Loading...
HomeMy WebLinkAboutTHE ORCHARD AT CLARENDON HILLS SUBDIVISION - PRELIMINARY - 47-89B - - RESPONSE TO STAFF REVIEW COMMENTS (2)CMM@@P* urban design, inc.. 3030 south college ave., suite 200 fort Collins, Colorado 805.25 (30.3) 226-4074 November 29, 1989 Sherry Albertson -Clark Cit:y of Fort Collins Planning Department P.O. Box 580 Fort Collins, CO 80522 Dear Sherry; Attached are five copies of the Preliminary Plat of The Orchard at. Clarendon Hills reflecting revisions made in response to Staff Comments dated November 14, 1989. Specific responses include: 1— Utility services will be coordinated with final utility plans. 2. Street tree locations will be coordinated with final development plans. 3. The utility and landscape easements indicated ,.are included as part of Lots 2 and 26. Landscaping within these easements will be maintained by the Clarendon Hills Home Owners Association. 4. We have discussed the possible need to overlay a portion of Ashford Lane with City Staff. The extent and type of overlay needed will be resolved with final engineering plans. 5. The owner of lot 23 Clarendon Hills lst Filing has agreed to a replat that will allow access to Lot 27 as indicated on the preliminary plat. The final plat of The Orchard at Clarendon Hills will include this replat. 6. There is an existing, gated, private access drive onto the Orchard property off the end of Paradise Lane. Upgrading this existing access to a well defined, paved private road will provide The Orchard with a second point of emergency access and serve several other purposes: - Because the road will be private, the gate will be left in place. The gate can be double locked to allow fire department and restricted private access. This will be similar to the condition at EPIC where keyed bollards restrict all but emergency access. I O o urban design, inc. - This access way - in conjunction with an access easement between Lots 12 and 13 - will allow down stream users continued access to irrigation lateral head gates. Over 1300 feet of Paradise Lane is currently served by a single point of access. The proposed private road will remedy that hazard and will also provide emergency vehicles on Paradise lane with access to a City standard turnaround. The road will be paved and further defined with landscaped berms and a driveway cut at Abbey Road. The applicant will be contacting the adjacent lot owners in Applewood Estates to review this proposed limited access road. 7. Right-of-way needed to allow the possible extension of Apple Drive will be reserved with The Orchard final plat. 8. By providing the minor amount of required detention in the southeast corner of the Orchard within a defined drainage easement across private lots the following may be accomplished: - The detention can be spread out across a gentle slope rather than forced into a defined "hole" in an open space tract. - Common access to all residents of Clarendon Hills will not be needed. Avoiding open use of this area is desirable from the point of view of both The Orchard and Applewood Estates. Fencing and landscape restrictions will be formulated to ensure the area will continue to function as a detention pond. 9. If the proposed streets are built to the normal City standard of 36' of pavement with walks on both sides and underground gas and electric beyond the back of walk, approximately 57 trees (32 of which are dead or severly diseased) will have to be removed. The proposed variance to a 28' street with a detached, meandering walk, would probably save 15 trees (9 of which may have several years of life remaining). If desired, a detailed survey of the existing trees can be provided with final plans; however the poor condition of the trees makes the value of such a survey questionable. urban design, inc. 10. Of the 250+ apple trees on the site, over 80% appear to be dead or severly diseased, and all are extremely old. Approximately 50 elms in the southwest portion of the site will not be impacted by street construction. Lots in that area are being designed to provide opportunities for building sites with minimal impact on these mature elms. There is a large amount of deadfall on the site which will be cleaned up with development. Landscape guidelines are being prepared that will encourage homebuilders to preserve viable existing apple trees. The "orchard" environment will be revived through the required use of fruit trees as the primary streetscape elements. 11. Fencing restrictions and entry/streetscape landscape plans will be provided with final plans. 12. - 15. Land Development Services is providing the additional drainage information requested. The irrigation lateral will be enclosed according to the same requirements as were met for the same ditch in Clarendon Hills 2nd Filing. If further discussion on any of the above items please call. Reductions, color plans, and 10 seas of prints will be provided by December 11, 1989. Sincerely, Eldon Ward, President Cityscape Urban Design, Inc. Attachments cc: Gary Nordic, Nordic Construction and Development Dennis Donovan, Land Development Services Rob Persichitte, Intermill Land Surveying, Inc. • . <A i LOT 17 o Q I O � DRIVEWAY CUT }, AND LLJ LANDSCAPED I m BERMS DEFINE m PAVEMENT Q LOCATION PRIVATE REOAD PROVIDES SECONDARY ACCESS TO STREETS THAT EXCEED THE 660 FT MAXIMUM WITHOUT ALLOWING UNWANTED DAILY TRAFFIC. • s '� + o •`i � •r+y � y• • s`• w+t Y'�''+: h�. .• i I•• •� t'•, i .Y�*-\`Hh. Sr •I.: r �~ :� �S _tjr •�• •4 ROAD ALLOWS DOWNSTREAM USERS ACCESS TO IRRIGATION HEAD GATES NO TURNAROUND EXISTS AT THE END OF PARADISE LANE -• EXISTING GATE: DOUBLE -LOCKED TO ALLOW RESTRICTED ACCESS I THE ORCHARDS AT CIARENDON HILLS THE PRIVATE ROAR AND ADJACENT LANDSCAPING / WILL BE OWNED AND MAINTAINED BY THE HOMEOWNERS ASSOCIATON 1" =20