Loading...
HomeMy WebLinkAboutTHE ORCHARD AT CLARENDON HILLS SUBDIVISION - PRELIMINARY - 47-89B - - CORRESPONDENCE-CONCEPTUAL REVIEWIt Services Planning Department City of Fort Collins October 2, 1989 Eldon Ward Cityscape Urban Design 3030 S. College Ave. #200 Fort Collins, CO 80525 Dear Eldon: For your information, attached is a copy of the Staff's comments concerning Clarendon Hills 4th which was presented before the Conceptual Review Team on October 2, 1989. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, Sherry Albertson -Clark Senior Planner SAC/gjt Attachment xc: Tom Peterson, Director of Planning Mike Herzig, Development Coordinator Rick Richter, Civil Engineer I Project Planner File 10 LaPorte .Avenue 1-ort Collins, CO S0522-0580 Y CONCEPTUAL REVIEW STAFF COMMENTS MEETING DATE: October 2, 1989 PROJECT: Clarendon Hills 4th APPLICANT: Eldon Ward, Cityscape, 3030 S. College, #200, Fort Collins, CO 80525 LAND USE DATA: Request for 76 single family lots and 30 patio homes on 47 acres, located east of Shields Street and 1/2 mile south of Harmony Road. COMMENTS: 1. Three-phase power is available in the area. 2. The site will be served by the Fort Collins -Loveland Water District and the South Fort Collins Sanitation District. The developer is responsible for working directly with the district. 3. A 20' inside and 40' outside turning radius is needed on the cul-de-sacs. Maximum cul length is 660' from a single point of access. Units con- structed beyond this distance will need to be sprinkled with residential sprinkler systems. 4. The patio home area will require further evaluation in terms of parking, access and circulation for fire equipment access. 5. Remaining Shields Street improvements will be triggered by development of property along Shields. Street design will need to be done as part of this development, but phasing of improvements is yet to be determined. Spe- cific phasing of improvements will be incorporated into the development agreement. 6. Variances for any street design standards must be submitted by the project engineer (ie. 20 mph design speed, 28' streets). 7. Street oversizing fees will apply and the property will be eligible for oversizing reimbursements. 8. No on -site detention will be required. A storm drainage report and plan and a grading plan must be submitted. Erosion control will need to be addressed with these plans. Building permits may be held until storm drainage improvements are completed. 9. A neighborhood meeting will not be required; however, the applicant should contact the HOA members and owners within 500' (west of Shields) about the proposed project, particularly regarding the patio homes, prior to submittal to the City. A copy of the information sent to property owners should also be provided to staff. No Text