HomeMy WebLinkAbout520 SOUTH LOOMIS ACCESSORY BUILDING - FDP - 14-06/A - CORRESPONDENCE -If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6750.
Sincerely,
Shelby So mer
City Planner
Page 2
i.
�i STAFF PROJECT REVIEW
ON of Fort Collins
CHARLES & BEVERLY KOHL Date: 08/23/2006
2037 ANGELO DRIVE
FORT COLLINS, CO 80528
Staff has reviewed your submittal for 520 SOUTH LOOMIS ACCESSORY
BUILDING PDP -TYPE I AND FINAL PLANS, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Shelby Sommer
Topic: General
Number: 47 Created: 8/21 /2006
[8/21/06] The floor area calculations on the elevations page are just for the half
story, correct? Please revise so this is clear, and also note what building materials
are proposed (these were originally listed on the not -to -scale cross section that
needed to be removed for clarity).
Topic: Mylars
Number: 48 Created: 8/21 /2006
[8121/06] The plans are ready to be printed on mylar after a few minor changes are
made. First, our Technical Services department would like to see the Grading &
Erosion Control Sheet separated out as a "utility plan" for filing purposes. Please
place the title "Utility Plans For' above the 520 S. Loomis title, and then place the
legal description underneath the title. Also, remove the structural engineering
stamp, and renumber the page to 1 of 1. Finally, please add the owner's phone
number and the titles Owner and Developer to both the Kohl's information and
Thomas & Thomas, respectively. The numbering on the site plan and on the
elevations should be changed to 1 of 2 and 2 of 2 (see redlines for details).
Number: 49 Created: 8/22/2006
[8/22/06] Please print out one copy of each revised page on mylar, with the owner's
signature block signed and notarized in black ink. I will get the signature for the
director of planning, and your project engineer will get signatures for our City
Engineer and Stormwater Utility department. Once the mylars have all of the
appropriate signatures, your project engineer (Randy) will ask you to make copies of
the mylars for distribution. Once all copies have been distributed and verified, you
will be ready to get your building permit.
Department: Engineering
Topic: General
Number: 46
[8/21/06] Ready for mylar.
Issue Contact: Randy Maizland
Created: 8/21 /2006
Page 1