HomeMy WebLinkAboutROCKY MOUNTAIN BATTERY & RECYCLING PUD - PRELIMINARY & FINAL - 51-89 - - RECOMMENDATION/REPORT W/ATTACHMENTSITEM NO. 2
MEETING DATE 12-18-89
STAFF TPd shenard
City of Fort Collins PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Rocky Mountain Battery and Recycling P.U.D., Preliminary and Final,
#51-89
APPLICANT: Mr. Dean Hoag
c/o Mountain Plains Constructors
1708 East Lincoln Avenue
Fort Collins, CO. 80524
OWNER: Mr. Dean Hoag
Rocky Mountain Battery and Recycling
1475 North College Avenue
Fort Collins, CO. 80521
PROJECT DESCRIPTION:
This is a request for Preliminary and Final P.U.D. to allow the expansion of an
industrial use for the recycling of aluminum and other non-ferrous metals. The new
construction consists of a 4500 square foot warehouse located behind the existing
retail business. The entire P.U.D. consists of 8.73 acres divided into two phases.
The existing business is zoned H-B, Highway Business and the area of expansion is
zoned M-M, Medium Density Mobile Home. The property is located at 1475 North
College Avenue.
RECOMMENDATION: Approval
EXECUTIVE SUMMARY:
The reason for the P.U.D. request is because the proposed location of the recycling
warehouse is in the M-M, Medium Density Mobile Home Park zone district. Although
the new building is an extension of an existing "use by right", and is on land owned
by the applicant, the location is in the M-M zone. The P.U.D. is divided into two
phases. The first phase includes the existing business and the proposed new building
for a total of about one acre. The second phase would remain undeveloped and
consists of about seven acres. The project scores only 36% on the Industrial Uses
point chart, below the 50% required minimum score. A variance from meeting the
required minimum score on the Industrial Uses point chart is recommended based on
the compatibility of the surrounding land uses, negligible impact on adjacent
properties, and the relatively minor scale of the proposed use. A six foot wood
fence will screen the property from the nearest residential area located approxi-
mately 900 feet to the west. The traffic impacts are considered minimal.
DEVELOPMENT SERVICES 300 LaPorte Ave. P.O. Boa 580 Fort Collins, CO 80522-0580 (303) 221-6750
PLANNING DEPARTMENT
0
CJ
Rocky Mountain Battery
December 18, 1989 P &
Page 1
COMMENTS
1. Background:
& Recycling PUD, Preliminary & Final-#51-89
Z Meeting
The surrounding zoning and land uses are as follows:
N: H-B and I-G; Front Range Steel
S: H-B and I-G; Auto related and commercial businesses
E: H-B; Auto related businesses and vacant
W: M-M; North College Mobile Home Plaza
Rocky Mountain Battery and Recycling is an existing business that sells new automo-
tive batteries, accepts used batteries, leases U-Haul trucks and trailers, and recycles
aluminum and non-ferrous metals.
2. Land Use:
The request to add a recycling warehouse was evaluated against the Industrial Uses
point chart. The L.D.G.S. defines industrial uses as "all industrial and
manufacturing uses, and other uses which are of the same general character." The
project achieves a score of 36%. This score is below the minimum required score of
50%. In order to approve this P.U.D., with a score below 50%, the Planning and
Zoning Board must approve a variance to the Industrial Uses point chart of the
Land Development Guidance System. It should be emphasized that the variance
would apply only to that portion of Phase One of the P.U.D. that lies within the
M-M zone. Phase Two remains vacant. Thus, the variance to the point chart does
not apply to any portion of Phase Two. Future development of Phase Two would
allow only uses by right in the M-M zone. Any uses on Phase Two more intense
than that allowed by M-M zoning would have to be processed as a P.U.D.
The Staff feels that granting a variance to the required minimum score of the
Industrial Uses point chart for this P.U.D. is justified based on the following
considerations:
A. The properties to the north and south of the proposed recycling warehouse are
both zoned I-G, General Industrial. The uses permitted are as follows:
(1) Any business, commercial, industrial or manufacturing use.
(2) Any land use located on a Planned Unit Development plan as defined,
processed and approved in according to Section 29-526."
