HomeMy WebLinkAbout620 WEST PROSPECT ROAD BOARDING HOUSE - FDP - 51-05/A - SUBMITTAL DOCUMENTS - ROUND 1 - REVISIONSi. Jim Swanstrom; Great
Department: Stormwater-Water-Wastewaterlssue Contact: Glen Schlueter
Topic: Stormwater
Number: 24 Created: 10/10/2006
[10/10/06] It is not clear on the site plan how much "new" impervious area is being added. As
discussed at the conceptual review meeting, there is a fee for any new imperviousness over 350 sq.ft.
The fee is $3070.00/acre or $0.0705/sq.ft. for new imperviousness and no charge for existing
imperviousness. Please provide the "new" impervious area being added to your site plan. In the Old
Town Drainage basin, 5000 sq.ft of "new" imperviousness can be added to a site without providing a
drainage study or onsite detention. Normally a grading plan is required with an increase of 350 sq.ft
of new imperious area. However that requirement is being waived since the new impervious areas
are driveways and parking areas, not buildings. It is suggested the applicant make sure the new
impervious areas drain away from structures and out to the street, not onto neighboring properties.
The applicant could be liable if the increased runoff causes damage to others.
Jim Swanstrom; Note has been added that approximately 1050 sf of new impervious area has been
added for the 3 parking spaces and drive. Thank you for the additional imput.
I have attached all of the redlined plans.
If I understand the revision routing sheet correctly I am to hand in 3 copies of the
revised site plan.
If you need addition information I can be reached numbers noted above.
Sincerer yA urs
i,
./Swanstrom
'James R. Swansom PO Box 271516
Fort Collins
Colorado 80527
Home 970-225-0170
Cell 970-567-1327
October 26. 2007
Shelby Sommer
City Planner
City Of Fort Collins
Reference: 620 WEST PROSPECT ROAD BOARDING HOUSE PDP
Ms Sommer:
My Comments are below the copy of the staff comment
ISSUES:
Department: Current Planning Issue Contact: Shelby Sommer
Topic: General
Number: 26 Created: 10/18/2006
[10/18/06] This proposal is ready for a Type I (Administrative) Public Hearing. Steve Olt and I agree
that it makes the most sense to hold one public hearing for all six boarding house proposals. If the
proposal is approved at the public hearing, you will be required to address any remaining issues with
your final plan submittal.
Jim Swanstrom; Great and everything was approved in that meeting.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 23 Created: 10/10/2006
[10/10/06] Please add the same note to this project as you have on the 605 West Lake project
regarding the shed in the utility easement.
Jim Swanstrom; Note added
Number: 25 Created: 10/11 /2006
[10/11/06] Please remove the old sidewalk label and dimensions as it conflicts with the new correct
label you just added.
Jim Swanstrom; Note removed
Number: 21 Created: 6/23/2006
[10/10/06] The Final Compliance Fee has been reduced to $200 per the City Engineer.
[6/23/06] At the time of Final Compliance, a $1000 Transportation Development Review fee will be
owed to engineering.