HomeMy WebLinkAboutFRONT PORCH PROPERTY, 1234 W. PROSPECT ROAD - PDP - 5-06 - CORRESPONDENCE - (4)Number: 15 Created: 3/30/2006
[3/30/061 WATER SUPPLY: A fire hydrant is required. Minimum flow and spacing
requirements are 1,500 gpm at 20 psi residual pressure, not more than 300 feet from the
structure. There is an existing fire hydrant is located on the south side of the street east of
the property within 300' of the property.
Number: 16 Created: 3/30/2006
[3/30/06] ACCESS: The private drive from Prospect Road to the structure shall be an all-
weather surface (asphalt or concrete), capable of supporting fire apparatus weight.
Acknowledged. Acknowledged. As shown on the plans, the driveway will be asphalt.
Department: Stormwater-Water-Wastewater Issue Contact: Basil Harridan
Topic: Stormwater
Number: 12 Created: 3/28/2006
[3/28/06] The additional increase in impervious area is less than 1000 square feet, no
detention or water quality required.
Acknowledged.
Topic: Water/Wastewater
Number: 13 Created: 3/28/2006
[3/28/06] No Comments.
Acknowledged.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: ZONING
Number: 2 Created: 3/8/2006
[3/8/06] handicap parking space needs to be 16 wide and signed as van accessible as well
as handicap accessible. Acknowledged. Has been changed on plan.
Number: 3 Created: 3/8/2006
[3/8/06] In the Project Notes section, make mention that trash will be picked up curbside
weekly - etc. It is noted in the Planning objectives letter, but also needs to be on the site
plan itself. Acknowledged. This has been added to notes.
Be sure and return all of your reclined plans when you re -submit. We did not receive any
redlines for this project.
Page 5
Number: 25 Created: 3/31/2006
[3/31/06] Please confirm that no more than 750sf is draining across the public sidewalk.
The Grading has been revised such that the driveway and parking lot drainage will flow to
the proposed sidewalk chase drain and, therefore, will not flow across the public sidewalk.
Topic: Pavement Management
Number: 17 Created: 3/31/2006
[3/31/06] Rick Richter with Pavement Management has reviewed your project and has no
concerns. Acknowledged.
Topic: Scanning
Number: 26 Created: 3/31/2006
[3/31/06] See Appendix E6 for all scanning requirements. For instance, the shaded areas
will not scan. Acknowledge. We have removed the shading.
Number: 27 Created: 3/31/2006
[3/31/06] Please provide details 701, 702, 1601, 1602 and 707. Per our discussion with
Susan Joy on April 6th. these details will not be required.
Topic: Technical Services
Number: 18 Created: 3/31/2006
[3/31/06] J.R. Wilson with Technical Services has no comments as there is no plat with this
project.
Topic: Traffic Study
Number: 23 Created: 3/31/2006
[3/31/06] Has Eric Bracke with Traffic Engineering waived the Traffic Study or is it still
required? If still required, please provide a copy of it to the Engineering Dept.
Eric Bracke has waived the traffic study.
Department: Light & Power Issue Contact: Doug Martine
Topic: Light & Power
Number: 1 Created: 3/6/2006
[3/6/06] The existing electric utility system is designed for a maximum service to this
property of 125 amps. If additional power is required, contact Light & Power Engineering to
determine the electric development and system modification charges that will apply. The
owner will need to contact the Utility Billing office (221-6785) to change the electric rate from
residential to commercial. Acknowledged. No additional power will be required.
Department: Natural Resources Issue Contact: Doug Moore
Topic: General
Number: 5 Created: 3/9/2006
[3/9/06] No issues.
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 14 Created: 3/30/2006
[3/30/06] ADDRESS: Address numerals shall be visible from the street fronting the property,
and posted with a minimum of six-inch numerals on a contrasting background. (Bronze
numerals on brown brick are not acceptable). Acknowledged. To be shown on ID Sign.
Page 4
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 19 Created: 3/31 /2006
[3/31/06) Place a note on the cover sheet: See Appendix E1 and E2 of the Larimer County
Urban Area Street Standards for other requirements. Acknowledged. Note has been added
to Site Plan notes.
Number: 20 Created: 3/31/2006
[3/31/06] Dimension all row from centerline. Show, label and dimension all easements.
Show all utilities. Acknowledged. We will correct for final compliance.
Number: 21 Created: 3/31 /2006
[3/31/061 As stated at the Conceptual Review, parking setbacks apply in accordance with
figure 19-6. Minimum parking setback for this project is 50' from flowline and it appears to
effect the first parking spot. You can either remove the spot entirely or move the parking
stalls north to meet the standard. Acknowledged. Parking spaces have been moved north
to accommodate a 50' offset from the flowline.