The surrounding properties are
character. The area to the west
residence is approximately 900 feet
vicinity is outdoors and allowed
therefore, that the proposed use is
surrounding area.
of a commercial/automotive service/industrial
is seven acres used as a pasture. The nearest
to the west. Much of the activity in the general
by the I-G zoning. It is Staff's contention,
compatible with the industrial character of the
0 •
Rocky Mountain Battery & Recycling PUD, Preliminary & Final-#51-89
December 18, 1989 P & Z Meeting
Page 2
B. The activity associated with the recycling will occur within the proposed
structure. Consequently, there will be no negative impacts such as visible storage,
noise, or glare associated with the proposed use. The number of recycling customers
is approximately two cars per hour. In addition, there would be two semi -trucks per
month serving the proposed use. It is Staff's belief that this activity will have
minimal impact on the surrounding properties. In fact, the allowable uses on the
adjacent industrially zoned parcels permit far more intensive activities as uses by
right. The proposed includes a six foot solid fence on the west line of Phase One
to screen the yard and building. The relatively minor impact of the proposed use,
therefore, adds support to justifying the variance to the point chart.
C. On the west side of North College Avenue, from Cherry Street on the south to
the municipal boundary on the north, there is a mix of commercial, retail, indus-
trial, and auto related uses. The zoning map indicates that the west side of North
College Avenue consists of either H-B, Highway Business, or I-G, General Industrial
zone districts. These parcels range in depth from the frontage of College Avenue to
approximately 1,000 to 1,500 feet. The Rocky Mountain Battery P.U.D., Phase One,
would achieve a depth of only 385 feet. Allowing the variance to the P.U.D. point
chart would not represent an intrusion into an established residential area but,
rather, a minor extension of the similar land uses.
D. The only existing residential use, North College Mobile Home Park, is not
significantly impacted by the P.U.D. request. The 900 foot separation of vacant
land, the six foot solid fencing, and the enclosed structure all work to preserve the
integrity and residential character of the residential area. The granting of a
variance to the Industrial Uses point chart does not detract from the value or use,
of any of the adjacent properties.
E. The proposed building would measure 4,500 square feet with a height of 16
feet. The scale, therefore, is not intrusive and is compatible with the existing
pattern of development in the area.
In terms of land use, it is Staff's conclusion that granting a variance to the
Industrial Uses point chart is justified based on compatibility with the surrounding
area and negligible impact on adjacent properties. The introduction of an industrial
use in this location conforms to existing zoning on both the north and south
neighboring properties, and the scale is of a minor nature. Staff, therefore, finds
that granting of the variance will not cause substantial detriment to the public good
or impair the purpose of the L.D.G.S.
3. Neighborhood Compatibility:
A neighborhood meeting was not held for this proposal. There are no residential
neighborhoods within proximity of the site. The addition of a 4,500 square foot
steel building, located 260 feet west of North College Avenue, was not considered to
be such an intrusion as to warrant public comment through the neighborhood meet-
ing format.
0 i
Rocky Mountain Battery & Recycling PUD, Preliminary & Final-#51-89
December 18, 1989 P & Z Meeting
Page 3
4. Desban:
The P.U.D. consists of two existing buildings, located in the H-B zone, and one new
steel building, located in the M-M zone. The new building will be served by a
circular asphalt driveway and feature seven parking spaces. There would be a
gravel yard area for truck turn -around capability. The yard would be screened on
the west by a six foot solid wood fence.
The new building would feature foundation shrubs and additional trees on the north
property line. The existing landscaped island along College Avenue would be
upgraded with additional shrub material to cover the mulch bed.
There is no additional signage requested with this P.U.D.
5. Transportation:
The traffic impacts associated with this P.U.D. are minimal. Since the request does
not generate more than 20% additional traffic, a permit from the State Highway
Department will not be required. Staff investigated the possibility of closing one of
the curb cuts that serve the property and concluded that given the existing use, a
circular drive is presently safe and efficient. Should the property redevelop in
major fashion, this closure would be reexamined.
