Loading...
HomeMy WebLinkAboutBRINKMAN HEADQUARTERS - PDP/FDP - FDP130050 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTperformance standards will be met. The proposed erosion control concepts presented in this report and shown on the erosion control plan are incompliance with the City of Fort Collins Erosion Control Criteria. ' Erosion Control Escrow Estimate The Erosion Control Escrow Estimate for the subject property is approximately $13,298.00. Please refer to Appendix E for this calculation. R REFERENCES 1. Storm Drainage Design Criteria and Construction Standards by the City of Fort Collins, Colorado, May 1984, Revised January 1997. 2. Erosion Control Reference Manual for Construction Sites by the City of Fort Collins, Colorado, January 1991, Revised January 1997. 3. East Harmony Portion of McClellands Basin 100-Year Master Plan, by Icon Inc., Fort Collins, Colorado, August 1999. 4. Final Drainage and Erosion Control Report, Harmony Technology Park 2nd Filing, by JR Engineering, June 20, 2001. 5. 2004 High School Drainage and Erosion Control Study, Poudre School District R-1, by Nolte Associates, Inc., June 24, 2002. 6. Final Drainage and Erosion Control Report, Harmony Technology Site Master Plan, by Stantec Consulting, May 19, 2008. 7. Final Drainage and Erosion Control Study for Harmony Technology Park Third Filing, by Stantec Consulting, May 19, 2008. 14 C. 0 sediment from the associated items to allow for adequate drainage through the site to the proposed detention facility 2) Sedimentation/ silting shall be removed to allow for adequate drainage along the bottom of the swales and LID pre -sedimentation basins. Grass scrubbing along the bottom of the LID pre -sedimentation basins may be required to remove sediment and promote grass growth. 3) Re -vegetation through the use of Natural Seeding/ Sod shall be provided for disturbed areas and other permanent erosion controls shall be provided for areas where erosion has taken place and requires remediation back to the proposed condition shown in the plans The Stormwater Operating/ Maintenance Procedures listed above are guidelines to the minimum procedures that shall be implemented for the site, with these and additional measures being utilized on an as -needed basis. Drainage Concept The proposed drainage concepts presented in this study and shown on the utility plans adequately provide for the transmission of developed on -site runoff to the existing detention pond, located south of the subject site. The combination of the existing and proposed storm sewer systems will provide for the 100-year developed flows to reach the existing detention pond. The existing release rate of the existing pond will be adhered to. If groundwater is encountered at the time of construction, a Colorado Department of Health Construction Dewatering Permit will be required. Storm Water Quality The final design has addressed the water quality aspect of stormwater runoff. The existing grass -lined detention pond and extended detention will provide an opportunity for stormwater pollutants to filter out of the stormwater runoff before flows are directed downstream. Furthermore, the LID items presented in this report for the proposed site provide for additional water quality and treatment of runoff, prior to flows being directed downstream. Erosion Control Concept Proposed erosion control concepts have been provided for and adequately provide for the control of wind and rainfall erosion from the proposed development. Through the construction of the proposed erosion control concepts, the City of Fort Collins 13 treatment, and because water quality is already provided for in the existing detention pond, porous pavement may not be required for the project. Further analysis will determine the need for'or removal of the porous pavement from the project. The two LID basins, shown and called out in the civil utility plans, provide for approximately 1' of ponding depth, prior to the basins overflowing and spilling south in the storm sewer and into the existing detention pond. Please refer to Appendices C and F, and sheets C-007 and C-012 of the civil utility plans, for details on the LID basins. i VI. EROSION CONTROL A. General Concept The subject site lies within the Moderate Rainfall Erodibility Zone and the Moderate Wind Erodibility Zone per the City of Fort Collins zone maps. The potential exists for erosion problems during construction, but should be minimal after completion of proposed development. Silt fence will be installed along the north, east, south, and west sides of the site to prevent sediment from leaving the site. A tracking pad will also be placed at entrance/exit to the site. Gravel inlet filters will be placed at proposed curb cuts and existing inlet, with straw wattles installed at the proposed storm sewer and inlet outfail points