HomeMy WebLinkAboutUPTOWN PLAZA - PDP - PDP130025 - REPORTS - DRAINAGE REPORTConclusions This design and the accompanying plan is in compliance with the City of Fort Collins storm drainage requirements,, and provides sufficient drainage control to mitigate any effects to downstream sites. Sufficient detention has been provided onsite- to reduce total 300 yr developed runoff to the 2'yr'historic rate. Street should be included in our report. However, we. are ln requesting a ,.variance from City requirements since this roadway' l was constructed before this.PUD was assembled, and thereforeshas already been incorporated into other studys. Additionally, we feel that in making the drainage work for this site, without..ahe,,.- additional street area, we have already maximized detention Runoff will be as follows: runoff from subbasin A (10`yr:' 1.06 cfs, 100. yr: 1.80 cfs) will be detained in a detention pond' (645 cu ft) located in the paved drive on the north side._then will discharge at a reduced rate 0.-8 cfs) into a second'pond located. in the landscaped area to the south. Runoff -.from subbasin C (10 yr: .1.31 cfs, 100 yr: 2.21 cfs) will be °detained by a pond (1019 cu ft) again located in a drive, and also will also discharge at a reduced rate o.5 cfs) into the south "•.! detention pond.. Runoff from subbas:iL.I�will.not be detained... but.':.. - will be directed to a trench drain at the southeast entrance .and in turn into the south'pond. Flow-from'D into the pond will be 0 70:cfs for the 10 yr storm and .18 for the 100 yr storm. Since the south pond 3s locat within subbasin E, runoff frorq subbas' n E (10 yr 0:.30 cf.s, 100 yr: 0.57'cfs)-too will .be. -_ _ detained in: this pond.. Spillage from the c wash will hot be directed: into the .sanitary. system, but will be routed through : trench drains and into the pond. } - t0 g3f , t + _ Total 10.0 yr.,flow into the south.pond, will be 3.10 cfs... Pond.. volume will be 6994.cu ft. Discharge will be ;through a. 3 3/.16 inch orifice which will allow a 100. yr release of. 0.-42 cfs.. This flow will be channeled into an existing 12" storm sewer on West 'Elizabeth the capacity of which is 4.07.cfs.- .Runoff from subbasin F will flow undetained`,from the site at C re leas C- a 10.0; yr: rate of 0.35 'cfs.. Total 100 yr developed << i%al o.9£ will thus. be 0.71 „cfs which compares favorably with the two year tip' historic rate of, .7: cfs: Flow from the east landscaped area onto the adjacent site to the.. east.'.will..be' .087 x .20 x 4.00 .07 cfs (AxCxI) for the; 10 year`itorm.and .087 x .'25 x 6.40 = .14 cfs for the 100. This.` represents a substantial reduction from the existing since the ' �r� z o `• hispnofficial copy was downloaded on Aug_l9 2013 from theCity of Fort ColhnstPublw Records Webstte http //c�tydocs fcgov,com`. !. ocaiiddwnalinforinaz�onoranwffictalco�` lease_contact,Ci ofEoitC6lliiis°Utihlles,700'WoolffireetF{ortColhns;GO80524:USA- :nz PY. p ty - General Location..and_Description The site is located on the south side of Elizabeth Street, just west of -Shields and contains 1.465 acres. It is part of Taco Bell to the west `' ..,:Fairvew.'Shoppng Center. with an existing. , a laundry ,mat and restaurant to the east, and:vacant property to the`southc. Planned for this site is'a'Diamond Shamrock service station, convenience store and car wash. Drainage Design Criteria This drainage stddy'has been prepared using. the...Rati'onal Method since thesite is less thai 200 acres. Calculations have. been performed for the ,2, 10 and lob year stormDeveloped flows.:_ p from the site has been _;limited to 'the. two year,historic rate. Drainage Facility_ Design The site has been divided into five subbasinss A, C', D, E, and F. All subbasinsp,except. for F, drain to detention ponds located in three areas on the:. site. Total release has been limited to the two year historic rate. 'Subbasins A, C and D'encompass'almost a11. the paved area of. the site .in addition to the store.. ar id, subbasin E.contains :i the car'wash and most of 'the landscaping including the large detentionpond to the south, and subbasin F represents the remainder'or.mostly landscaped fringes to the north and east`of the property., According'to city requirements, the south half of Elizabeth 16MO l CO downloaded on Aug ]9 2013 froFn the C�ryyof Fort Collins Pu6he Recoiils,Wabsite http llcfrydocs fcgov comma Y.-r ` :, piei» && ' s 'd w, mAre �ln Pfi r a ,a ^ as* litional"information or an official copy, please;conlact City,oFF,ort �ollms UniiGes,700pWootl Sireet FortColluis, CO SQ52,4:USA Prepared For: "Diamond Shamrock Refining And -.:Marketing Company 520 E. 56th Avenue Denver,.Colorado '80216 Attn: Ed Kress. Prepared',By Gallocsay, Romero and Associates, Inc. 12449 E. 39th Avenue Denver,.Colorado 80239 Attn- Roger Barrin'gerIV BORING LOG NO. DP-2 Page 1 of 1 PROJECT: Uptown Plaza CLIENT: D.K. Investments, Inc. Windsor, Colorado SITE: 1501 West Elizabeth Street Fort Collins, Colorado 00 ee LOCATION S6dtibK A-2 W z wa w e c ATTERBERG LIMITS w .., >O r rnN E e •� Ho z U Latitude: 40.573629' Longitude:-105.103103° `. Q W w w Z o. W w W 0- w w ¢ 3 3 Z LL-PL-PI w Approximate Surface Elev: 5034.85 (FL)+/- ❑ 3 m LL nt N 00 ❑ 3 w O y o. PTH ELEVATION Ft y SANDY LEAN CLAY, dark brown 3.0 5032+/ Boring Terminated at 3 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Advancement Method: See Exhibit A-3 for description of field Notes: 34nch hand auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Slotted PVC pipe vrith filter sand pack abbreviations. WATER LEVEL OBSERVATIONS 1 terra con Boring Started: 6/20/2013 Boring Completed: 6/20/2013 -Si-7While drilling Drill Rig: Hand auger Driller. Bryce Johnson 1901 Sharp Point Drive, Suite C Fort Collins, Colorado lProject No.: 20135023 Exhibit: A-11 BORING LOG NO. DP-1 Page 1 of 1 PROJECT: Uptown Plaza CLIENT: D.K. Investments, Inc. Windsor, Colorado SITE: 1501 West Elizabeth Street Fort Collins, Colorado LOCATION SeeExhbitA-2 wZ U SO 0 V >O E �ATTERBRG Wm z g Latitude:40.573953° Longitude:-105.103496' S Q W m w Z z F Z u = a o:> 7 W 3 3 z >x s 0 LL-PL-PI z Approximate Surface Elev: 5038.95 (Ft.) +/- o ¢ m ¢ LL nt m O U o 3 cWi w DEPTH ELEVATION O m m Q. R1 I - LEAN CLAY with SAND and GRAVEL, brown to dark brown 3.0 5036+/ Boring Terminates/ at 3 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Advancement Method: See Exhibit A-3 for description of field Notes: 44nch solid -stem flight augers procedures. See Appendix B for description of laboratory procedures and additional data (f any). See Appendix C for explanation of symbols and Abandonment Med)od: Slotted PVC pipe with filter sand pack. abbreviations. WATER LEVEL OBSERVATIONS �erra Co■ ■ 1901 Sharp Point Drive, Suite C Boring Started: 6/20/2013 Boring Completed: 6/20/2013 No free water observed while drilling. Drill Rig: CME-45 Driller. Odell Drilling, Inc. - Fort Collins. Colorado Project No.: 20135023 Exhibit: A-10 LEVEL 10 ONE WA-1 00 APPROXIMATE SCALE 1 + Approximate Boring Location 01 20' 40' 4 Approximate Field Hydraulic ConductiAty Location DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT A& Approximate Location of Temporary Benchmark INTENDED FOR CONSTRUCTION PURPOSES (Top Man Hole Lid —Elevation 5,041.2') ProjectManager. Project No, EDEI 2 135023 BORING LOCATION PLAN EXHIBIT Drawn By: BCJ Scale; 1 0 1rerracon Uptown Plaza Check By: EDB FtleNarne: Comulting I Enginmm & Scientists 1501 West Elizabeth Street A-2 App-,ed By: Dam: �d EDB 6/20/2013 F. MM Fort Collins, Colorado APPENDIX A FIELD EXPLORATION Geotechnical Engineering Report 1 f�rr�con Uptown Plaza ■ Fort Collins, Colorado July 24, 2013 ■ Terracon Project No. 20135023 Permeable pavements require periodic inspection and cleaning. Consideration should be given to installing signage to restrict heavily loaded vehicles (i.e. trash trucks, delivery trucks, etc.) from driving on permeable pavement areas. Also, maintenance of permeable pavements should be completed by properly trained workers. 