RECOMMENDATION
Staff finds that the request is justified to vary the requirements of achieving a
minimum score of 50% on the Industrial Uses point chart. Staff further finds that
the request for the Rocky Mountain Battery and Recycling P.U.D. meets the other
applicable criteria of the L.D.G.S. Staff, therefore, recommends approval.
V
- %A
:ot
EEMIM
IRWIN
•3.
IN .off'
xru ... 'futto a0 lagxrK - e IFort. p �eeeLLL Wier.
Io— - - rcei y■6
ov6RALL l.IT6 PLAN
IUA[ Rsnmla
r IW «N w _ lh a lar t 1 er IRtlm E. lnm.n o t r.lR.
mMty W t el l SI. ,wt Coll•u. .r t elweb. e Oe [eaX ul. brth� wE neber Swt\
11�9.v «I txOeW ay I s�nO�W =eN'frw ie1y 1 SmW
5[<l.w a eM n l Iii6 Iret: l rt5mt\ )rt.51'feet�IXue
Ai�lal6 frP tnw•<e xo.0 aaD.m Ir ee<e frl 110.0a IM: thw,
ln Ili 1 Irt h th mfnl al b91m�n9 <mhl �N 8.131i e<nX Rre
-- ' O3.0p•
. I.... aX.t (o.nitiln „" �°�',�[w.Ess R(wr..a• iRE.....r[•
.MGvv[ i GJ.IIxGI pa eYPv. v0.me F615TnR. rofA.Ir V [IT,
• � �m (fY�f Itmlr��l SVASOA �iruiml0'G �aIYIIY vL,��
G axmXli W v N EEO<irE[ ((nxW SPUMIrvn M4nppp16) '
[¢IMY YIPS PFD St.18 BOISrluli v RY,v
• [ xr'AR t011l� (IUIDxIrbEPW I:nlxvslil lielort....' m. LUEN Rla Fd.,.MZ
nxi neulixies°nwllrs, s wL.
■ rimuwW.rrlWiluP%iMst'°xllili� Iru nl:cnnairr'eni...ls• fiNvm... lafw mPX...
nxe Iw.I:ce't•t wwlpc�sn'o is wnt. slnvlr afR•u m.n
o.., .n ,.eEe « w..t.,. .« nKwRE r• wTtaq. A�.eE fw..rc � I
_ "� a 'a it k'��. _-if�•+I+K - � I�'E — _ — — g}x
< BBM BUILDING
_ tl
rust :. i . nr.4erMKii e•1 • .a T Y.'\\[ iTi ti aIi[
Ull
�tjwet �
s ,Iluww Faer..r i I
H °
\ uer.Ft. e.. wa. WtN�m o
01=TE PLAN
NORTH
des
TH.pATiO••
U••t•tl RAW C"ATMW. I•T.
rrs•arr...... n LL/M n
C— ��
ut yw.Were e[mll>I[F' folet�ftr~
!� �e[efl � ue. K wlltvwi Y w Ir r'<r
r,< <I..b ft�, W rM 6XYel .9efF
[.t14� mllr[fw of rcI<Wb K� e[ 4e
tare.
•r .I�.f._ �i.e,r. mf mr [r niiytYe
If re Nrr[�etW[r of W veiere for W
xew
I.0 w.inP
_— . Nwriq s 4•L
CINITY
T•BaP
nl. rle
M
IucYo
ae
wf................................
R.IIo W. 1-r. (PXASE ONE)
o
u_
;
_Rw, i wm
- INwwi
Rl of.a............................
...IW sv. fT. .........................flt
•
— U.c. MPIv[..................
IID ID. FT . It
•......•••.....•.•••...•
ISM bueelux•
viF6 ui P.v'a .sv.Lt...............li
iS..
�E•KT . it ........................
Ev n [IT
EXISTING OEVF1oPMENT........
vXASE
..24,ib qE[
I.—
�[+� Gww.E i4M.
GNo . ... . . .. .
PHASE
Ss.SOo �.R.
. . .. .