from the site to mitigate the build-up of sediment and transport of debris into existing Pond 110. Riprap and erosion control fabric will also be utilized at concentration points (curb cuts) to minimize erosion and increase soil stabilization. VII. CONCLUSIONS A. Compliance with Standards All computations within this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria. The City of Fort Collins Storm water Utility will not maintain the on -site storm drainage facilities within the subject site. The owners of the subject site will maintain their on -site storm drainage facilities on a regular basis. The following shall be implemented for the private stormwater improvements' operations/ maintenance procedures for the project on an annual or bi-annual basis: 1) Storm Sewer Inlets, pipes and flared -end -sections, curb cuts and concrete sidewalk culverts/chases, structures, manholes, and the water quality/ outlet control structures shall be cleaned through the removal of debris and 12 C. Detention Ponds No detention pond(s) are required for the subject site, as detention and water quality are provided for in the existing detention pond (Pond 110) constructed with the Harmony Technology Third Filing Infrastructure. D. Street Capacities The street capacity calculations are not required for the subject site, as no new public street construction will be built with this project. However, curb cut capacities have been analyzed and calculations provided in Appendix D of this report. V. STORM WATER QUALITY A. General Concept The water quality of stormwater runoff must be addressed on all final design utility plans. Therefore, Best Management Practices for the treatment of stormwater runoff for the subject site, will include grass -lined swales with soft pans, LID pre - sedimentation basins, and the utilization of the existing grass -lined detention and water quality pond south of the site. These water quality features will provide a mechanism for pollutants to settle out of the stormwater runoff before flows are directed to the McClellands Drainage Basin. B. Specific Details Best Management Practices (BMP) for the treatment of storm water runoff have been incorporated into the final design for this project. This will include continued utilization of extended detention in the existing, offsite detention pond, in which the grass -lined pond will trap.sediment, prior to releasing controlled flows downstream. The existing detention facility has adequate capacity and will continue to provide water quality and detention for the developed condition of the subject site, prior to releasing flows downstream. LID measures are provided for through the conveyance of 1.17 acres (of the 1.62 acre total) through the two proposed LID pre -sedimentation basins, with the total footprint of the two combined LID basins being approximately 1,564 square feet, with both LID basins having a depth of approximately 1.0'. The 1.17 acres of area being conveyed to the LID basins account for 72% of the total area, thereby, meeting City's LID treatment of 50% of the site area. It's important to note that because the area being routed to and through the LID basins exceeds the 50% requirement for LID 11 City of Fort Collins. Please refer to the civil utility plans for details on the LID Basin. Basins 12 Basins 12 conveys runoff from the eastern portion of the building (roof) and green area on the east side of the building overland to the east and out into the curb and gutter on the west side of Lady Moon Drive. Three roof drains will be located within basin 12 and will have lambs tongue outfall points to three, 2' wide x 3' long riprap pads. During major storm events, runoff from basin 12 may discharge onto the riprap pads and flow overland to the east and out to Lady Moon Drive. The 1.94 cfs (100- year flow from basin 12) will flow south down Lady Moon Drive and combined with that from Basin 13. Basin 13 Basins 13 conveys runoff from the southwest portion of the building (roof) and green areas on the south side of the building and along the southern property boundary area, south and into the curb and gutter on the north side of Precision Drive. One roof drain will be located within basin 13 and will have a lambs tongue outfall point to a 2' wide x 3' long riprap pad. During major storm events, runoff from basin 13 may discharge onto the riprap pad and flow overland to the south and out to Precision Drive. The 1.69 cfs (100-year flow from basin 13) will flow east down Precision Drive and combine with that from Basin 12, where the flow will turn south. Runoff from basins 12 and 13 will begin to combine with runoff from basin OS 1 of the HTP Third Filing and will be conveyed south along the west side of Lady Moon Drive towards existing design point OS1, where an existing inlet will capture the runoff from basins OS1 and 12-13. Existing