5.0 GENERAL COMMENTS Terracon should be retained to review the final design plans and specifications so comments can be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications. Terracon also should be retained to provide observation and testing services during grading, excavation, foundation construction and other earth -related construction phases of the project. The analysis and recommendations presented in this report are based upon the data obtained from the borings performed at the indicated locations and from other information discussed in this report. This report does not reflect variations that may occur between borings, across the site, or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction. If variations appear, we should be immediately notified so that further evaluation and supplemental recommendations can be provided. The scope of services for this project does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranties, either express or implied, are intended or made. Site safety, excavation support, and dewatering requirements are the responsibility of others. In the event that changes in the nature, design, or location of the project as described in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless Terracon reviews the changes and either verges or modifies the conclusions of this report in writing. Responsive a Resourceful ® Reliable 22 Geotechnical Engineering Report l��rracon Uptown Plaza ® Fort Collins, Colorado July 24, 2013 ■ Terracon Project No. 20135023 Concrete should be deposited by truck mixers or agitators and placed a maximum of 90 minutes from the time the water is added to the mix. Longitudinal and transverse joints should be provided_ as needed in concrete pavements for expansion/contraction and isolation per ACI 325. The location and extent of joints should be based upon the final pavement geometry. Joints should be sealed to prevent entry of foreign material and doweled where necessary for load transfer. Although not required for structural support, a minimum 4-inch thick aggregate base course layer is recommended for the PCC pavements in heavy-duty areas to help reduce the potential for slab curl, shrinkage cracking, and subgrade "pumping" through joints. Proper joint spacing will also be required for PCC pavements to prevent excessive slab curling and shrinkage cracking. All joints should be sealed to prevent entry of foreign material and dowelled where necessary for load transfer. For areas subject to concentrated and repetitive loading conditions such as dumpster pads, truck delivery docks and ingress/egress aprons, we recommend using a portland cement concrete pavement with a thickness of at least 6 inches underlain by at least 4 inches of granular base. Prior to placement of the granular base the areas should be thoroughly proofrolled. For dumpster pads, the concrete pavement area should be large enough to support the container and tipping axle of the refuse truck. Pavement performance is affected by its surroundings. In addition to providing preventive maintenance, the civil engineer should consider the following recommendations in the design and layout of pavements: ® Site grades should slope a minimum of 2 percent away from the pavements; a The subgrade and the pavement surface have a minimum 2 percent slope to promote proper surface drainage; o Consider appropriate edge drainage and pavement under drain systems; • Install pavement drainage surrounding areas anticipated for frequent wetting; a Install joint sealant and seal cracks immediately; a Seal all landscaped areas in, or adjacent to pavements to reduce moisture migration to subgrade soils; and ® Placing compacted, low permeability backfill against the exterior side of curb and gutter. 4.7.3 Pavements — Maintenance Preventative maintenance should be planned and provided for an ongoing pavement management program in order to enhance future pavement performance. Preventive maintenance consists of both localized maintenance (e.g. crack and joint sealing and patching) and global maintenance (e.g. surface sealing). Preventative maintenance is usually the first priority when implementing a planned pavement maintenance program and provides the highest return on investment for pavements. Responsive ® Resourceful o Reliable 21 Geotechnical Engineering Report Uptown Plaza s Fort Collins, Colorado July 24, 2013 a Terracon Project No. 20135023 Conventional Pavements Merracon Traffic Area r X-AltaffaMe., RecommentledPavement'Thickness( ,��kAsphaltrc Concrete °A re atefi�PortlandCement� _, Base Coursed inc hes) , Concrete 1Rtal, .a Automobile Parking (light duty) A 3 4 - 7 B - - 5 5 Drive Lanes and Loading Areas (heavy duty) A 4 6 - 10 B - 4 5 9 Permeable Pavements Ma,��ffiC f-. Y s �d �" "M B Recomm�. en Ilk f 4 YS ded Pid� avement Thickness fi ' i3de (inches) g> p ` p . „ Alternatives Porous ar Interlocking Concrete re ate ' ` ` g - Area i As halt Permeable Corcrete Paveme t � tal Base tNull: ,z ��3 Course A 3 6 9 Automobile Parking B 6 3 9 ---- C - Typically 3'/8 3 6 Ye Terracon recommends the design and construction of permeable pavements should be completed by a specialty contractor who has demonstrated experience with placing, compacting, finishing, edging, jointing, curing, and protecting permeable pavements. There are several choices for base course depending upon which type of permeable pavement is chosen. Terracon recommends constructing perimeter curbing around permeable pavements and between conventional and permeable pavements to reduce infiltration of water below moisture sensitive subgrades. Where rigid pavements are used, portland cement concrete should be produced from an approved mix design with the following minimum properties: s�y L &' �£P` hViaileu-e ,G i�, dMrtP Compressive strength 4,000 psi (mimum) Cement type Type I or II cement Entrained air content (%) 5 to 8 Concrete aggregate ASTM C33 and CDOT Section 703 Responsive m Resourceful ■ Reliable 20 Geotechnical Engineering Report 1r�rrac®n Uptown Plaza a Fort Collins, Colorado July 24, 2013 a Terracon Project No. 20135023 evaluated at the time of pavement construction for signs of disturbance or instability. We recommend the pavement subgrade be thoroughly proofrolled with a loaded tandem -axle dump truck prior to final grading and paving. All pavement areas should be moisture conditioned and properly compacted to the recommendations in this report immediately prior to paving. 4.7.2 Pavements — Permeable Pavement Subgrade Preparation Unlike conventional pavements, permeable pavement subgrades are not compacted. When preparing the subgrade for permeable pavements, care should be taken to excavate the required reservoir storage volume without disturbing the underlying soils. Groundwater was encountered at depths of about 3.5 and 3.7 feet below existing site grades in the portion of the site planned for permeable pavements. Shallow groundwater conditions will limit the thickness of the rock reservoir layer used to store the storm water runoff. Shallow groundwater will also reduce infiltration rates as the water stored within the rock reservoir layer infiltrates into the groundwater. 4.7.2 Pavements — Design Recommendations Design of pavements for the project have been based on the procedures outlined in the 1993 Guideline for Design of Pavement Structures prepared by the American Association of State Highway and Transportation Officials (AASHTO) and the Larimer County Urban Area Street Standards (LCUASS). A sample of the fill materials selected for swell -consolidation testing exhibited no movement when wetted under an applied pressure of 200 psf which is less than the maximum 2 percent criteria established for determining if swell -mitigation procedures in the pavement sections are required per LCUASS standards. Therefore, we do not believe swell -mitigation of the subgrade materials prior to pavement operations is necessary. Traffic patterns and anticipated loading conditions were not available at the time that this report was prepared. However, we anticipate that the new parking areas (i.e., light -duty) will be primarily used by personal vehicles (cars and pick-up trucks). Delivery trucks and refuse disposal vehicles will be expected in the drive lanes and loading areas (i.e., mediurr'-duty). A maximum of 10 trucks per week were considered developing our recommendations. If heavier traffic loading is expected, Terracon should be provided with the information and allowed to review these pavement sections. Rigid pavement design is based on an evaluation of the Modulus of Subgrade Reaction of the soils (k-value), the Modulus of Rupture of the concrete, and other factors previously described. A Modulus of Subgrade Reaction of 200 pci, and a Modulus of Rupture of 600 psi, were used for pavement concrete. The rigid pavement thickness was determined on the basis of the AASHTO design equation. Recommended minimum pavement sections are provided in the table below. Responsive o Resourceful a Reliable 19 Geotechnical Engineering Report lrorraeon Uptown Plaza a Fort Collins, Colorado July 24, 2013 a Terracon Project No. 20135023 moist. The soils encountered in DP-2 were also visually classified in the field and consisted of native sandy lean clay. The soils encountered in DP-2 were very moist to wet. Groundwater was not encountered in field hydraulic conductivity test boring DP-1. Groundwater was encountered in field hydraulic conductivity test boring DP-2 at a depth of approximately 2.7 feet below existing site grade while drilling. During delayed groundwater measurements taken in other borings completed on the site, groundwater was measured in Boring No. 5 (located near hydraulic conductivity test boring DP-2) at a depth of approximately 3.8 feet below the existing ground surface. The groundwater levels measured in our borings at the time of our field study were used when calculating the field hydraulic conductivity at this site. 4.6.2 Hydraulic Conductivity - Discussion The field hydraulic conductivity testing performed as part of our study was developed by the U.S. Bureau of Reclamation and was referred to as the well permeameter method. The field hydraulic conductivity tests were performed by adding water to the test holes to maintain a constant water level (constant head test). The calculated hydraulic conductivity value for field hydraulic conductivity test holes DP-1 and DP-2 were 3 feet per day (ft/day) and 108 May, respectively. The calculated value for DP-1 is within the expected ranges for the soil types encountered in our borings and is considered to be a representative value. The calculated value for DP-2 is much higher than the expected ranges for the soil types (upper clays) encountered in our borings. However, a layer of clean to silty gravel with sand was encountered in some of the other borings completed at this site at a depth of approximately 6 feet below existing site grades. It is likely the gravel layer extends below most of the site and would be expected near the bottom of DP-2. We believe the comparatively higher field hydraulic conductivity value measured in DP-2 is due to the higher flow rates that occur as water flows into the gravel layer below the site. The test results and schematics of the field hydraulic conductivity test hole details, Exhibit B-7 and B-8, are included in Appendix B. The field hydraulic conductivity test results and soils encountered in our borings completed at the site indicate infiltration of storm water retained in a reservoir below permeable pavements into the soils underlying this site will be favorable for the design of permeable pavements. However, shallow groundwater conditions may limit the allowable depth of the retention area below permeable pavements. The slotted PVC pipe was left in place for future groundwater readings. 