Loading...
HomeMy WebLinkAboutNORTHSIDE AZTLAN COMMUNITY CENTER - PDP - 54-05 - REPORTS - RECOMMENDATION/REPORTNorthside Aztlan Community Center Project Development Plan — Type I (# 54-05) May 18, 2006 Planning and Zoning Board Hearing Page 8 STAFF RECOMMENDATION: Staff recommends approval of the Northside Aztlan Community Center Project Development Plan — Type I (# 54-05). Attachments: Zoning exhibit Transportation Impact Study dated December, 2005 Statement of Planning Objectives Notes from the Community Open House held on October 27, 2005 11" x 17" rendered perspective Full sized plan set Northside Aztlan Community Center Project Development Plan — Type I (# 54-05) May 18, 2006 Planning and Zoning Board Hearing Page 7 street design that is being designed is likely to increase the width of the right-of-way, which will reduce the distance from the street to the building. Given the community -wide appeal of this facility, a generous plaza area has been created in the front of the building with both formal and informal landscape areas and amenities such as benches and seatwalls. The proposed plaza provides rationale for an exception to the build -to line standard as afforded under Section 3.5.3(B)(2)(d). [Section 3.5.3(B)(2)] j. The large masses inherent in such a project have been designed with numerous changes in height and numerous projecting and recessed elements. Changes are related to entrances and functions of the internal spaces. [Section 3.5.3(C)] k. The proposed project contributes substantially to the uniqueness of the Public Open Lands zone district and sets a high bar for future projects in the area. [Section 3.5.3(D)(1)] I. All facades exceed the minimum wall articulations. Walls have clearly defined bays, multiple changes in plane, materials and texture, and well articulated fenestration. All sides of each building have high quality materials. The building entrances are recessed into the building mass within an arcade. The building has been designed with appropriate base and top treatments including soldier course brick topped split faced CMU bases and cornices and a pitched metal roof. The large gym volume has an acceptable base and top and scoring in the stucco finish. It will be screened with dense stands of coniferous trees. 4. Findings of Fact / Conclusion: A. Recreation facilities such as the proposed are permitted in the POL — Public Open Lands District, subject to an Administrative Hearing. B. This Project Development Plan complies with the applicable Administrative and General Development standards and the standards of the POL — Public Open Lands District. Northside Aztlan Community Center Project Development Plan —Type I (# 54-05) May 18, 2006 Planning and Zoning Board Hearing Page 6 coniferous trees are planted to minimize the effect of the mass and screen the elevation of the building. [Section 3.5.1 (C)] c. The proposed building colors are compatible with this section of the Old Town area. [Section 3.5.1 fl] d. A small portion of the proposed building exceeds 40 feet (as indicated on the elevations) so it is subject to the special height review. The shadows cast by the proposed project do not spill beyond its property boundaries. Views of the foothills are not affected by the small portion of the building that is over 40 feet, since the foothills are not visible above and beyond the remainder of the building. Precautions have been taken to screen mechanical equipment and windows from potential future residential uses to the east. [Section 3.5.1 (G)] e. All outdoor storage and mechanical equipment has been incorporated into the overall design of the project and screened with materials that are of the same quality as the rest of the building. [Section 3.5.1 (1)] f. The future operations of this facility do not appear to have negative impacts on surrounding uses. The location of the pick-up and drop- off area, while not ideal, seems to be the best possible location for a number of reasons having to do with existing site configuration, safety, streetscape quality and convenience. Staff spent considerable time with the design team to consider its placement and effectiveness and is satisfied that this is the best solution. [Section 3.5.1 (J)] g. The design team has crafted a proposal for a large-scale program that meets the intent of the Mixed -use, Institutional and Commercial Building standards in Section 3.5.3. The design is human -scaled and succeeds in providing a very attractive and appropriate street front and a clear, well-defined, pedestrian and bike friendly circulation system, while also accommodating vehicular movements. [Section 3.5.3] h. The existing public sidewalk and soon to be designed public sidewalk connect with the main entrances without crossing a drive aisle. [Section 3.5.3(B)(1)] i. Given the unusual configuration of the site, the scale of the program to be accommodated in the building, and the constraint of scheduling construction to allow for uninterrupted service with the existing facility, it was not possible for the proposed project to meet the build - to lines to the letter of the law. The proposed project meets the intent of the standard and is a great improvement from the existing facility in that it fronts the street and provides pedestrian friendly access with no vehicle use between the building front and the street. The building is between 25 and 80 feet from the existing street. The Northside Aztlan Community Center Project Development Plan — Type I (# 54-05) May 18, 2006 Planning and Zoning Board Hearing Page 5 effort and