Basin 180 (portion of SWMM Basin 100) Existing Basin 180 of the HTP Third Filing is contained within the Masterplan SWMM basin 100. Runoff from Basin 180 will continue to follow its historic flow pattern from the northwest to the southeast. The proposed Brinkman site will provide for an extension of the existing 36" RCP to the north, while also adding a second, 24" RCP extension to the west. The purpose of the 24" RCP extension is to provide an outfall point for future development to the west of the Brinkman site, as the proposed Brinkman site creates two specific natural low point areas: one at the northeast corner of the Brinkman site; and, one at the southwest corner of the Brinkman site. Therefore, the 24" RCP and 36" RCP extensions will provide an outfall for future development, in accordance with the Masterplan for the HTP Campus. Offsite grading will be necessary to provide conveyance of runoff from basin 180 to the outfall points at the proposed 24" RCP and 36" RCP. Please refer to the utility plans for grading details. 10 B. Specific Details Basins 1 Basins 1 conveys its flow overland to the north, then west/ southwest in the proposed soft pan/swale, which consists of a 50150 mix of sand and topsoil and is 2' wide x 1' deep. The soft pan/swale will direct runoff towards a 2' curb cut at design point 1, where runoff from basin 1 will pass through the curb cut and begin to combine with that from Basin 2. Basins 2-6 Basins 2 conveys runoff from a small portion of the roof and plaza area (northwest corner of the building) overland to the west and across the parking lot towards design point 2, where a 2' curb cut conveys runoff into the LID/pre-sedimentation basin. Likewise, basins 3-5 (northwest quadrant of site) convey their runoff overland across the parking lot area towards their respective design points, where 2' curb cuts pass runoff through and into the LID/ pre -sedimentation basin (Basin 6), which is designed to provide a ponding depth of approximately 0.70' to 1.00' and allow pollutants and sediment to settle out of the runoff, prior to spilling south in the proposed storm sewer and into Existing Pond 110. The runoff from basins 1-6 combines in basin 6 (LID Basin) and is directed to a proposed 15" nyloplast drain basin riser with 24" standard H2O grate. A 15" ADS (N-12) pipe will convey runoff southwest and into the proposed 36" RCP storm sewer, which carries flows south and eventually into existing Pond 110. It's important to note that Basin 6 contains the interior portion of the median area and will have special media installed to provide LID treatment, as required by the City of Fort Collins. Please refer to the civil utility plans for details on the LID Basin. Basins 7-11 Basins 7 conveys runoff from a small portion of the plaza area (west -central area of the building) overland to the west and across the parking lot towards design point 7, where a 2' curb cut conveys runoff into the LID/pre-sedimentation basin. Likewise, basins 8-10 (southwest quadrant of site) convey their runoff overland across the parking lot area towards their respective design points, where 2' curb cuts pass runoff through and into the LID/ pre -sedimentation basin (Basin 11), which is designed to provide a ponding depth of approximately 0.70' to 1.00' and allow pollutants and sediment to settle out of the runoff, prior to spilling south in the proposed storm sewer and into Existing Pond 110. The runoff from basins 7-11 combines in basin 11 (LID Basin) and is directed to a proposed 15" nyloplast drain basin riser with 24" standard H2O grate. A 15" ADS (N-12) pipe will convey runoff southwest and into the proposed 36" RCP storm sewer, which carries flows south and eventually into existing Pond 110. It's important to note that Basin 11 contains the interior portion of the median area and will have special media installed to provide LID treatment, as required by the 0 existing detention pond via swales, curb and gutter, and storm sewer inlets and pipe both upstream and downstream of the proposed pre-sedimentation/LID basins. Existing detention Pond 110 provides approximately 7.98 acre-feet of storage for the combination of detention and water quality, while having an allowed 100-year release rate of 15 cfs, in accordance with the Harmony Technology Park Third Filing Drainage Report, by Stantec Consulting, Inc, dated May 19, 2008, and the HTP Site Masterplan Report, by Stantec Consulting, Inc., dated May 19, 2008. It's important to note that existing Pond 110 has been sized to receive the 100-year developed flow from the Brinkman Office Building site (developed imperviousness ratio of 72%), with an allotted overall imperviousness ratio of 80% (from the HTP Site Masterplan Report). The calculated composite 'C' value for Brinkman Office Building is 0.72, which meets the requirements set forth