HomeMy WebLinkAboutSEVEN GENERATIONS (FORMERLY EASTBROOK) OFFICE PARK - PDP - 4-06 - REPORTS - RECOMMENDATION/REPORTEastbrook Office Park, PDP - #4-06
May 11, 2006 Administrative Hearing
Page 6
2. The Project Development Plan complies with all applicable district
standards of Division 4.22 - E District of the Land Use Code.
3. The Project Development Plan complies with all applicable General
Development Standards contained in Article 3 of the Land Use Code.
RECOMMENDATION:
Staff recommends approval of the Eastbrook Office Park, Project Development
Plan - #4-06.
2
Eastbrook Office Park, PDP - #4-06
May 11, 2006 Administrative Hearing
Page 5
a. The proposal complies with Section 3.5.1(B) in that this new
development is considered to be compatible with the
established architectural character of the existing developed
areas surrounding this property. Building materials will be a
combination of brick and stucco siding. The materials are found
on existing non-residential buildings to the south and east of this
property.
b. The proposal complies with Section 3.5.1(C). The proposed flat -
roofed buildings will be 1-story and 2-story structures with a flat
roof. The 1-story portions of the buildings will be 22' in height
and the 2-story portions of the buildings will be 36' in height. The
height, size, scale, and mass of these proposed buildings are
found on existing non-residential buildings to the south and east
of this property.
2. Section 3.5:3, Mixed Use, Institutional and Commercial Buildings
a. The proposal complies with Section 3.5.3(B)(1) in that the
buildings each have at least 1 main entrance facing and
opening directly onto a connecting walkway with the pedestrian
frontage along Eastbrook Drive.
b. The proposal complies with Section 3.5.3(B)(2)(b) in that the
east faces of the two buildings fronting on Eastbrook Drive are
set back 12' to 15' from the right-of-way line for Eastbrook Drive,
being smaller than a full arterial street.
4. Neighborhood Information Meeting
The Eastbrook, PDP contains a proposed land use that is permitted as a
Type 1 use, subject to an administrative review. The proposed use is
office, and it constitutes an infill development in the general proximity of
existing business, commercial, industrial, and office uses. The LUC does
not require that a neighborhood meeting be held for a Type 1 development
proposal and a neighborhood meeting was not held to discuss this
proposal.
FINDINGS OF FACT/CONCLUSIONS
After reviewing the Eastbrook Office Park, Project Development Plan, staff
makes the following findings of fact and conclusions:
1. The proposed office use is permitted in the E - Employment District.
5
Eastbrook Office Park, PDP - #4-06
May 11, 2006 Administrative Hearing
Page 4
f. The proposal complies with Section 3.2.1(E)(5) in that it
exceeds the minimum requirement of 10% of interior parking lot
landscaping.
2. Section 3.2.2, Access, Circulation and Parking
a. The proposal complies with Section 3.2.2(C)(4)(a) in that it
provides secure and conveniently located bicycle parking, near
the main entries to the buildings, in the amount of 7% of the
total number of automobile parking spaces on -site, exceeding
the minimum requirement of 5%.
b. The proposal complies with Section 3.2.2(C)(5) in that it
provides direct, safe, and continuous walkways and bicycle
connections to major pedestrian and bicycle destinations in the
surrounding area.
c. The proposal complies with Section 3.2.2(D) in that it provides
for safe, convenient, and efficient bicycle, pedestrian, and
vehicular movement to and through the site. Vehicular access
will occur via curb cuts from Eastbrook Drive, with a continuous
driveway between the two points of access.
d. The proposal complies with Section 3.2.2(K)(2)(a) in that the
project will provide 138 parking spaces on -site, which satisfies
the maximum number of spaces allowed for the total square
footage contained in the 4 office buildings.
B. Division 3.3, Engineering Standards
1. Section 3.3.5, Engineering Design Standards
The proposal complies with the design standards, requirements,
and specifications for the services as set forth in this section.
C. Division 3.4, Environmental, Natural Area, Recreational and
Cultural Resource Protection Standards
The proposal satisfies the applicable standards in this division of
the LUC.
D. Division 3.5, Building Standards
1. Section 3.5.1, Building and Project Compatibility
4
Eastbrook Office Park, PDP - #4-06
May 11, 2006 Administrative Hearing
Page 3
2. Division 4.22 of the Land Use Code, Employment Zone District
The proposed office use is permitted in the E District subject to an
administrative (Type 1) review.
The PDP meets all applicable Development Standards in Section 4.22(E).
