Loading...
HomeMy WebLinkAbout638 WEST PROSPECT ROAD BOARDING HOUSE - PDP - 52-05 - CORRESPONDENCE -F 7AL PLAN ROUTING S- SET Item: �n�5F, W . -Yro Pec3- 13ODCO; ivQ HO osP This project went to / has been'scheduled for Public 116ring on The following table lists final plan submittal requirements for this project. A final fee of S4;89@:0ff i required at the time of submittal unless otherwise waived or reduced. Fee Waiver/Reduction Approval: Amount: ,S2D D Date: _ Planner: S.So�nrn,e r Engineer: S. uo A" Items Requested Redlines ti N a o > c o v a ? o r a r c �z Q G a / `v^\ File: Project Planner 7 Advance Planning Building Inspection Comcast Engineering 1 7., 2 l l Engineering Pavement Forestry GIS Light & Power Natural Resources Neighborhood Services C4 Park Planning Poudre Fire Authority ° 0. Post Office Qwest Q ROW Planning Stormwater 2 Street Oversizin Technical Services Traffic Operations Transfort Transportation Planning Water & Wastewater / Water District: Water Conservation Xcel Energy Zoning County Assessor CDOT Ditch Co.: Railroad: z REA/DOE/PRPA Q Schools: Poudre / Thompson TOTAL To be Submitted 3 3 2 J away from structures and out to the street, not onto neighboring properties. The applicant could be liable if the increased runoff causes damage to others. Please be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely, 3416gR V— Shelby Sommer Associate City Planner Page 3 Number: 27 Created: 6/23/2006 [10/3/06] The Final Compliance Fee has been reduced to $200 per the City Engineer. [6/23/06] At the time of Final Compliance, a $1000 Transportation Development Review fee will be owed to engineering. Department: Engineering Topic: Plat Number: 30 [10/11/06] From Technical Services: Issue Contact: Susan Joy Created: 10/11 /2006 Boundary and legal close. Number: 31 Created: 10/11 /2006 [10/11/06] From Technical Services: How was Prospect dedicated? Is the term "re- dedicated proper in this case? From Susan Joy: No, it would not be, please remove that sentence. Needs to show how it was dedicated originally. Number: 32 Created: 10/11 /2006 [10/11/06] From Technical Services: Addition ROW needed? What about easements? From Susan Joy: This development is responsible for dedicating an additional 21' of row for its half of a constrained arterial. No utility easement is required. Number: 33 Created: 10/11 /2006 [10/11/06] From Technical Services: Need to see the final plat. Number: 34 Created: 10/11 /2006 [10/11/06] Please email me at sjoy@fcgov.com for the current plat language. Number: 35 Created: 10/11 /2006 [10/11/06) Please remove the word "preliminary' from the plat title. Department: Stormwater-Water-Wastewaterlssue Contact: Glen Schlueter Topic: Stormwater Number: 29 Created: 10/10/2006 [10/10/06] It is not clear on the site plan how much "new" impervious area is being added. As discussed at the conceptual review meeting, there is a fee for any new imperviousness over 350 sq.ft. The fee is $3070.00/acre or $0.0705/sq.ft. for new imperviousness and no charge for existing imperviousness. Please provide the "new" impervious area being added to your site plan. In the Old Town Drainage basin, 5000 sq.ft of "new" imperviousness can be added to a site without providing a drainage study or onsite detention. Normally a grading plan is required with an increase of 350 sq.ft of new imperious area. However that requirement is being waived since the new impervious areas are driveways and parking areas, not buildings. It is suggested the applicant make sure the new impervious areas drain Page 2 STAFF PROJECT REVIEW JAMES SWANSTROM 400 CORMORANT CT FORT COLLINS, CO 80525 Date: 10/18/2006 Staff has reviewed your submittal for 638 WEST PROSPECT ROAD BOARDING HOUSE PDP, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Shelby Sommer Topic: General Number: 36 Created: 10/18/2006 This proposal is ready for a Type I (Administrative) Public Hearing. Steve Olt and I agree that it makes the most sense to hold one public hearing for all six boarding house proposals. If the proposal is approved at the public hearing, you will be required to address any remaining issues with your final plan submittal. Department: Engineering Issue Contact: Susan Joy Topic: General Number: 28 Created: 10/10/2006 [10/10/06] The parking lot does not work (cars can't back out without going onto the grass). Either rotate the stalls 90 degrees or increase the parking lot to include a drive aisle and room to back out. Number: 4 Created: 11 /29/2005 [10/10/06] Please remove the incorrect sidewalk label and dimension as it conflicts with the new & correct label. [6/9/06] dimension sidewalk (not concrete) and driveway opening: repeat. [11/29/05] Dimension and label existing ROW, sidewalk width, and driveway opening. Number: 10 Created: 12/1 /2005 [10/10/06] Please show, label and dimension the existing easement discussed below. [6/9/06] There is an existing 5' by 10' utility easement on the SE comer of the property for the electric transformer. Please include this on the plat. In addition, any other exsiting easements must be shown on the plat. [12/1/05] Show utilities on plan. When platting, we would need appropriate easements dedicated to accommodate them. Number: 25 Created:. 6/15/2006 [10/3/06] Repeat comment. Please see Figure 16-1 of LCUASS for this and other requirements. [6/15/06] The low rock wall on the property must be moved a minimum of 2' back from the edge of the sidewalk. Page I