restaurants COMMENTS: Department: Zoning Issue Contact: Jenny Nuckols Topic: General Number. 1 a. The uses as proposed on the conceptual plan, if the property is rezoned I - Industrial, are subject to a Planning and Zoning Board (Type 2) review and public hearing. Acknowledged. Phone 970.224.5828 Fax 970.224.1662 401 West Mountain Ave. Suite 201 Fort Collins. CO 80521-2604 vfripley.com