in the previous Masterplan study. Furthermore, the calculated 100-year runoff from the developed site 14.65, compared to the allowable 100-year flow of approximately 14.84 cfs, as calculated using the HTP Masterplan SWMM model of 32.9 acres with a combined flow of 297.7 cfs, providing for 9.05 cfs/acre. Please refer to the rational calculations in Appendix B, and the Drainage Basin Exhibit and HTP Third Filing and HTP Site Masterplan Report excerpts in Appendix F for additional information. It's important to note that an additional 24" RCP has been added and stubbed to the west of the Brinkman site to provide an outfali for future development to the west of ' the Brinkman site. Likewise, the existing 36" RCP, stubbed north of Precision Drive ' today, will be extended north of the Brinkman site to continue to provide an outfall 1 for the historic runoff from existing basin 180 (of the HTP Third Filing Report) and also as an outfall for future development to the north, in accordance with the HTP Site Masterplan Report and SWMM Model. LID measures are provided for through the conveyance of approximately 72% (1.17 acres of the 1.62 acre site boundary) of the proposed building, parking lot, and green areas of the site being routed through the LID basins. Because the area being routed to and through the LID basins exceeds the 50% requirement for LID treatment, and because water quality is already provided for in the existing detention pond, porous pavement may not be required for the project. Further analysis will determine the need for or removal of the porous pavement from the project. The LID basins, shown and called out in the plans, provide for 1' of ponding depth, prior to the basins overflowing and spilling south and into the existing detention ' pond. Please refer to Appendix C and sheet C-012 of the civil utility plans for details on the LID basins. 8 1 i quality and detention for the developed 100-year runoff from the subject site. However, LID improvements are required and have been provided for the project. Please see the LID calculations in Appendix C. B. Development Criteria Reference and Constraints The criteria and constraints from the City of Fort Collins will be met. C. Hydrologic Criteria The Rational Method for determining surface runoff was used for the project site. The 2-year and 100-year storm event intensities were used in calculating runoff values. The City of Fort Collins intensity duration frequency curves were used to obtain rainfall data for each storm specified. Detention pond sizing is not required, as detention and water quality are provided for the subject site in the existing detention pond (Pond 110) from the previous infrastructure improvements of the Harmony Technology Park Third Filing and HTP Masterplan. However, BMP's and LID measures are being incorporated into the proposed drainage development plan, with specific details and calculations shown in Appendices C and F of this report. D. Hydraulic Criteria All hydraulic calculations, including final calculations and sizing for curb cuts, swales, and erosion control and riprap measures have been provided in accordance with the City of Fort Collins Drainage Criteria and can be found in the Appendix. E. Variance No variances are being requested for this project. IV. DRAINAGE FACILITY DESIGN A. General Concept Thirteen drainage basins will provide conveyance of drainage for the 1.62 acre (1.64 acres including ROW that will be dedicated to City FC) site to the existing detention pond (Pond 110), located south of the site. The drainage will be routed to the 7 II. DRAINAGE BASINS A. Maior Basin Description The site lies within the McClellands Basin. The site drainage has been previously accounted for in the Harmony Technology Third Filing drainage study, and the Harmony Technology Park Site Master Plan (HTPMMP). The project drainage will be in conformance to these two studies, as well as the original study completed for the majority HTP site, which can be found in the East Harmony Portion of the McClellands Creek Master Drainage Plan (August 1999). B. Existing Sub -Basin Description 1 1 The existing Brinkman Office Building site is contained within existing sub -basin 180 of the HTP Third Filing, and SWMM basin 100 of the HTP Masterplan report (EX7 of the existing Rational Calculations). Existing basin 180 contains approximately 12.04 acres, and was modeled with the entire 12.04 acres having a'c' value of 0.32, with a 100-year runoff rate of approximately17.37 cfs for the historic condition of the basin. However, the HTP Masterplan Report specifies the Brinkman site being contained within SWMM Basin 100 (32.9 acres) being allowed a 1 developed impervious value up to 80%, with all flow from the Brinkman site being allowed to flow un-detained to the existing detention pond 110, where water quality ( and