I
�NDSO PPE ISLAND
EluST4 wE[O 6.ggIE0. R St
IEntlrEa • RRKFS � NFw S.ggllq
--J• —li \OD 4 ileSS (fOCXS faM \(CENT
7, 777
m
...�� �....,T
nAF•a .R zalxa li.ei .rnirK el
ioilmsN ar w W _ r
of i.. 19a9e r be a • . tl
th <W I[fm. _'. '..M<tfw. w[ 1•tl. w .I. Kt , .
rf.
ROCKY MOUNTA2N BATTERY & RECYCL=NG,
P _ U - D _ PRELiM=NARY & F2NAL
KUM 1
15-89
•
kOe-x y PLIUNTAIN A t?r7ZX Y* 4)�C yc L J/V 6
ALL DEVELOPMENT: NUMBERED CRITERIA CHART
ALL CRITERIA
APPLICABLE CRITERIA ONLY
CRITERION
Is the crlterion applicable?
Will the criteron
be satisfied?
If no, please explain
p
0:�'`��,�'�°°
Yes No
NEIGHBORHOOD COMPATABILITY
1. Sociai Compatability
2. Neighborhood Character
3. Lc-d Use Conflicts
or✓
4. Adverse Traffic Impact
PLANS AND POLICIES
5. Comprehensive Plan ✓ �/ ✓
PUBLIC FACILITIES & SAFETY
6. Street Capacity
7. Utility Capacity
8. Design Standards
9. Emergency Access
10. Security Lighting
,�
✓
11. Water Hazards
RESOURCE PROTECTION
12. Solis & Slope Hazard
13, Significant Vegetation
14, Wildlife Habitat
15. Historical Landmark
1/
16. Mineral Deposit
17, Eco-Sensitive Areas
18. Agricultural Lands
ENVIRONMENTAL STANDARDS
19, Air Quality
20. Water Quality
21. Noise
22. Glare & Heat
23. Vibrations
24. Exterior Lighting
✓
,.
25. Sewages & Wastes
./
SITE DESIGN
26. Community Organization
le
me
00,
27 Site Organization
28, Natural Features
/
29. Energy Conservation
30. Shadows
31. Solar Access
✓
✓
32. Privacy
33. Open Space Arrangement
34. Building Height
35. Vehicular Movement
36. Vehicular Design
be
37 Parking
v
38. Active Recreational Areas
✓
39. Private Outdoor Areas
✓
40. Pedestrian Convenience
✓
41. Pedestrian Conflicts
42, Landscaping/Open Areas
✓
y
✓
43. Landscaping/Buildings
y
�/
✓
44. Landscaping/Screening
45. Public Access
46. Signs
�/
0 •
kOC k y M A (J Ai7A4 A) A4 --7�A y + kEL YC /- /N P o.
INDUSTRIAL
USES
POINT CHART F
For All Critera
Applicable Criteria Only
Criterion
Is The
Criterion
Applicable
Yes No 11Yes
II III Iv
ircle
The
Correct
Score
VW' No
Multiplier
Points
Earned
1x11
Maximum
Applicable
Points
a. "North" Fort Collins
X
X
0
1
c;2-
2
b. Industrial center
X
2
0
3
0
6
C. On arterial street
X
2
0
1
—
—
d. Energy conservation
2
0
3
3
6
e. Historic preservation
711
1
2
0
2
—
—
f,
1
112101
g,
1
2101
h,
1
2
0
i,
1
2
0
j
120
k,
1
1
2
0
I,
1
2
0
' vW —very Well Done Totals % 1
v 1 vi
Percentage Earned of Maximum Applicable Points VNI =V11 36,%
vll
-27-
O W R I
j �fl jl�
NOV 2 91989
TRAFFIC FLOW REPORT:
At the present time we average 2 cars an hour for recycling,
2 cars an hour for U-haul customers, and 4 cars an hour for
battery business. Approximately 25% of traffic is from the
recycling business, 25% is from U-haul business, and 50% is
from the battery business. There seems to be three peak times
through the day. Usually the times are early morning, lunch
time, and late afternoon. We average two semi -trucks a month.
Our busiest days are usually Mondays and Saturdays.
With the proposed expansion of the warehouse we do not
anticipate any change or increase in the present traffic
flow. The only increase in traffic flow that we do anticipate
would be from the normal growth of the business. Any future
increase in traffic flow from growth would be minimal.