4.7 Pavements 4.7.1 Pavements — Conventional Subgrade Preparation On most project sites, the site grading is accomplished relatively early in the construction phase. Fills are typically placed and compacted in a uniform manner. However as construction proceeds, the subgrade may be disturbed due to utility excavations, construction traffic, desiccation, or rainfall/snow melt. As a result, the pavement subgrade may not be suitable for pavement construction and corrective action will be required. The subgrade should be carefully Responsive €a Resourceful a Reliable 18 Geotechnical Engineering Report Uptown Plaza Fort Collins, Colorado July 24, 2013 0 Terracon Project No. 20135023 should refer to ACI 302 for procedures and cautions regarding the use and placement of a vapor retarder. ® Other design and construction considerations, as outlined in the ACI Design Manual, Section 302.1 R are recommended. 4.5.2 Floor Systems - Construction Considerations Movements of slabs -on -grade using the recommendations discussed in previous sections of this report will likely be reduced and tend to be more uniform. The estimates discussed above assume that the other recommendations in this report are followed. Additional movement could occur should the subsurface soils become wetted to significant depths, which could result in potential excessive movement causing uneven floor slabs and severe cracking. This could be due to over watering of landscaping, poor drainage, improperly functioning drain systems, and/or broken utility lines. Therefore, it is imperative that the recommendations presented in this report be followed. 4.6 Hydraulic Conductivity Testing Two (2) hydraulic conductivity borings, presented as Exhibits A-10 and A-11, and designated as Boring DP-1 and DP-2, were performed to depths of approximately 3 feet below existing site grades. Logs of the borings along with a Boring Location Plan (Exhibit A-2) are included in Appendix A. 4.6.1 Hydraulic Conductivity— Field Investigation We understand a carwash building previously occupying the site was demolished and removed prior to our field investigation. During our field investigation, two (2) field hydraulic conductivity test borings were completed to a depth of approximately 3 feet below existing site grades. The field hydraulic conductivity test borings were completed in areas of. the site planned for permeable pavements. One of the field hydraulic conductivity test borings (DP-1) was completed in the area where the car wash building previously occupied the site. The second field hydraulic conductivity test boring (DP-2) was completed in the area of the site where we believe an existing detention area is present. Field hydraulic conductivity test boring DP-1 was drilled with a CME-45 truck mounted drill rig with 4-inch outer diameter solid -stem augers. Field hydraulic conductivity test boring DP-2 was completed with a 33/<-inch hand auger. During the drilling operations, lithologic logs of the borings were recorded by the field engineer. Slotted PVC pipe was placed in each of the field hydraulic conductivity test holes full -depth and the annulus surrounding the slotted PVC pipe was filled with clean filter sand. The borings were then saturated with water and left to stabilize overnight. The soils encountered in DP-1 were visually classified in the field and consisted of existing fill materials comprised of lean clay with sand and gravel. The existing fill was slightly moist to Responsive c Resourceful m Reliable 1 17 Geotechnical Engineering Report l�err�eon Uptown Plaza a Fort Collins, Colorado July 24, 2013 s Terracon Project No. 20135023 F N� Elevation of 3a s DepthAo groundwater ,> jDepth to groundwater, . P 9 Bonng�Nurriber s ti 9 w _ �� - groundwater 8,days k q while dnllmg, ft �, � , 1 day after dnlhng, ft � �� ,�� V t < �i a after dnllmg ft �� 1 _ � 1 6 �--=-2.5 5,035.8 2 6 6.1 5,032.6 3 13.5 ! 4.9 5,034.9 4 6 3.2 5,035.7 5 Not encountered 3.8 5,034.5 6 Not encountered 3.5 5,035.9 DP-1 Not encountered i -- -- DP-2 2.7 - These observations represent groundwater conditions at the time of the field exploration, and may not be indicative of other times or at other locations. Groundwater levels can be expected to fluctuate with varying seasonal and weather conditions, and other factors. Groundwater level fluctuations occur due to seasonal variations in amount of rainfall, runoff and other factors not evident at the time the borings were performed. Therefore, groundwater levels during construction or at other times in the life of the structure may be higher or lower than the levels indicated on the boring logs. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project. Fluctuations in groundwater levels can best be determined by implementation of a groundwater monitoring plan. Such a plan would include installation of groundwater piezometers, and periodic measurement of groundwater levels over a sufficient period of time. 4.0 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION 4.1 Geotechnical Considerations Based on subsurface conditions encountered in the borings, the site appears suitable for the proposed construction from a geotechnical point of view provided certain precautions and design and construction recommendations described in this report are followed. We have identified geotechnical conditions that could impact design and construction of the proposed structure, pavements, and other site improvements. 4.1.1 Existing, Undocumented Fill As previously noted, existing undocumented fill was encountered to depths up to about 4 feet in the borings drilled at the site. Deeper fills may be present on the site where buried tanks were removed during demolition of the gas station previously occupying the site. We do not recommend supporting shallow spread footing foundations or floor slabs on the existing fill Responsive ® Resourceful a Reliable 4 Geotechnical Engineering Report Uptown Plaza 1501 West Elizabeth Street Fort Collins, Colorado July 24, 2013 Terracon Project No. 20135023 Prepared for: D.K. Investments, Inc. Windsor, Colorado Prepared by: Terracon Consultants, Inc. Fort Collins, Colorado APPENDIX F EXCERPTS FROM OTHER REPORTS Attachment C ®i HEC-RAS CROSS SECTION BASE FLOOD ELEVATION 1/2-FOOT FLOOOWAY BOUNDARY 100-YR FLOODPLAIN BOUNDARY FLOW PATH DIVIDE ®AREAS OF FLOODING DETERMINED BY APPROXIMATE METHODS 1501 W Elizabeth Current Effective Attachment 6 r'q 1 11 _... APPENDIX E.2 EUZABETH STREET/CONtiRTUT10N AVENUE FLOW PATH �' . 1"=200' N A W C raEx J mu, inc Ow - 100-YEAR FLOODPLAIN MAP PLATE 8, w"'m "' FULLY DEVELOPED CONDMONS WITH EXISTING FACILITIES m �rr��.