coordination with City staff resulted in an arrangement that is well-defined, safe and convenient. [Section 3.2.2 (E)] g. Section 3.2.2 (K)(1)(g) states the minimum parking requirement for recreational uses located in residential districts. Since the subject site is not in a residential district, this standard does not apply. The parking requirements for other non-residential uses are a maximum. The use that most closely resembles the proposed use in the table in Section 3.2.2 (K)(2)(a) is 'limited indoor recreation' which stipulates a maximum of 6 spaces per 1000 square feet of floor area. The proposed plan complies with this standard: the proposed floor area is 37, 618 square feet. 178 parking spaces are provided, which is fewer.than the 225 space maximum. [Section 3.2.2 (K)] h. Handicap parking spaces are provided according to Code. [Section 3.2.2 (K)(5)(d)] i. The parking dimensions indicated on the plans meet the minimum dimensions required. All spaces are dimensioned as standard spaces with an allowed 2-foot overhang into adjacent landscaping. [Section 3.2.2 (L)] j. Interior parking lot landscaping exceeds the 10% minimum required. k. Site lighting meets City standards and conforms to stringent LEED certification standards. Light sources are concealed and feature full shielding and sharp cutoff (full cutoff) to minimize glare. [Section 3.2.4] I. The trash enclosure has been sized to accommodate trash and recyclables. The trash and recycling areas are sufficiently screened from view. [Section 3.2.5] 3) Building Standards — Division 3.5 a. The design of the project is based on local and historic cues such as industrial landmarks along the river and other City recreation facilities. The proposed building incorporates brick and more industrially-themed metal accents compatible with existing sites such as the Old Power plant and neighboring Bas Bleu Theatre/Old Giddings factory which was recently redeveloped. It is also identifiably a City recreation facility in that it echoes the high level of construction and design quality and environmentally -sensitive qualities of other City recreation facilities such as EPIC and the Senior Center. [Section 3.5.1 (B)] b. The proposed recreation facility is by nature quite large. It has been sensitively designed with articulation in the roof forms, massing and facade treatment to appear appropriately scaled for this location, especially from Willow Street. Where it was not possible to break the .mass up, notably the gym on the north side, dense stands of Northside Aztlan Community Center Project Development Plan — Type I (# 54-05) May 18, 2006 Planning and Zoning Board Hearing Page 4 the building. On the east side of the building, the plantings are pulled out from the building to accommodate the connecting walkway, and to provide morning shade for the walkway. [Section 3.2.1(E)(2)] e. The landscaping plan incorporates many water conservation methods including use of bio-swales and plants that are drought - tolerant and/or native. The project team is working to achieve Silver LEED certification and has exceeded our minimum standards in this area. [Section 3.2.1(E)(3)] f. The parking lot perimeter has more than the minimum required trees. The parking lot interior contains more than 10% landscaping as required by code. All islands, connecting walkways and drives are fully lined with shade trees. Sight distance triangles are maintained at all driveway intersections. All landscape islands exceed minimum dimensions and planting requirements and are edged with raised concrete curbs. Parking bays extend no farther than 15 spaces without a tree and/or landscaped area [Sections 3.2.1(E)(4) and (5)] 2) Access, Circulation and Parking [Section 3.2.2] a. The safety of pedestrians, especially where they cross the drive aisles have been enhanced with special paving, frequent pedestrian refuges and an allee of trees. [Section 3.2.2 (C)(1)(a) and (5)(b)] b. Curb cuts and ramps are provided throughout the site. [Section 3.2.2 (C)(2)l c. The design includes convenient parking facilities for bicyclists in excess of required minimums. [Section 3.2.2 (C)(4)] d. The parking lot incorporates a ten -foot wide central organizing pedestrian walkway that connects the skate park, handball courts and outlying parking with the entrances to the main building. Wide feeder walkways connect the outdoor basketball court and Poudre bike trail to the main north -south walkway. This system creates a recognizable, safe and convenient pedestrian network while minimizing the need for pavement to meet LEED requirements. [Section 3.2.2 (D)] There are convenient walkways on either side of the main drive aisle into the site from Willow. [Section 3.2.2 (C)(5)] e. The bicycle circulation network through the site is clear, convenient and anticipates users' needs. The network connects in a logical and practical way with the Poudre Trail. There is convenient bike parking located at the intersection of the Trail spur with the pedestrian network and there is generous bike parking at the skate park/handball court and at the entrance to the main facility. [Section 3.2.2(C)(6)] f. The parking lot is laid out clearly. The size and configuration of the site prevents a perpendicular parking scheme but a focused design Northside Aztlan Community Center Project Development Plan — Type I (# 54-05) May 18, 2006 Planning and Zoning Board Hearing Page 3 The proposed project will be a City owned and operated facility that serves the entire community with resources for recreation, sports and other community activities. There will be indoor and outdoor basketball courts, classrooms, a.weight room, handball courts, and a skate park among other amenities. B. Permitted Land Use: 'Parks, recreation and open lands' is a permitted use in the POL—Public Open Lands zone district subject to a Type I — Administrative Hearing. The Northside Aztlan Center is a City -owned parks and recreation facility described in the Parks and Recreation Policy Plan. 