Loading...
HomeMy WebLinkAbout520 SOUTH LOOMIS ACCESSORY BUILDING - FDP - 14-06/A - CORRESPONDENCE -If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely, Shelby So mer City Planner Page 2 i. �i STAFF PROJECT REVIEW ON of Fort Collins CHARLES & BEVERLY KOHL Date: 08/23/2006 2037 ANGELO DRIVE FORT COLLINS, CO 80528 Staff has reviewed your submittal for 520 SOUTH LOOMIS ACCESSORY BUILDING PDP -TYPE I AND FINAL PLANS, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Shelby Sommer Topic: General Number: 47 Created: 8/21 /2006 [8/21/06] The floor area calculations on the elevations page are just for the half story, correct? Please revise so this is clear, and also note what building materials are proposed (these were originally listed on the not -to -scale cross section that needed to be removed for clarity). Topic: Mylars Number: 48 Created: 8/21 /2006 [8121/06] The plans are ready to be printed on mylar after a few minor changes are made. First, our Technical Services department would like to see the Grading & Erosion Control Sheet separated out as a "utility plan" for filing purposes. Please place the title "Utility Plans For' above the 520 S. Loomis title, and then place the legal description underneath the title. Also, remove the structural engineering stamp, and renumber the page to 1 of 1. Finally, please add the owner's phone number and the titles Owner and Developer to both the Kohl's information and Thomas & Thomas, respectively. The numbering on the site plan and on the elevations should be changed to 1 of 2 and 2 of 2 (see redlines for details). Number: 49 Created: 8/22/2006 [8/22/06] Please print out one copy of each revised page on mylar, with the owner's signature block signed and notarized in black ink. I will get the signature for the director of planning, and your project engineer will get signatures for our City Engineer and Stormwater Utility department. Once the mylars have all of the appropriate signatures, your project engineer (Randy) will ask you to make copies of the mylars for distribution. Once all copies have been distributed and verified, you will be ready to get your building permit. Department: Engineering Topic: General Number: 46 [8/21/06] Ready for mylar. Issue Contact: Randy Maizland Created: 8/21 /2006 Page 1