The applicant has demonstrated that the development plan contributes to
the existing developments in the surrounding area in terms of building
siting, size, and character, and site design.
3. Article 3 of the Land Use Code — General Development Standards
The Project Development Plan complies with all applicable General
Development Standards as follows:
A. Division 3.2, Site Planning and Design Standards
1. Section 3.2.1, Landscaping and Tree Protection
a. The proposal complies with Section 3.2.1(D)(1)(c) in that it
provides "full tree stocking" within 50' of the building, according
to the standards as set forth in this section.
b. The proposal complies with Section 3.2.1(D)(2)(a) in that
canopy shade (street) trees are provided at a 40' spacing along
Eastbrook Drive behind the attached sidewalk.
c. The proposal complies with Section 3.2.1(D)(3) in that no one
species of tree on the development plan will exceed 15% of the
total of 62 trees on -site.
d. The proposal complies with Section 3.2.1(E)(4)(a) in that trees
are provided at a ratio that is 1 tree per 35 lineal feet along the
south property line and 1 tree per 28 lineal feet along the north
property, exceeding the required 40 lineal feet along the side lot
lines in the parking lot setbacks.
e. The proposal complies with Section 3.2.1(E)(4)(b) in that the on -
site parking areas will be screened from the vacant property and
single-family neighborhood to the north and the existing office /
industrial use to the south with shrub plantings and evergreen
trees that will block at least 75% of the vehicle headlights and
extend along at least 70% of the property lines along the
parking area.
3
Eastbrook Office Park, PDP - #4-06
May 11, 2006 Administrative Hearing
Page 2
* standards located in Division 4.22 Employment (E) of ARTICLE 4 —
DISTRICTS.
Office uses are permitted in the E — Employment District, subject to
administrative (Type 1) review. The purpose of the E District is:
Intended to provide locations for a variety of workplaces including light
industrial uses, research and development activities, offices and
institutions. This District also is intended to accommodate secondary uses
that complement or support the primary workplace uses, such as hotels,
restaurants, convenience shopping, child care and housing.
Additionally, the Employment District is intended to encourage the
development of planned office and business parks; to promote excellence
in the design and construction of buildings, outdoor spaces, transportation
facilities and streetscapes; to direct the development of workplaces
consistent with the availability of public facilities and services; and to
continue the vitality and quality of life in adjacent residential
neighborhoods.
This proposal complies with the purpose of the E District as it provides a
workplace for office uses in an existing office / business / industrial park setting.
This new office park development will utilize existing utilities and services in the
area.
COMMENTS:
Background
The surrounding zoning and land uses are as follows:
N: E, RL; vacant land, existing single-family residential
S: E; existing office & industrial
E: E; vacant land, existing office & industrial
W: E, RL; existing railroad, single-family residential
The property was annexed in June, 1977, as part of the Nelson Second
Annexation.
The property was platted in August, 1980, as Lot 2 and part of Lot 4 of the
New Hampshire Subdivision.
No development plan has previously been reviewed and approved for this
property.
2
ITEM NO. r�
MEETING DATE G
STAFF CL+
Citv of Fort Collins HEARING OFFICER
STAFF REPORT
PROJECT: Eastbrook Office Park, Project Development Plan - #4-06
APPLICANT: VF Ripley Associates, Inc.
c/o L. Joanna Frye
401 West Mountain Avenue, Suite 201
Fort Collins, CO. 80521
OWNER: Sitzman Investments, LLLP
3500 JFK Parkway
Fort Collins, CO. 80525
PROJECT DESCRIPTION:
This is a request for a total of 46,000 square feet of office space in four buildings
(ranging from 10,960 to 12,388 square feet per building). The buildings will be a
combination of one story and two stories, 22' to 36' in height. There will be 138
parking spaces provided on -site for the office space and vehicular access will be
via 2 driveways into the site from Eastbrook Drive. The property is at the
southwest corner of Eastbrook Drive and Vermont Drive and is in the E —
Employment Zoning District.
RECOMMENDATION: Approval
EXECUTIVE SUMMARY:
This PDP complies with the applicable requirements of the Land Use Code
L( UC), more specifically:
the process located in Division 2.2 - Common Development Review
Procedures for Development Applications of ARTICLE 2 -
ADMINISTRATION;
standards located in Division 3.2 - Site Planning and Design
Standards, Division 3.3 - Engineering Standards, Division 3.4 -
Environmental, Natural Area, Recreational and Cultural Resource
Protection Standards, and Division 3.5 - Building Standards of
ARTICLE 3 - GENERAL DEVELOPMENT STANDARDS; and