Number: 28 Created: 3/31 /2006
[3/31/06] Please contact Matt Baker at 221-6605 for the repay owed for the Prospect Road
improvements. This amount will be added into the Development Agreement and due prior
to starting work. Acknowledged. Discussed with Matt Baker.
Number: 29 Created: 3/31 /2006
[3/31/061 This driveway must be rebuilt in accordance with drawing 707 (radial curb returns,
minimum 24' width and maximum grades apply). Acknowledged. Per our discussion with
Susan Joy on Thursday April dh , A letter of intent will be drafted by the owner and delivered
to the neighboring property owner to the west. Pending their approval, the shared drive will
be paved with asphalt to meet the 24' width. We will be using existing curb cuts and will not
be required to rebuild the existing sidewalk and return radii.
Number: 30 Created: 3/31 /2006
[3/31/06] The project ID sign may not be located within the 15' utility easement.
Acknowledged. Sign has been moved.
Topic: Grading
Number: 22 Created: 3/31 /2006
[3/31/061 Provide spot elevations at the flow line, property line and grade information.
Maximum grade allowed for a driveway is 8%. See detail 707 for all other grade
requirements.
See Grading Plans, spot grades have been provided. According to Susan Joy(April 6"
meeting) the 8% maximum grade is only applicable for the first 20 feet of driveway past the
ROW. The current grading plan meets this criteria.
Number: 24 Created: 3/31 /2006
[3/31/06] Please provide spot elevations for TOW and BOW along the proposed concrete
wall.
See Grading Plans, spot grades are provided.
Page 3
City Comments (dated 03/31/06)
ISSUES:
Department: Current Planning Issue Contact: Shelby Sommer
Topic: General
Number: 6 Created: 3/20/2006
[3/20/06] See the Building Department comment sheet for Building Code details.
Acknowledged
Number: 7 Created: 3/20/2006
[3/20/06] It appears that the existing garage and carports are going to be used for additional
parking. If this is the case, you have exceeded the maximum number of spaces allowed for
a general office use. Please indicate on the site plan if the garages are for storage only.
Otherwise you will need to pursue an exception to the General Office Parking Standard, per
Section 3.2.2(K)(4). Acknowledged. The existing garage will be used for storage purposes.
A lane to the garage is provided for access to storage area. The carport will not be used for
vehicular purposes.
Number: 8 Created: 3/20/2006
[3/20/06] How high is the proposed retaining wall on the west property line? What sort of
materials are going to be used? And the fence above the retaining wall? See Grading Plans
for details on curb wall. The highest point on the curb wall is 1'-0". This grade difference is
not next to the drive. The grade change occurs on the west side of the curb to meet existing
grade. The curb wall will be concrete. The fence will be disassembled before construction
of the curb wall. Once the curb wall has been constructed the fence will be reinstalled on
the low side of the wall, along the property line.
Number: 9 Created: 3/20/2006
[3/20/061 Please plant a landscape buffer along the east side of the walkway (across from
the parking stalls) to screen/shield the cars' headlights for the neighbor to the east.
Acknowledged. Landscape screen has been added to plans for parking area.
Number. 10 Created: 3/22/2006
[3/22/06] Rick Lee (Building Department): Please find attached the various codes that the
Fort Collins Building Department will enforce. The information submitted is very limited and
we require that a pre -submittal meeting be scheduled before the Construction Documents
proceed too far. For a change of occupancy (residence to office) the more challenging code
components are accessibility and structural capability. We need to get into the building with
a wheel chair and use a toilet room. The first parking stall shall be van accessible which has
an eight foot load -isle not the five feet that you have indicated. The maximum slope for a
ramp is 1:12 or one foot of ramp for every inch of rise. You may want to consider the back
door to be the accessible route using a sloped walk (1:20) rather than a ramp.
Acknowledged. The ADA parking stall has been changed to incorporate van accessibility.
A study has been done to determine the feasibility of access to the rear door. Ramp access
to the front door seems to be a better approach because it is integrated with the proposed
walls so that visibility of the ramp is hidden along the front fagade of the house. There is
also more room to allow proposed grades on the ramp to achieve a maximum of 8% grade,
allowable by Federal ADA regulations. See Grading Plans.
Page 2
April 10, 2006
Shelby Sommer
Current Planning
281 N. College Avenue
P.O. Box 580
Fort Collins, CO 80522
RE: Response to Comments Letter dated 03/31/2006
Shelby,
We have addressed the comments from the March 31, 2006 letter as follows. Please let me
know if you have any questions or comments. We have also included 5 copies of the revised
plans for your review.
We met with Susan Joy on April 61h to discuss her comments. She mentioned that her
comments are primarily final compliance item issues and would not require the drawings to
be revised prior to hearing. We have however addressed most of her comments on the
resubmitted plans.
Thank you,
JIM SELL DESIGN, INC
Matthew J Blakely, A
Project Manager
cc: Don Earls — Front Porch Properties
Paee I