HomeMy WebLinkAbout4900 SOUTH COLLEGE AVENUE PDP, CHANGE OF USE - 3-06 - CORRESPONDENCE - (4)Easement. There is some possibility that the 20' access easement has already been
dedicated and the 10' trail easement is really on the property to the east. The
developer/consultants will need to research this further.
Number: 22 Created: 2/28/2006
[2/28/06] A sidewalk connection from the building out to Fairway must be provided.
Number: 25 Created: 2/28/2006
[2/28/06] Please dimension all parking stalls, driveway widths and drive aisles.
Number: 30
[2/28/06] Please show all utilities.
Created: 2/28/2006
Number: 39 Created: 3/1 /2006
[3/1/06] Please show all existing features within 150' of the project boundaries. Most
concerned with neighboring driveways (across the street, next door) and what's exisiting to
the north.
Number: 40 Created: 3/1/2006
[3/1/06] Parking setbacks of 20' or 40' off Fairway apply. Please see Detail 19-6 in
LCUASS. Rather than removing a parking stall, you have the option of striping it out, putting
your bike racks in it, etc.
Number: 42 Created: 3/2/2006
[3/2/06] The Transportation Development Review Fee for this project totals $5655. A check
for $2530 has been received therefor, an additional $3125 is due (.25 cents x 12,500 sf).
Please see the attached revised fee calc sheet.
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric
Number: 1 Created: 2/9/2006
[2/9/06] No comments, assuming there is no change in electric service requirements. If a
change is necessary, contact Light & Power Engineering at 221-6700.
Department: Natural Resources
Topic: General
Number: 41
[3/2/06] No issues.
Issue Contact: Doug Moore
Created: 3/2/2006
Department: PFA Issue Contact: Carle Dann
Topic: fire
Number: 27 Created: 2/28/2006
[2/28/06] A fire lane is required. This fire lane shall be visible by painting and signage, and
maintained unobstructed. A fire lane plan shall be submitted for approval prior to
installation. The fire lane shall be designated on the plat as an Emergency Access
Easement. The minimum required width shall be 20 feet throughout the length of the fire
lane. If a fire lane cannot be provided, the building shall be fire sprinklered.
Number: 28 Created: 2/28/2006
[2/28/06] Hydrant spacing and water flow must meet minimum requirements based on type
of occupancy. Spacing and flow requirements for commercial property are 1,500 gpm at 20
Page 2
dal„ STAFF PROJECT REVIEW
Citv of Fort Collins
VF RIPLEY ASSOCIATES, INC. Date: 03/03/2006
401 WEST MOUNTAIN AVE. SUITE 201
FORT COLLINS, CO 80524
Staff has reviewed your submittal for 4900 SOUTH COLLEGE AVENUE, CHANGE OF USE
- TYPE Il, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Shelby Sommer
Topic: General
Number: 8 Created: 2/10/2006
[2/10/06] Please show the 20' access easement on the site plan.
Number: 9 Created: 2/10/2006
[2/10/06] How much parking is provided for the car rental business? How much parking is
provided for each of the other 3 uses? Please differentiate on the site plan.
Number:.11 Created: 2/10/2006
[2/10/06] Contact me for the appropriate signature blocks to include on the site plan. Aerial
context diagram is unnecessary on stie plan, just keep the vicinity map.
Number: 12 Created: 2/10/2006
(2/10/06] West elevation should be enlarged to a legible scale.
Number: 32 Created: 2/28/2006
[2/28/06] Bonnie Ham (Post Office): Developer must provide appropriate mailboxes for
additional deliveries.
Number: 43 Created: 3/3/2006
[3/3/06] Bicycle parking need to be provided on site, equal to 5 percent of the total number
of automobile parking spaces.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 15 Created: 2/28/2006
(2/28/06] The City will not require any upgrades to the existing sidewalk along either the
frontage road or Fairway. This project will only have to replace and/replace any existing
damaged curb, gutter, ramp and/or sidewalk.
Number: 16 Created: 2/28/2006
[2/28/06] Please label and dimension all existing easements as "existing" and all proposed
easements as "proposed". Must provide legals and exhibits of all easements to be
dedicated with the next submittal along with a $250 processing fee for each dedication.
Larimer County filing fees are due prior to the actual filing of the dedications.
Number: 17 Created: 2/28/2006
[2/28/06] A 20' access easement along the east side of the property must be dedicated to
accommodate the future "rearage" road and it may not overlap the existing 10' Trail
Page 1
[2/9/06] In the response letter dated Feb 7, 2006, Comment 1 B it states that there is no
parking proposed in the development, yet the site/landscape plan clearly shows parking. 73
parking spaces.
Number: 3 Created: 2/9/2006
[2/9/06] What parking spaces will be used for auto display/storage and what spaces for
customer parking? Please note on the site plan.
Number: 4 Created: 2/9/2006
[2/9/06] 1 don't see a trash enclosure noted anywhere on the site plan. How will trash and
recyclables be handled?
Number: 5 Created: 2/9/2006
[2/9/06] Make note of the parking stall dimensions on the site plan.
Number: 6 Created: 2/9/2006
[2/9/06] NOTE: one of the handicap spaces needs to be van accessible: 16' overall width
with a sign at the head of the space denoting it as van accessible
Number: 7 Created: 2/9/2006
[2/9/06] Is there a fence along the east property line to screen the building and parking from
the adjacents properties? 3.2.1(E)(4)(b)
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely,
&lL (/Cw�
Shelby Sommer
Associate City Planner
Page 4
psi residual pressure, spaced not further than 300 feet to the building, on 600-foot centers
thereafter.
Number: 29 Created: 2/28/2006
[2/28/061 The proposed building exceeds 5,000 square feet for type V construction and
shall be fire contained or fire sprinklered.
Department: Traffic Operations Issue Contact: Eric Bracke
Topic: Traffic
Number: 14 Created: 2/15/2006
[2/15/06] No further traffic analyses is required. The projected use of the facility is similar to
the past use.
Department: Transportation Planning Issue Contact: Kurt Ravenschlag
Topic: General
Number: 33 Created: 2/28/2006
[2/28/06] The 10' trail easement shown on the site plan should not be located on the
property located at 4900 South College, but rather the property directly to the east.
Number: 34 Created: 2/28/2006
[2/28/06] A 20' Public Access Easement will be required for auto circulation from Fairway Ln
to the properties to the north per the South College Access Plan. The easement will need to
span from the south property line to the north property line. The existing drive aisle located
on the east side of the building can be used for this easement.
Number: 35 Created: 2/28/2006
[2/28/061 The existing sidewalk connections from the north parking area should align or
connect with the existing walkways on the east and west sides of building.
tuber' Created: 2/28/2006
/06] a located along the Frontage Rd. needs to be widened out to 6'.
Number: 37 Created: 2/28/2006
[2/28/06] Any sidewalks not located within public ROW should be placed in a Public Access
Easement.
Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamdan
Topic: Stormwater
Number: 38 Created: 3/1 /2006
[3/1/06] The original detention area did not have a water quality component. Since the
pond is already built and landscaped, no new detention will be required, however, it is
requested that the pond outlet, be modified to include a water quality plate and detention. A
variance will be approved to account for the water quality volume as being part of the
quantity volume.
Please provide water quality calculations.
Department: Zoning
Topic: ZONING
Number: 2
Issue Contact: Jenny Nuckols
Created: 2/9/2006
Page 3