'Parks, recreation and open lands' is a defined term in the Land Use code: Parks, recreation and open lands shall mean natural areas as described in the Natural Areas Policy Plan, parks and recreation facilities as described in the Parks and Recreation Policy Plan whether such facilities are owned or operated by the city or by another not -for -profit organization, environmental interpretation facilities, outdoor environmental research or education facilities, or public outdoor places. 3. Compliance with applicable General Development Standards A. Site Planning and Design Standards [Division 3.2] 1) Landscaping and Tree Protection: [Section 3.2.1] a. The PDP provides full tree stocking and landscaping throughout the project. Shade trees are used throughout to provide canopy, minimize glare and to enhance the outdoor spaces. [Section 3.2.1(D)(1)] b. Street trees along Willow will be built with the Downtown River District Improvement District, a capital improvement project that commenced design work in the fall of 2005. Street trees will be placed at 30-40 foot intervals in accordance with that approved design. [Section 3.2.1(D)(2)] c. Sufficient screening is provided from the river and adjacent uses. Densely planted coniferous trees were added along the north side of the gym to provide screening of the massive gym volume from the river. [Section 3.2.1(E)] d. All non -paved areas are planted with appropriate plantings including extensive use of native species. Foundation plantings are provided along more than 50% of the high -use and high visibility facades of r_. , t , Northside Aztlan Community Center Project Development Plan — Type I (# 54-05) May 18, 2006 Planning and Zoning Board Hearing Page 2 COMMENTS 1. Background The surrounding zoning and land uses are as follows: N and NW: POL—Public Open Lands (Railroad right-of-way with existing City -owned Old Power plant beyond); W: POL — Public Open Lands (Vacant land) with CCR—Community Commercial — Poudre River District (existing commercial) beyond; SW and SE: RDR—River Downtown Redevelopment District Existing commercial (Schrader's), vacant land, and existing commercial (Bas Bleu Theatre), with existing commercial and vacant land beyond; E and NE: POL—Public Open Lands (Legacy Park, existing United Way facility and Gustav Swanson Natural Area) with E—Employment (existing Linden Tech Center). The property at 112 East Willow Street contains the existing Northside Aztlan Center, which opened in August of 1978 and was funded with a HUD grant. The City of Fort Collins owns the property and operates the center. The new facility is funded by BCC -- Building Community Choices, a sales -tax based capital projects budget which was approved by voters in 1997. The design team that is designing and constructing the new Center was chosen through a City Request for Proposals (RFP) process. The design team is working to achieve Silver Certification through the LEED environmental program. There will be continuous service for patrons of the community center so the construction of the new building will be carefully orchestrated to allow the existing facility to be used throughout construction. Once the new facility is complete, the old facility will be demolished and the remainder of the site plan will be finished. A neighborhood meeting was not required for this project, but since the project impacts the entire community, the City opted to hold an open house on October 27th, 2005. Notes from the open house are attached. 2. Compliance with Applicable POL—Public Open Lands District Standards A. Purpose: The purpose of the POL District is as follows: The Public Open Lands District is for large publicly owned parks and open lands which have a community -wide emphasis or other characteristics which warrant inclusion under this separate designation rather than inclusion in an adjoining neighborhood or other District designation. ITEM NO. MEETING DATE Ao STAFF e 3 Citv of Fort Collins HEARING OFFICER STAFF REPORT PROJECT: Northside Aztlan Community Center Project Development Plan — Type I (# 54-05) APPLICANT: Earen Russell EDAW 240 E. Mountain Ave. Fort Collins, CO 80524 OWNER: City of Fort Collins Attn. Steve Seefeld 117 N. Mason Street Fort Collins, CO 80522 PROJECT DESCRIPTION: This is a request to construct an enlarged, updated and enhanced Northside Aztlan Community Center on the existing Northside Aztlan Community Center site and then to demolish the existing building. The property is located on the northeast side of Willow St. just east of College in the POL — Public Open Lands District. RECOMMENDATION: Staff recommends approval of Northside Aztlan Community Center Project Development Plan — Type I (# 54-05). EXECUTIVE SUMMARY: Recreation facilities such as the proposed are permitted in the POL — Public Open Lands District, subject to an Administrative Hearing. This Project Development Plan complies with the applicable Administrative and General Development standards and the standards of the POL — Public Open Lands District. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO.80522-0580 (970) 221-6750 PLANNING DEPARTMENT