�rair..pa�mma o... w t M1.moa..o r.meumi Attachment A City Floodplain Waiver Form (Based on City of Fort Collins Code, Section 10-114 or 10-144) Sedlon A Property,lnformation Property address or legal description 1501 West Elizabeth Street, Parcel # 9715440-001 Applicant name Patricia ICroetch, P.E. Phone 970-686-6939 Applicant address 700 Automation Dr., Windsor, CO 80550 Sedian B P! L60dsed Project Information' r • Description of proposed project (check all that apply):O new construction [I additionElremodel F—Iredevelopment ❑accessory structure ❑✓ fill ❑✓ excavation ❑change of use ❑other (Attach additional descriptions and drawings as necessary.) Current use (check one):❑residential ❑✓ non-residential ❑mixed-use❑vacantground Proposed use (check one): ❑residential ✓❑non-residential ❑ mixed -use ❑other If non-residential or mixed -use, describe use in more detail: Commercial use • Foundation type (check one): Qslab on grade basement❑crawl space ❑enclosed area above grade - --- Section C Waiver Information • Base flood elevation (100-year flood level): 5041.9ft NGV41(City) N/A (FEMA) • Regulatory flood protection elevation: N/A • Floodplain designation: ❑FEMA ✓❑City Floodplain name: Canal Importation Floodway:❑yes ❑✓ no • Proposed lowest floor elevation (refer to city code io-37(d)): N/A (attach drawing) • Name of capital project that will remove property from floodplain: CIPO • Section(s) of City Code for which a waiver is being requested: 10- 1 39(1)and 10-37(C)(3)(a) • What is the waiver request? Request to use post-CIPO construction hydrologic and hvdraulic information to remove the parcel from the floodplain and from the standards of Chanter 10 of Citv Code. The applicant hereby certifies that the above information, along with the attached plans and project descriptions, are correct.The applicant agrees to comply with the provisions of the zoning ordinance, building code, all other applicable sections of City Code, Land Use Code, City Plan and all other lays and ordinances affecting the construction and occupancy of the proposed building. The applicant understands that if this waiver is approved, the structure and its occupants may be more susceptible to flood damage and, if in a FEMA floodplain, the cost of flood insurance may increase for the property. The applicant understands that new structures that are constructed pursuant to this waiver and upon completion of the relevant capital project, are determined to not have been removed fro the floodway or flood fringe as anticipated at the time of said waiver and will be deemed to benon-conforms u s nd all it u activities and development shall be subject to the requirements of Chapter 10 of City Code as the same would a ly to any co o g structure. //n Signature of applicant: Date: l��Z3kt3 Capital project Notice to Proceed date: Expected capital project completion date: Technical analysis for capital project: .72 dCapital project will completely remove property from floodplain (check one) p yes 0 no ❑ unsure ns Notes: 01 V oWaiver.: ❑ approved ❑ denied�c.'i-11Jt3dEilities General Manager. ""r"r ; — ate: floodptoin Waiver fa m 1106 be completed without elevating or floodproofing City Municipal Code. of Port °Colllns per the floodplain standards of Chapter 10 of CURRENT EFFECTIVE HYDRAULIC MODEL — 2001 Attachment B is Plate 8 of the 100-year floodplain in the Elizabeth Street/Constitution Avenue Flow Path, and shows the BFE and the HEC-RAS cross -sections along Elizabeth Street. 1501 W. Elizabeth St. has been highlighted and cross -hatched, and as can be seen, a portion of the property is in the current effective floodplain. POST PROJECT (CIPO) HYDRAULIC MODEL — 2013 Attachment C is Plate 8 of the 100-year floodplain in the Elizabeth Street Channel Flow Path, and shows the BFE and the HEC-RAS cross -sections that remain along the Elizabeth Street flow path, after updating the hydraulic model to reflect the improvements made as part of the CIPO project. 1501 W. Elizabeth St. has been highlighted and cross -hatched. Please note that the entire lot has been completely removed from the 100-year post project floodplain. FLOODPLAIN DOCUMENTATION In addition to the attachments, the following documents are available for review and inspection in the Stormwater Master Planning and Floodplain Administration office: "Volume III, Technical Appendix E, F Canal Importation Basin Master Drainage Plan"; Anderson Consulting Engineers; May 11. 2001 "As -Built Design Summary and Floodplain Modeling Report for Canal Importation Ponds and Outfall Project (CIPO)"; Ayres Associates; February, 2013 APPLICABLE CODE • 10-140(1) —new mixed -use construction is permitted in the flood fringe of a City basin, as long as the standards of 10-37 or 10-38 are satisfied. • 10-37(c)(3)(a) — new structures must be elevated eighteen inches above the base flood elevation. WAIVER AUTHORITY • 10-144 — The General Manager may waive floodplain requirements if he is satisfied that there is sufficient degree of certainty that the property will be removed from the floodplain as a result of a City funded capital project. The construction of the project and the hydraulic analysis are complete and accepted by City staff and awaiting adoption by City Council. FLOODPLAIN WAIVER Stormwater staff recommends that the floodplain waiver be approved. If there are any questions, or if additional information is needed, please contact Stormwater staff. cc: Jon Haukaas, Water Engineering and Feld Operations Manager Brian Varrella, Floodplain Administrator Utilities City electric o wastewater water Of F AM, d Street PO Box 580 Collins Fart Collins. CO 80522 For700 t Collins. 970.221.6700 970-221.6619619 —fax 970.224.6003 — Too utiliBes@fcgov corn kgov.com/utiflues MEMORANDUM DATE: November 1, 2013 TO: Brian Janonis, Utilities Executive Director FROM: Mark Taylor, Civil Engineer IIA* Ken Sampley, Stormwater and Floodplain Program Manager�k RE: Floodplain waiver request for 1501 West Elizabeth Street PURPOSE/EXECUTIVE SUMMARY A proposed redevelopment (mixed use with multi -family over commercial) project at 1501 W Elizabeth Street can benefit from a City floodplain waiver. The project is located in the Canal Importation Basin Floodplain and downstream of the capital improvements associated with the Canal Importation Ponds and Outfall Project (CIPO) project. The CIPO project has completely removed this property from the 100-year floodplain. The effect of these improvements on flood hazard mapping, as studied and documented in February, 2013 by Ayres Associates, have not been adopted into the Stormwater Master Plan by City Council. Your review and/or approval of the waiver is requested to allow the development to move forward with the benefit of more accurate flood risk information, consistent with the standards of Section 10-144 of Chapter 10 of City Municipal Code. This will remove requirements to elevate mixed -use residential structures in the City flood fringe currently outlined in Sections 10-37 and 10-140. BACKGROUND A proposal to construct a new 2-story mixed use building with multi -family residential on the second floor and commercial use on the first floor is in the process of being reviewed by City staff. The previous structure, formerly operated as service station/convenience store, has been demolished. A portion of the property is within the flood fringe of the City -regulated 100-year Canal Importation Basin floodplain, as shown in Attachment B. The current effective hydraulic model on West Elizabeth Street was established by Anderson Consulting Engineers as part of the Canal Importation Basin Master Plan, in 2001. The City contracted with Ayres Associates to update the hydraulics and hydrology in the Canal Importation Basin following the completion of the CIPO improvements. The updated hydraulic model, which was completed in February, 2013, has been reviewed and accepted by City staff, but has not been adopted by City Council at this time. REQUEST The developer of 1501 W. Elizabeth Street has requested that the City grant a floodplain waiver, included as Attachment A, so that the most up-to-date hydraulic data may be used, which completely removes the property from the 100-year floodplain and enables the development to APPENDIX E FLOODPLAIN WAIVER SEDIMENT/EROSION CONTROL BEST MANAGEMENT PRACTICES (BMPs) COST OPINION SPREADSHEET 1501 West Elizabeth (Uptown Plaza) Item No. BMP ID Unit Installation Unit Cost Quantity Cost 1 Check Dam CDR LF $0.00 2 Check Dam (Reinforced) CDR LF $0.00 3 Concrete Washout Area CWA EA $1,200.00 1 $1,200.00 4 Construction Fence CF I LF $0.00 5 Construction Markers CM LF $0.00 6 Culvert Inlet Filter CIF LF $0.00 7 Dewatering DW EA $0.00 8 Diversion Ditch (Unlined) DD LF $0.00 9 Diversion Ditch (ECM or plastic) DD LF $0.00 10 Sediment/Erosion Control Matting ECM SY $0.00 11 Inlet Protection IP LF $10.00 16 $160.00 12 Reinforced Rock Berm RRB LF $0.00 13 Sediment Basin(') SB LF $0.00 14 Sediment Control Log (Wattle) SCL LF $0.00 15 Seeding and Mulching SM AC $0.00 16 Sift Fence SF LF $3.00 885 $2,655.00 17 Rock Sock RS LF $10.00 35 $350.00 18 Stabilized Staging Area SSA SY $0.00 19 Surface Roughening SR AC $0.00 20 Temporary Stream Crossing TSC EA $0.00 21 Topsoil (6-inch Lift) TSL AC $0.00 22 Vehicle Tracking Control(2) VTC EA $1,500.00 1 $1,500.00 Subtotal $5,865.00 Maintenance & replacements (50%) $2,932.50 #1 Erosion control amount 1 $8,797.50 #2 Reseeding AC $1,200 1.28 $1,536.00 Erosion control escrow (greater of #1 & #2) $8,797.50 CONSTRUCTION SEQUENCE PROJECT: 1501 W ELIZABETH (UPTOWN PLAZA) DATE: 1/29/14 CONSTRUCTION PHASE (MONTH) 1 2 3 4 5 6 7 8 9 10 11 12 DEMOLITION GRADING INCLUDES OVERLOT OVERLOT DETENTION / WO PONDS SWALES, DRAINAGEWAYS, STREAMS PIPELINE INSTALLATION INCLUDES OFFSITE WATER SAINITARY SEWER STORM SEWER CONCRETE INSTALLATION (INCLUDES OFFSITE) AREA INLETS CURB INLETS CURB AND GUTTER PAVEMENT INSTALLTATION FINE GRADING BASE COURSE INSTALL PAVEMENT BEST MANAGEMENT PRACTICES APPENDIX D BMP SCHEDULE & COST ESTIMATE f7 Detention Pond Outlet Sizing 100-YEAR LOCATION: 1501 West Elizabeth PROJECT NO: 350-01 COMPUTATIONS BY: PPK DATE: 1/28/2014 Submerged Orifice Outlet: release rate is described by the orifice equation, Qo = Ck sgrt( 2g(h-E.)) where Qo = orifice outflow (cfs) Ca = orifice discharge coefficient g = gravitational acceleration = 32.2 ft/s A, = effective area of the orifice (ft`) Eo = greater of geometric center elevation of the orifice or d/s HGL (ft) h = water surface elevation (ft) Qmax = outlet pipe dia = D = Invert elev. = Ea = h= Co = 