detention needs are provided for the proposed Brinkman site. Because the Brinkman Office Building site has a combined imperviousness ratio of 72%, the 100- year developed runoff from the site will be conveyed directly to existing pond 110. Please refer to the Third Filing Drainage Report and HTPMSP report for further ' details (excerpts can be found in Appendix F of this report). Please also see the drainage exhibit in Appendix F of this report for the existing basin and the overlapping proposed drainage basins for the subject site. Existing SWMM Basin 100 and Existing basin 180 conveys the majority of its flow overland to the southeast and into the existing 36" FES/storm drain system, which conveys flow south and into the existing detention pond (Pond 110 of the Third Filing report). No other offsite areas contribute overland flow to or through the Brinkman Office Building project site. III. DRAINAGE DESIGN CRITERIA A. Regulations Since the subject site has been previously modeled, the site is allowed to release un- detained to the existing detention pond 110, which has been sized to provide water lei FINAL DRAINAGE AND EROSION CONTROL REPORT FOR THE HARMONY TECHNOLOGY PARK FOURTH FILING FORT COLLINS, COLORADO I. GENERAL LOCATION AND DESCRIPTION A. Location The Harmony Technology Park Fourth Filing (referred to as "Brinkman Office Building" here -forward) is bounded to the north by vacant land within the HTP Campus, to the east by Lady Moon Drive, to the south by Precision Drive, and to the west by vacant land within the HTP Campus. 1 The project site can also be described as situated in the northwest quarter of Section 4, Township 6 North, Range 68 West of the 6"' P.M., of the City of Fort Collins, Larimer County, Colorado. The Brinkman Office Building site is comprised of approximately 1.62 acres. It is important to note that rational calculations within this 1 report provide for approximately 1.64 acres of basin area, to match previous 1 masterplan basin area modeling. However, upon platting of this project and the 1 dedication of 2'of additional right-of-way along the south property boundary, the site 1 boundary will be 1.62 acres. Please refer to the vicinity map in Appendix A for the site location. 1 B. Description of Property 1 The Brinkman Office Building site is comprised of an approximate 30,000 +/-square foot building (contained within two stories) along with associated parking lot, entry plaza and outdoor meeting area, and utility improvements. Previously, the Brinkman Office Building site was fallow agricultural land, with a portion of the lot being ' overlot graded with the construction of the HTP Third Filing roadway and utility ' infrastructure, including a 36" RCP w/ FES storm drain extension for masterplan storm drainage improvements. ' The majority of existing topography of the Brinkman Office site generally slopes ' from the northwest to southeast at approximately 0.90%, with a southwest portion of the site sloping at approximately 3 :1 at the inlet to the masterplan storm drain system. 5 i i i i 1 1 1 1 1 1 1 I I 1 1 1 1 I 1 1 1 APPENDIX PAGE VICINITY MAP A RATIONAL METHOD HYDROLOGY B LID BASIN SIZING CALCULATIONS C CURB CUT, INLET, & SWALE SIZING D EROSION CONTROL & RIPRAP SIZING ; EROSION ESCROW E PREVIOUS REPORT EXCERPTS, PROPOSED DRAINAGE F EXHIBIT w/ EXISTING BASINS SHOWN TABLE OF CONTENTS DESCRIPTION PAGE I. GENERAL LOCATION AND DESCRIPTION 5 A. LOCATION 5 B. DESCRIPTION OF PROPERTY 5 II. DRAINAGE BASINS 6 A. MAJOR BASIN DESCRIPTION 6 B. EXISTING SUB -BASIN DESCRIPTION 6 III. DRAINAGE DESIGN CRITERIA 6 A. REGULATIONS 6 B. DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS 6 C. HYDROLOGIC CRITERIA 7 D. HYDRAULIC CRITERIA 7 E. VARIANCE 7 IV. DRAINAGE FACILITY DESIGN 7 A. GENERAL CONCEPT 7 B. SPECIFIC DETAILS 8 C. DETENTION PONDS 10 D. STREET CAPACITIES 10 V. STORM WATER QUALITY 10 A. GENERAL CONCEPT 10 B. SPECIFIC DETAILS 10 VI. EROSION CONTROL 11 A. GENERAL CONCEPT 11 VII. CONCLUSIONS 11 A. COMPLIANCE WITH STANDARDS 11 B. DRAINAGE CONCEPT 12 C. STORM WATER QUALITY 12 D. EROSION CONTROL CONCEPT 12 E. EROSION CONTROL ESCROW ESTIMATE 13 REFERENCES 13 December 10, 2013 Mr. Glen Schleuter City of Fort Collins Water Utilities --Storm water 700 Wood Street Fort Collins, Colorado 80521 RE: Final Drainage and Erosion Control Report for the Harmony Technology Park Fourth Filing Dear Glen: We are pleased to submit to you, for your review and approval, this Final Drainage and Erosion Control Report for the Harmony Technology Park Fourth Filing. All computations within this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria. We appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Respectfully, Aspen Engineering John Gooch, P.E. Principal Final Drainage and Erosion Control Report for Harmony Technology Park Fourth Filing Fort Collins, Colorado December 10, 2013