A final fee of-St,-690-.00-is required at the time of submittal unless otherwise waived or reduced.
Fee Waiver/Reduction Approval: Amount: 15 Date: _
Planner: S. omnyr Engineer: Oto
Items Requested
Redlines
C
a
C
>
C
n
y
§
>
A
O
a
v,
d S
03
File: Project Plannerj.
Advance Planning
Building Inspection
Comcast
Engineering
2
Engineering Pavement
Forestry
GIS
Light & Power
Natural Resources
Neighborhood Services
w
Park Planning
Poudre Fire Authority
°
w
Post Office
Qwest
ROW Planning
Stormwater
1,
2
Street Oversizin
Technical Services
Traffic Operations
Transfort
Transportation Planning
Water & Wastewater /
Water District:
Water Conservation
Xcel Energy
Zoning
County Assessor
CDOT
ti
Ditch Co.:
Railroad:
z
REA/DOE/PRPA
Q
Schools: Poudre /
Thompson
TOTAL To be Submitted
buildings. It is suggested the applicant make sure the new impervious areas drain
away from structures and out to the street, not onto neighboring properties. The
applicant could be liable if the increased runoff causes damage to others.
Please be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6750.
Sincerely,
&IL RL�
Shelby mer
Associate City Planner
Page 2
c
City of Fort Collins
STAFF PROJECT REVIEW
JAMES SWANSTROM
400 CORMORANT CT
FORT COLLINS, CO 80525
Date: 10/18/2006
Staff has reviewed your submittal for 620 WEST PROSPECT ROAD BOARDING
HOUSE PDP, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Shelby Sommer
Topic: General
Number: 26 Created: 10/18/2006
[10/18/06] This proposal is ready for a Type I (Administrative) Public Hearing.
Steve Olt and I agree that it makes the most sense to hold one public hearing for all
six boarding house proposals. If the proposal is approved at the public hearing, you
will be required to address any remaining issues with your final plan submittal.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 23 Created: 10/10/2006
[10/10/06] Please add the same note to this project as you have on the 605 West
Lake project regarding the shed in the utility easement.
Number: 25 Created: 10/11 /2006
[10/11/06] Please remove the old sidewalk label and dimensions as it conflicts with
the new correct label you just added.
Number: 21 Created: 6/23/2006
[10/10/06] The Final Compliance Fee has been reduced to $200 per the City
Engineer.
[6/23/061 At the time of Final Compliance, a $1000 Transportation Development
Review fee will be owed to engineering.
Department: Stormwater-Water-Wastewaterlssue Contact: Glen Schlueter
Topic: Stormwater
Number: 24 Created: 10/10/2006
[10/10/06] It is not clear on the site plan how much "new" impervious area is being
added. As discussed at the conceptual review meeting, there is a fee for any new
imperviousness over 350 sq.ft. The fee is $3070.00/acre or $0.0705/sq.ft. for new
imperviousness and no charge for existing imperviousness. Please provide the
"new" impervious area being added to your site plan. In the Old Town Drainage
basin, 5000 sq.ft of "new" imperviousness can be added to a site without providing a
drainage study or onsite detention. Normally a grading plan is required with an
increase of 350 sq.ft of new imperious area. However that requirement is being
waived since the new impervious areas are driveways and parking areas, not
Page 1