0.45 cfs 12.0 in 5033.47 ft 5033.61 ft 5036.00 ft - 100 yr WSEL 0.6 solve for effective area of orifice using the orifice equation Ao = 0.060 ft` = 8.7 in` orifice dia. = d = 3.33 in Check orifice discharge coefficient using Figure 5-21 (Hydraulic Engineering) d / D = 0.28 kinematic viscosity, v = 1.22E-05 ftZ/s Reynolds no. = Red = 4Q/(pdv) = 1.69E+05 Co = (K in figure) = 0.6 check Use d = Ao = Qo = Detention.xls 3.300 in 0.059 ff` _ 0.44 cfs 8.55 in LOCATION: PROJECT NO: COMPUTATIONS BY DATE: STAGE - STORAGE TABLE 100-YEAR 1501 West Elizabeth 350-01 PPK 1/28/2014 POND 1 Extended Water Quality Volume Required = WQCV 100 year WSEL Spillway Elevation 100 yr Detention Volume Required = Total 100 yr Volume Required = With 0.40 porosity 0.042 0.105 ac ft 0.319 0.799 ac ft 0.361 0.904 ac ft Stage (ft) Surface Area (ft`) Incremental Storage (ac-ft) Total Storage (ac-ft) 5033.47 0 5034.50 13,888 0.109 0.109 5035 20,630 0.242 0.242 5036 20,630 0.474 0.715 5036.40 20,630 0.189 0.905 5037 20,630 0.284 1.189 WATER QUALITY CALCULATIONS LOCATION: PROJECT NO: COMPUTATIONS BY: DATE: 1501 West Elizabeth 350-01 PPK 1 /28/2014 Use 24-hour brim -full volume drain time for extended detention basin Required Storage = a ' ( 0.91 ' 13 - 1.19 ` I2 + 0.78 ' 1) Water Quality Capture Volume = WQCV = (required storage/12)'(tributary drainage area) SUB BASIN Trib. area (ac) % Imperv. Req. Storage tin, of runoff) from Fig. SQ-2 WQCV (ac-ft) req. vol WQCV'1.2 (ac-ft) DwQ (ft) req. area/row from Fig. EDB-3 (in Z/row) POND 3 1.28 80 0.33 0.035 0.042 1.00 0.381 WQ outlet sizing for pond 1 From Figure 5, for 314 in. hole diameter Area of hole = 0.442 in # of columns = 1 Area provided/row = 0.442 in Area Required/row = 0.381 in Use 1 columns of 3/4" diam holes 100-YEAR DETENTION VOLUME REQUIRED UNDER PARKING LOT DETENTION POND FAA METHOD LOCATION: 1501 West Elizabeth PROJECT NO: 350-01 COMPUTATIONS BY: PPK DATE: 1 /28/2014 Equations: A trib. To pond = 1.28 acre Qp = CIA C100 = 1.00 Vi = T C I A= T Qp Developed C A= 1.3 acre Vo =K QPo T QPo = 0.45 cfS S=Vi -Vo K= 0.9 Rainfall intensity from City of Fort Collins IDF Curve Storm Duration, T (min) Rainfall Intensity, i (in/hr) Qp (cfs) Vol. In Vi (ft) Vol. Out Vo (ft) Storage S (ft) Storage S (ac-ft) 5 9.95 12.7 3821 0 3821 0.088 10 7.72 9.9 5929 0 5929 0.136 20 5.60 7.2 8602 243 8359 0.192 30 4.52 5.8 10414 486 9928 0.228 40 3.74 4.8 11489 729 10760 0.247 50 3.23 4.1 12403 972 11431 0.262 60 2.86 3.7 13179 1215 11964 0.275 70 2.62 3.4 14085 1458 12627 0.290 80 2.38 3.0 14623 1701 12922 0.297 90 2.22 2.8 15345 1944 13401 0.308 100 2.05 2.6 15744 2187 13557 0.311 110 1.93 2.5 16305 2430 13875 0.319 120 1.80 2.3 16589 2673 13916 0.319 130 1.60 2.0 15974 2916 13058 0.300 140 1.40 1.8 15053 3159 11894 0.273 150 1.20 1.5 13824 3402 10422 0.239 160 1.15 1.5 14131 3645 10486 0.241 170 1 1.10 1.4 14362 3888 10474 0.240 180 1 1.05 1.3 14515 4131 1 10384 0.238 Required Storage Volume: 13916 ft' 0.319 acre-ft APPENDIX C DETENTION POND CALCULATIONS North,Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: PROJECT NO: COMPUTATIONS BY: DATE: 100-yr storm, Cf = 1501 West Elizabeth 350-01 ppk 1/28/2014 1.25 RATIONAL METHOD PEAK RUNOFF (100-YEAR) DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Point Subbasin ID A (ac) C'Cf tc (min) i (in/hr) Q (100) (cfs) Design Point Q (100) (cfs) Q(100)tot (cfs) 1 Historic 1 Historic 1.28 0.28 7.8 8.19 2.9 2.9 Pre Development 1 1 1.28 1.00 5.0 9.95 12.8 12.8 Post Development Q = C iA Q = peak discharge (cfs) C = runoff coefficient I = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) FlowAs Q100 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: PROJECT NO: COMPUTATIONS BY: DATE: 10-yr storm, Cf = 1501 West Elizabeth 350-01 ppk 1/28/2014 1.00 RATIONAL METHOD PEAK RUNOFF (10-YEAR) DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Point Subbasin ID A (ac) C"Cf tc (min) i (in/hr) Q (10) (cfs) Design Point Q (10) (cfs) Q(10)tot (cfs) 1 Historic 1 Historic 1.28 0.22 8.1 3.91 1.1 1.1 Pre Development 1 1 1.28 0.82 5.0 4.87 5.1 5.1 Post Development Q = C iA Q = peak discharge (cfs) C = runoff coefficient I = rainfall intensity (in/hr) from OF curve A = drainage area (acres) Flow.xls Q10 North Star Design, Inc. 700 Automation Drive, Unit Windsor, CO 80550 LOCATION: PROJECT NO: COMPUTATIONS BY: DATE: 2-yr storm, Cf = 1501 West Elizabeth 350-01 ppk 1/28/2014 RATIONAL METHOD PEAK RUNOFF (2-YEAR) DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Point Subbasin ID A (ac) C'Cf tc (min) i (in/hr) Q (2) (cfs) Design Point Q (2) (cfs) Q(2)tot (cfs) 1 Historic 1 Historic 1.28 0.22 12.1 1.57 0.45 0.45 Release Rate 1 1 1.28 0.82 6.4 2.60 2.7 2.7 Post Development Q = C iA Q = peak discharge (cfs) C = runoff coefficient I = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) Flow.xls Q2 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 TIME OF CONCENTRATION - 100 YR LOCATION:' 1501 West Elizabeth PROJECT NO: 350-01 COMPUTATIONS BY: ppk DATE: 1/28/2014 100-yr storm Cf = 1.25 SUB -BASIN DATA INITIAL I OVERLAND TIME (u) TRAVEL TIME / GUTTER OR CHANNEL FLOW (tt) tc CHECK (URBANIZED BASIN) FINAL tc REMARKS DESIGN POINT SUBBASIN ID 1) Area (ac) (2) C (3) C'Cf Length (ft) (4) Slope (%) (5 ti (min) (6) Length (ft) (7) Slope (%) (8) n Manning rough. Val. (ft/s) (9) tt (min) (10) to = ti + tt (11) Total L (ft) 12 tc=(1/180)+10 (min) (13) (min) (14 1 Historic 1 Historic 1.28 0.22 0.28 20 2.0 5.3 300 1.00 0.016 2.0 2.49 7.8 320 11.8 7.8 Pre Development i 1 1.28 0.82 1.00 50 15.0 0.5 0 1.00 0.016 2.0 0.00 0.5 50 10.3 5.0 IPost Development :: Eq - I I EQUATIONS: tc=ti+tt ti = (1.87 (1.1 - CCt ) Lo.5 ) / s. 1/3 It = Wel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + tt and urbanized basin check minimum tc = 5 minutes Flow.xls TOC-100 North Star Design. Inc. 700 Automation Drive, Unit I Wndsor, CO 80550 LOCATION: 1501 West Elizabeth PROJECT NO: 350-01 COMPUTATIONS BY: ppk DATE: 1 /28/2014 10-yr storm Cf = 1.00 TIME OF CONCENTRATION - 10 YR SUB -BASIN DATA INITIAL / OVERLAND TIME (tl) TRAVEL TIME / GUTTER OR CHANNEL FLOW (tt) tc CHECK (URBANIZED BASIN) FINAL tc REMARKS DESIGN POINT SUBBASIN ID (1) Area (ac) (2) C (3) C'Cf Length (ft) (4 Slope (°/a) 5 ti (min) (6) Length (ft) (7) Slope (%) (8) n Manning rough. Val. (ft/s) (9) It (min) (10) tc = ti + It (11) Total L (ft) (12) tc=(1/180)+10 (min) (13) (min) (14) 1 Historic 1 Historic 1.28 0.22 0.22 20 2.0 5.6 300 1.00 0.016 2.0 2.5 8.1 320 11.8 8.1 Pre Development �31 1 - 1 1.28 0.82 0.82 50 15.0 1.4 0 1.00 0.016 2.0 0.0 1.4 50 10 5.0 jPost Development EQUATIONS: tc=ti+It tl=[1.87(1.1- CCt) La.51/ S 113 it = L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + It and urbanized basin check minimum tc = 5 minutes Flow.xls TOC-10 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: 1501 West Elizabeth PROJECT NO: 350-01 COMPUTATIONS BY: ppk DATE: 1 /28/2014 2-yr storm Cf = 1.00 TIME OF CONCENTRATION - 2 YR SUB -BASIN DATA INITIAL / OVERLAND TIME (ti) TRAVEL TIME / GUTTER OR CHANNEL FLOW (tt) tc CHECK (URBANIZED BASIN) FINAL tc REMARKS DESIGNbSUBBASIN POINT(ac) Area (2) C (3 C'Cf Length (ft) (4) Slope N (5 li (min) (6) Length (ft) (7) Slope (%) (8) n Manning rough. Vel. (fUs) (9) tt (min) (10) tc= ti + tt (11) Total L (ft) (12 tc=(U180)+10 (min) (13) (min) 14) 1 Historic 1.28 0.22 0.22 187 0.7 24.4 190 0.50 0.030 0.8 4.2 28.5 377 12.1 12.1 Pre Develo ment 1.28 0.82 0.82 118 1.1 5.2 186 1.20 0.013 2.7 1.1 11.7 6.4 Post Develo ment Ps�. EQUATIONS: tc = ti + tt ti = [1.87 (1.1 - CC1) 1-0.5 ] / S 15 It= LNel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + ft and urbanized basin check minimum tc = 5 minutes Flow.als TOC-2 North Star Design, Inc. 700 Automation Drive, Unit 1 Windsor, CO 80550 LOCATION:1501,WestElizabeth PROJECT NO: 350-01 COMPUTATIONS BY: ppk DATE: 1/28/2014 RUNOFF. COEFFICIENTS & % IMPERVIOUS Recommended Runoff Coefficients from Table 3-3 of City of Fort Collins Design Criteria Recommended % Impervious from Urban Storm Drainage Criteria Manual Streets, parking lots (asphalt) Sidewalks (concrete) Roofs: Lawns (flat <2%, heavy soil; Runoff % coefficient Impervious C 0.95 100 0.95 96 0.95 90 0.20 0 SUBBASIN ID - TOTAL AREA (ac.) TOTAL AREA (sq.ft) ROOF AREA (sq.ft) PAVED AREA (sq.ft) SIDEWALK AREA (s .ft) LANDSCAPE AREA (sq.ft) RUNOFF COEFF. (C) % Impervious REMARKS 1 Historic 1.28 55,864 0 1,565, 0 54,299 0.22 3 Pre Development 1 1.28 55,864 17,000 21,950 7,520 9,394 0.82 80 Past Development EEc uations Calculated C coefficients & % Impervious are area weighted C=£(Ci Ai) /At Ci = runoff coefficient for specific area, Ai Ai = areas of surface with runoff coefficient of Ci n = number of different surfaces to consider At = total area over which C is applicable; the sum of all Ai's Flow.xls Cval APPENDIX B HYDROLOGIC COMPUTATIONS R3 ./.mot•om�omi n FONT FLpODNAN soMDMY ■N..we FLOODPLAN NOTES 1, PORYONS OF THIS PROJECT WERE LOCATED IN THE CITY REGULATORY 100-YEAR CANAL IMPORTATION BASIN FLOOOPWN BUT THE SITE HAS BEEN REMOVED NA THE FLOCDPLNN WAIVER PROCESS BASED ON WFORIATON CONTAINED W THE 'AS -BUILT OESICN SUMMARY k iLOCKI MODELING REPORT FOR CANAL IMPORTATION PONDS AND WITALL' BY ACRES ASSOCIATES DATED FEBRUARY 2013. THE CHAPTER 10 REQUIREMENTS OF CITY MUNICIPAL CODE NO LONGER APPLY. 2, WFORMATON SHOWN IS BASED W THE CURRENT EFFECTIVE MODEL MAP BY ANDERSON CWSULPNG ,. ENGINEERS DATED 2001, QTDCCT -' CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 (811) E,sL 2-BU9NEBs DAYS W NDVANCE BEFORE You Oy WNDE. OR EXCAVATE I'M THE MARNWG CF UNDERG4WNO MEMBER WIJTIES. 20 10 0 20 40 SILT R TO BE eR PLACE OYMNO ObWTId a OJERLOT pUOPT REMOVE MIDI TO SIIBBAY MSTAwTRON t PAYING OPERATIOIIS ROTOR W NUT SHEET now, UNDER PAYtmIT eI:TENTIDN DETAI SCALE, V • 20' EROSION comma NOTES: 1) The City Stormwater, Department erosion control inspector must be notified at least 24 hours prior to: any construction on this site. 2) All required SNIPS shall be installed prior to any land disturbing octivity j c:, (stockpiling, stripping, grading, etc). All of required erosion control measures must p rn be installed t (Ile appropriate time in lM1e COn9Ir11 [lion 9egU<nC< 03 in divot <tl Irl the approved project Kch<dule, construction plans, and erasion control report I Lc ra O m a 3) Pre -disturbance vegetation shall be protected and retained wherever possible. U a G Removal or disturbance. at existing vagelolion shall be limited to the area required }� C ry Od- for immediate construction operations, and for the shortest practical period of time. U l- 0 All soils exposed during land activity (stripping, eroding, utility C o 0 ti 2 m y rn in stocetc.) shall by Riling, etc.) shall be kept N a rouon, then �.N Q ripping or along; per ripping disking along land contours until mulch, vegetation, tr other permanent or N C 0 S t W ntolI. erosion cannel is in.toll.d.la No soils in areas Outside project street right) Of way CD ' � I� > G. LL shall remain exposed by land activity for more than thirty (30) tloys before required temporary Or p permanent erosion (e.g. seed/mulch, mess of etc. is installed. unless otherwise approved by approved lanthe �epOrimen Staying, the StormWaler t. , 5) The properly must be watered and maintained of all times during construction ,w I� activities ea as to prevent wind-coused erosion. All land disturbing activities east be ` Immediately discontinued "an fugitive dust impacts adjacent properties, as determined by the City Engineering Department. 6) All temporary (structural) erosion control measures must be inspected and W doffer each runoff event every 14 days in Or r,. order t Order continued p for ante assure continued performance of their surfaces. function. retained O n shalaAll slspaxe le, Particularly a those on Dowd roadway surfaces. cau shall removed and manner dlaposed of in a manner and location so as not !o cause their release into any r > m droinogeway. 7) No soil stockpile shall exceed ten (10) feet In height. All sail stockpiles shall be Protected from sediment tmnspwt by surface roughening, watering, and perimeter sip fencing. Any sail stockpia remaining otter 30 days shell be seeded and mulched. 8) City Ordinance prohibits the tracking, dropping, or depositing of soils or any other material onto city street$ by Or from any vehicle. Any inadvertent deposited material Shall be cleaned immediately by the contractor. Z O N W K LEGEND, 1 11111111 = _ = = = _ = CMSTING PIPES -..._..-4905 - -. ••_ ELSTWG 5' CONTOUR EMSTWG ICONTOUR -,go- PROPOSED 5' CONTOUR PROPOSED t' CONTOUR A3 DESIGN POINT BASIN CRITERIA 4�EEAREA 10 WR RUNOPE CEROnOENT M ACRES ^ nos ORECnw as as wo As wo WW as BASIN BOUNDARY ®—SF—SF— SILT FENCE ® �:•Y VENICLE TRACKING PAID ® El CONCRETE WASIrOUT AREA OROOK YYX IP r0 INLET PROTECTW CONSTRUCTION SEQUENCE eeeeeeeon e -----_--- - ------------ --- -------- --- -------- ---- ------- -41.111-1 --------- -- ------------ --------ILO--- ------------ ----__==---- ------------ --------- -- Milli --------- -- --------- -- MM mm ------ — — -- City of Fort Collins, Colorado UTILITY PLAN APPROVAL APPROVED: ntr Env^.- oat. CHECKED BY: Welw a AwAr l.r alxlly INKY CHECKED BY: Sldm.... WFily Do\. CHECKED BY: PVY. s Rgw1iM pp(. CHECKED BY: iroih Engiyer PAU, CHECKED BY: Oat. V p Y Y , O_ m de II d IN a so a C y U CH a y W a C1 UI O O RE N a R•�:p AO z ute 22 laahV -OC . Z Q J = Of. r J AWW o W � a Z N C) U J Z W U N W Of W T 0 Q Z r Q 0_' SHEET 5 5 OF 8 No. 350-01 PROJECT in 0 vision �■■■■■� ♦ . ■..... ■■■■■■■now �� ■ �....... m . ■■ ■■■■■■■�� VICINITY MAP APPENDIX A VICINITY MAP A 7. REFERENCES City of Fort Collins, "Storm Drainage Criteria Manual", (SDCM), dated March, 1986. 2. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria Manual", Volumes 1 and 2, dated March, 1969, and Volume 3 dated September, 1992. 13 All computations that have been completed within this report are in compliance with the City of Fort Collins Storm Drainage Design Criteria Manual and the Canal Importation Master Drainage Plan. The site was removed from the City regulatory 100 year Canal Importation Basin floodplain by the waiver process which was justified based on the information contained in the "As -Built Design Summary & Floodplain Modeling report for Canal Importation Ponds and Outfall" by Ayres Associates dated February 2013. Since the property was removed from the floodplain, there will be no Chapter 10 compliance issues. 6.2 Drainage Concept The proposed drainage concepts presented in this report and on the construction plans adequately provide for conveyance of runoff to the detention areas. Conveyance elements have been designed to pass required flows and to minimize future maintenance. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Permit would be required. 12 5) Waste Management and Disposal: Portable toilets will be anchored & periodically maintained by waste management company. Dumpsters on site will be covered & periodically emptied by waste management company. Concrete waste will be allowed to harden and then will be removed from site. No washing activities will occur on site. Location of the concrete washout is shown on the site map. The washout will be sufficiently deep to accommodate all anticipated concrete truck wash water. Waste concrete will be allowed to harden and be removed from site periodically as the washout reaches 50% of its capacity. Truck wash water will not be allowed to reach the curb & gutter or any other water course. 6) Groundwater and Stormwater Dewatering: No groundwater was encountered during soils exploration therefore ground water is not _anticipated to be an issue. If groundwater is encountered a groundwater discharge permit shall be obtained and a detailed report shall be completed describing the location and the route of where pumped groundwater will be conveyed and the measures taken to prevent the transport of any pollutants to downstream waters. 7) Inspection & Maintenance: It is required that routine site inspections are performed to effectively address maintenance and repair of Best Management Practices (BMP's). The site inspections are to performed by the contractor or an inspector designated by the administrator at a minimum of once every fourteen (14) calendar days on active construction sites and after any significant storm event (an event causing runoff). As part of the site inspections the inspector is required to keep documentation of all inspections and BMP maintenance, including an updated Site Map indicating new BMP's or the removal of BMP's since the previous inspection. Any maintenance, repair, or necessary installation of BMP's that are noted during the inspection must be completed within seven (7) calendar days from the date of the inspection. 6. CONCLUSIONS 6.1 Compliance with Standards 11 2 Materials Handling and S ill Prevention: g of -aria yea �:, Materials Handljng &Spilt r e Eater �.M M' �� h A 1t �Ap rmamatetlocationU site ^'�eSY t r E1RPlwable to thas NVN& w6�� P.reventromBivlP� ,� ; a Project Portable toilets, anchored & Contractor to determine X located away from drainages Fuel storage located in bulk tanks with secondary containment & spill kit Mobile fueling performed at least 200 feet away from drainages & Contractor to determine X fully attended Fertilizers, form oil, solvents, cleaners, detergent stored in 55 gal Contractor to determine X or smaller containers, kept in storage units Dumpsters containing used chemicals containers & liquid Contractor to determine X wastes kept covered Equipment cleaning (on site) uses no detergents & flows to onsite retention basin In case of a release of fuel or other chemicals, absorbent booms or earthen berms will be immediately Location of spill X constructed to contain the spill & prevent runoff to adjacent surface waters MSDS sheets for onsite chemicals will be kept at the construction Contractor to determine X trailer to facilitate spill response & cleanup 3) Dedicated Asphalt or Concrete Batch Plant: Not proposed with this development 4) Vehicle Tracking Pad: Vehicle tracking control pad shall be installed wherever construction vehicle access routes intersect paved public roads. Vehicle tracking control pads shall be installed to minimize the transport of sediment (mud) by runoff or vehicles tracking onto the paved surface. Any mud tracked to public roads shall be removed on a daily basis and after any significant storm that causes sediment to be transported. It is unlawful to track sediment/mud onto public streets and may be enforced by the City of Fort Collins or by the State of Colorado. 10 5.5 BMP Implementation 1) Phased BMP Implementation BMP's are expected to change as the construction progresses and it is the responsibility of the contractor to ensure appropriate BMP's are in place and/or removed at the appropriate time in the construction sequence. A construction sequence schedule has been included on the Drainage & Erosion Control Plan and included in the construction plans for this site. All BMP's shall be inspected and repaired or replaced as required to satisfy the conditions of the Stormwater Discharge Permit. All BMP's must be maintained and repaired as needed to assure continued performance of their intended function. Refer to Appendix D for BMP Implementation Schedule Refer to Appendix D for BMP Estimated Costs 9 Non -Structural Practices for Erosion and Sediment Control: Soils exposed during the earthwork phase and landscape prep phase shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control is installed. No large amount of soils (in excess of 15 yards) will be allowed to be stock piled on site. Overburden from the utility pipe trenching will be piled adjacent to trenches upstream of sediment controls and will be replaced in the trenches within 72 hours. Excess excavated materials from the demolition and grading phases of the project that cannot be reused on site will be exported as it is excavated. This includes any asphalt pavement from the existing site that is to be removed. A vehicle tracking pad will be installed at a location most beneficial to the site construction as determined by the contractor. Vehicles will not be permitted in the excavated area if soil is muddy. Gravel sub base will be placed and compacted in the areas indicated for pavement following excavation. In the current pre construction state the site enables tracking of silt onto the adjacent streets during wet conditions. During construction activities the street will be monitored for foreign debris tracked out of the site and mechanical sweeping and clean up will be performed as needed. No area shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed. Temporary & Permanent non-structural BMP's: _ �. on Structural �n�z Appoxtmate A l�cable this poaect BMP; ¢ location on srte r gym` Surface roughening Entire site X Soil stockpile height limit (less than 10') Perimeter vegetative butler West boundary of site X Minimization of site disturbance Mulch Seed & mulch stockpiles after 30 days Stockpile toe protection (silt fence, wattles or ditch) Preservation & protection of West boundary of site X existing vegetation & trees Good site housekeeping (routine Entire Site X cleanup of trash & constr debris) Heavy equip staged on site, properly maintained & inspected Staging area X daily (no onsite maintenance) 8 5.4 Best Management Practices (BMP's) for Stormwater Pollution Prevention Structural Practices for Erosion and Sediment Control Structural practices for the site will consist mainly of silt fence and rock sock filters and are described in detail in the following paragraphs. These BMP's are expected to change as the construction progresses and it is the responsibility of the contractor to ensure appropriate BMP's are in place and/or removed at the appropriate time in the construction sequence. All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. Silt fence and rock sock filters shall be in place prior to.commencement of construction activities. During clearing and grubbing necessary for silt fence installation, all cleared material shall be placed on the uphill side so that if erosion occurs from the cleared material, the sediment will be trapped and not transported downstream. Rock socks shall be implemented in the existing curb line as shown on the Drainage & Erosion Control Plan. All BMP's shall be installed per the details shown on the construction plan set. Temporary & Permanent Structural BMP's: St utural BMP�a . -" s f, Approx�imaCe location on site a�aa 4 Applicable to thtsE Project rt+ 4; Z Silt Fence Site perimeter, refer to site map X Straw bale dams Rock Socks At proposed sidewalk culverts, refer to site map X Earthen diversion dams Vegetated swales Sediment trap/pond Pipe slope drains Geogrid Inlet/outlet protection Culverts Riprap Erosion control mats Inlet protection 7 5.2 SWMP contact information Permit holder: Name: Address: Phone Number: Email Address: Appointed agent: Name: Address: Phone Number: Email Address: 5.3 Identification and location of all potential pollution sources Potenttial PPbllutdht-Source�A�ctti°ity � �� h�.i a. gPotenttal`Pollptant GeneratedAppcable � 34`'0 Sri srs . %a=Ti^^°maL4 v...ua Xa=ry h. tom prOJOet y Disturbed Areas Sediment X Soil stockpiles Sediment X Travel to adjacent public streets Tracked sediment X Contaminated soils Sediment, chemicals Loading and unloading chemicals Chemicals Outdoor storage of chemicals Chemicals On site equipment maintenance Oil, grease On site equipment fueling Diesel, gasoline X Dust generating activities Particulates, sediment X Use of fertilizer, pesticides, herbicides Fertilizer, pesticides Use of detergents, solvents, oils Detergents, solvents, oil X Waste dumpsters, waste piles Chemicals X Concrete washout Concrete, sediment X On site equipment washing Detergents, oil On site asphalt batch plant Asphaltic cement, sediment On site concrete batch plant Cement, sediment Portable toilets Domestic sewage X 5. STORMWATER MANAGEMENT CONTROLS. 5.1 Written Analysis The soils on this site are classified by the USGS Soil Survey as Altvan-Santana Loams and are classified in the hydrologic group B. The soils are described as being well drained and having a moderately high to high ability to transmit water (0.6 to 2.0 inches per hour). The geotechnical report indicates that the soils on site have a porosity as high as 108 feet per day. The rainfall and wind erodibility is deemed to be moderate. The site is. surrounded by developed sites including streets and paved areas. The construction shall utilize silt fence around the perimeter to control sediment transport from rainfall and from wind. The silt fence that is located in the proposed pavement areas will be removed prior to placing new pavement. Rock socks will be utilized in the existing curb to capture sediments that are not fully contained by the silt fence placement. The locations of the rock socks will be in the areas of concentrated flow such as the existing curb and on the existing concrete sidewalks. The site may also utilize a vehicle tracking control pad to minimize sediment from being tracked onto adjacent pavements. Sediment that is tracked will be removed and placed within the site or permanently disposed of offsite. A concrete washout will be used on site during the concrete placement. All hardened concrete will be disposed of offsite. These BMP's have not been located on the site map due to the fact that the site is very small and these BMP's will need to be placed by the contractor in locations that are most beneficial and will minimize disruption of adjacent traffic. Permanent erosion control consists of covering the soils with a building, concrete walks, concrete drives and sod. No soil will be left exposed to erosion after the construction is complete. Refer to the landscape plan for areas of and instructions for placement of sod and soil amendments required prior to placement of soda Refer to Appendix D for the timing of the construction phases and the sequential installation of all BMP phasing for this site. Refer to the end of Appendix D for the Erosion Control Surety calculations. 5 Basin I encompasses the majority of the proposed development including the entire building, parking lot, private drives and the landscaping on the west side of the site. A majority of the runoff flows to the parking lot in the south half of the site which will convey the flows beneath the parking lot to the proposed detention pond. This detention pond will have a small release rate (0.45 cfs) which equate to the 2 year undeveloped runoff. The water quality extended detention is incorporated into the subsurface detention system. The detention system will have an overflow to the east along the private drive that extends into the adjacent property. This site is being developed under the City criterion that requires that 25% of the site pavements be pervious. This site has approximately 21,950 square feet of proposed parking lot pavement on site which is entirely within Basin 1. Of the 28,700 square feet, 25% of this area would equate to 5490 square feet of required pervious pavement and with this proposed development, approximately 5650 square feet of pervious pavements are being proposed and will be located in the parking spaces as shown on the grading and drainage plan. 4.3 Drainage Summary All runoff from this site and the adjacent sites will be safely conveyed via surface flow to the detention pond. The site will generally conform to the Canal Importation Master Drainage plan which this site is included in. The City of Fort Collins will be responsible for maintenance of the existing storm drainage facilities located within the right-of-way. The drainage facilities located outside of the right of way (including the detention pond) will be maintained by the property owner. 4 3.3 Hydrologic Criteria Runoff coefficients calculations were prepared for the 2 and 10-year minor and 100-year major storm frequency utilizing the rational method. Detention is proposed on site under the parking lot with a release rate equal to the 2 year historic runoff rate. The amount of detention provided under the parking lot was based on an assumed porosity of the chosen aggregate of 0.4. 3.4 Hydraulic Criteria The onsite collection system is 4" perforated pipe which is collect in a larger pipe and conveyed to the outlet point with a restriction to the historic runoff rate. An inlet is located in the parking lot which will act as a collection point if the porous pavements cannot intercept all of the site runoff. Sizes for the inlet and pipes have not been calculated as the amount of runoff expected in these conveyances are difficult to predict. Stormwater will also infiltrate into the groundwater as indicated by the geotechnical report, portion of which are included in the appendix. 4. DRAINAGE FACILITY DESIGN 4.1 General Concept The runoff from this site will flow into the parking lot which will be constructed using 75% conventional materials (asphalt or concrete) and 25% porous pavement (concrete or pavers). The runoff from the site will enter the subsurface material (3/4" poorly graded angular rock) via the porous pavements. In a situation where the porous pavements are clogged, the runoff will flow to the proposed inlet in the southeast corner of the site and enter the subsurface material. A small amount of flow from the patio on the north is anticipated to enter West Elizabeth Street without detention. No offsite flows will enter this site. 4.2 Specific Flow Routing A summary of the drainage patterns within each basin is provided in the following paragraphs. 3 on the information contained in the "As -Built Design Summary & Floodplain Modeling report for Canal Importation Ponds and Outfall" by Ayres Associates dated February 2013. Since the property was removed from the floodplain by the waiver process, there will be no Chapter 10 compliance issues. 2.2 Sub -basin Description This site was included in the "Final Drainage Report for Diamond Shamrock Gas Station, Convenience Store and Car Wash, Lot 2 Fairview Shopping Center II" by Galloway, Romero & Associates dated February 6, 1989 and revised May 16, 1989. Portions of this report are included in the Appendix. 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations This report was prepared to meet or exceed the "City of Fort Collins Storm Drainage Design Criteria Manual' specifications. Where applicable, the criteria established in the "Urban Storm Drainage Criteria Manual" (UDFCD), developed by the Denver Regional Council of Governments, has been used. 3.2 Development Criteria Reference and Constraints The runoff from this site has been routed to maintain the same patterns as previously established. The site is restricted to a 2 year historic release rate with this development. The historic condition for this site is an undeveloped condition without regard to the previous development condition. The runoff from the entirety of the site, including the entire proposed building, will be directed to the parking lot where the water will enter the under parking lot detention area via the proposed porous pavements or via an inlet proposed near the southeast corner of the site. The release rate for the detention pond has been calculated to be 0.45 cfs which is equivalent to the 2 year historic runoff rate for this site in an undeveloped condition. The detention pond will release to the north into an existing storm manhole as the site previously has done. 1. GENERAL LOCATION AND DESCRIPTION 1.1 Location The site is located on the Lot 20, Block 11 Fairview 9h Filing in the Southeast'/4 of Section 15, Township 7 North, Range 68 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. The address of the existing site is 1501 West Elizabeth Street. See the location map in Appendix A. The project is located on the south side of West Elizabeth Street between South Bryan Avenue and City Park Avenue. The project is bounded on all sides by existing commercial development. 1.2 Description of Property The entire site consists of approximately 1.46 acres of land. The land was previously developed with a c-store and car wash which were destroyed in a fire. The buildings have been removed from the site but some pavement and utilities currently remain on the site. The site currently drains to a detention pond on the south portion of the site. Slopes on site range from approximately 1% to 2%. This site is currently located in the City regulatory 100 year Canal Importation Basin floodplain but will be removed in conjunction with this proposed development via the City Floodplain Waiver process. This project will include the development of a single building that has commercial and retail on the main floor and residential units on the upper floors located in the north half of the site. There will be private drives, parking and landscaping on the remainder of the site. The site will provide detention storage under the parking lot with a combination of infiltration and collection in a system of perforated pipes. 2. DRAINAGE BASINS AND SUB -BASINS 2.1 Major Basin Description The proposed development lies within the Canal Importation Drainage Basin. The site is also located in a 100 year floodplain. With this proposed development, an application for a City Floodplain Waiver was approved to remove this site from the 100 year floodplain (refer to Appendix E for a copy of this approved waiver). The waiver was justified based TABLE OF CONTENTS .. TABLE OF CONTENTS............................................................................................................... ii� GENERAL LOCATION AND DESCRIPTION 1.1 Location...................................................................................................................1 1.2 Description of Property ............................................................................................I 2. DRAINAGE BASINS AND SUB -BASINS 2.1 Major Basin Description..........................................................................................1 2.2 Sub -Basin Description.............................................................................................2 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations..............................................................................................................2 3.2 Development Criteria Reference and Constraints...................................................2 3.3 Hydrologic Criteria..................................................................................................3 3.4 Hydraulic Criteria....................................................................................................3 4. DRAINAGE FACILITY DESIGN 4.1 General Concept.......................................................................................................3 4.2 Specific Flow Routing.............................................................................................3 4.3 Drainage Summary..................................................................................................4 5. STORMWATER MANAGEMENT CONTROLS 5.1 Written Analysis.....................................................................................................5 5.2 SWMP Contact Information...................................................................................6 5.3 Identification and location of all potential pollution sources..................................6 5.4 Best Management Practices (BMP's) for Stormwater Pollution Prevention ........... 7 5.5 BMP Implementation...............................................................................................9 6. CONCLUSIONS 6.1 Compliance with Standards..................................................................................12 6.2 Drainage Concept..................................................................................................12 7. REFERENCES..................................................................................................................13 APPENDICES A Vicinity Map B Hydrologic Computations C Detention Pond Calculations D BMP Schedule and Cost Estimate E Floodplain Waiver F Excerpts from Other Reports ftti North Star design 700 Automation Drive, Unit I Windsor, CO 80550 Phone:970-686-6939 Fax:970-686-1188 January 29, 2014 Glen Schlueter City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522-0580 RE: Final Drainage and Erosion Control Study for 1501 West Elizabeth Street Dear Glen, I am pleased to submit for your review and approval, this Final Drainage and Erosion Control Study for 1501 West Elizabeth Street. I certify that this report for the drainage design was prepared in accordance with the Master Plan and the criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, CM Patricia Kroetch, P.E. '.,'i%p: ����4iuiupt llI it FINAL DRAINAGE AND EROSION CONTROLSTUDY 1501 WEST ELIZABETH STREET Prepared for: Jim Hillhouse Hillhouse Architects Windsor, CO 80550 Prepared by: North Star Design, Inc. 700 Automation Drive, Unit I Windsor, Colorado 80550 (970)686-6939 January 29, 2014 Job Number 350-01