HomeMy WebLinkAboutCARGILL EXPANSION - PDP/FDP - FDP130043 - CORRESPONDENCE -Comment Number: 26 Comment Originated: 01/07/2014
01/07/2014: There are line over text issues. See redlines.
Comment Number: 27 Comment Originated: 01/07/2014
01/0712014: Please correct the easement labels. See redlines.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221.6854, rbuffinpton(ftgov.com
Topic: Construction Drawings
Comment Number: 6 Comment Originated: 01/07/2014
01/07/2014: It appears there could be several conflicts between water main and storm sewer
crossings. Provide storm sewer profiles showing crossings and a detail for each water main lowering
that is needed.
Comment Number: 7 Comment Originated: 01/07/2014
01/0712014: Add the tracer wire requirement to Note 2 on Sht 3.
Comment Number: 8 Comment Originated: 01/07/2014
01/07/2014: The connection of the sewer service at the existing manhole must be made with a drop
connection. Add appropriate notes and the drop connection detail.
Department: Zoning
Contact: Peter Bames, 970.416-2355, pbames(Mcgov.com
Topic: Site Plan
Comment Number: 2
Comment Originated: 11/06/2013
12124/2013: The note has been added, but the light pole locations still haven't been shown on the site
plan.
11/06/2013: Show the location of the parking lot light poles on the site plan. Add a note stating that all
building and pole mounted light fixtures will be shielded and down directional.
Page 5 of 5
Comment Number: 3 Comment Originated: 11/21/2013
01/08/2014: Repeat Comment: Please mask text within hatching on sheets 3, 5 & 6. See redlines.
11121/2013: Please mask text within hatching on sheets 3, 5 & 6. See redlines.
Comment Number: 4
Comment Originated: 11121/2013
01/08/2014: Repeat Comment: There is a text over text issue on sheet 5. See redlines.
11/21/2013: There is a text over text issue on sheet 5. See redlines.
Topic: Landscape Plans
Comment Number: 24
01/07/2014: Please remove the "Matchline Sheet 3" from sheet 2.
Topic: Lighting Plan
Comment Number: 9
01/07/2014: No comments.
11/21/2013: No comments.
Topic: Plat
Comment Number: 10
01/07/2014: The new boundary & legal description close.
11/21/2013: The boundary & legal description close.
Comment Number: 12
Comment Originated: 01/07/2014
Comment Originated: 11/21/2013
Comment Originated: 11/21/2013
Comment Originated: 11/21/2013
01/07/2014: Please add a note stating that there are no lienholders associated with the property
shown on this plat.
11/21/2013: Are there any lienholders? If not, please add a note stating that there are none. If there are
or it is unclear if any, please add a signature block. This can be removed later if it is discovered there
are none.
Comment Number: 19 Comment Originated: 11/21/2013
01/07/2014: Please label all unplatted properties. See redlines.
11/21/2013: Please show the adjoining subdivisions to the south of Drake Road.
Comment Number: 20 Comment Originated: 11/21/2013
01/0712014: There is a easement line that doesn't scale. See redlines.
11/21/2013: All easements must be labeled and locatable. See redlines.
Comment Number: 28 Comment Originated: 01/07/2014
01/07/2014: Please correct the distance for the Basis Of Bearings. The distance does not match
between the legal decription and what is shown on sheet 2. See redlines.
Comment Number: 29 Comment Originated: 01/07/2014
01/07/2014: Please change the linework & labels for the marked easements along Drake Road. See
redlines.
Topic: Site Plan
Comment Number: 23
Comment Originated: 11/21/2013
01/07/2014: Please add "Lots 2 & 3", and remove "A tract of land....". See redlines.
11/21/2013: Please add "Cargill Subdivision" to the beginning of the legal description.
Comment Number: 25 Comment Originated: 01/0712014
01/07/2014: Please continue the 15' utility easement shown along the south boundary. See redlines.
Page 4 of 5
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, fivnxwiler0poudre-fire.ora
Topic: General
Comment Number: 4 Comment Originated: 01/07/2014
0110712014: Emergency Access Easements
There are some labeling discrepancies as it pertains to the EAE on various pages of the plan which I
would like to clear up.
> SITE PLAN (updated 12118113): The greenhouse perimeter road on Lot 3 is labeled as'20' asphalt
access drive typ.° when it should be labeled as an EAE and shown as such on the plat.
> CARGILL SUBDIVISION, File Name 2013068SUB; Sheet 2 of 2 (dated 10/30/13) from last round of
reviews: Details a portion of the required EAE in Lot 3. In the last round of comments, the project team
was asked to revisit the required turning radii for fire apparatus in Lot 3.
> CARGILL SUBDIVISION, File name 2013068SUB; Sheet 2 of 2 (also dated 10/30/13) the latest
submitted plans: This page has now been updated to omit the EAE's in Lot 3. Please advise.
Fire access roads are to be within 150' of all portions of any building. At this time, there is no EAE
which fully covers the two most northern greenhouses and as such, places them out of fire access.
Please contact me should you need to discuss this further.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970.218.2932, jschlamMcoov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 11/05/2013
12/31/2013: Erosion Control Plan has redlines 1) Sediment trap can't be replaced with straw wattle. The
pressure head alone from that much water will render straw ineffective at preventing dirt discharges.
Sediment trap was the correct direction but it will need to be effective please include a detail. 2)
Escrow calculations call out for the matting for the steep slopes, please include them on the plan and
the sequence chart. If you need clarification concerning this section, or if there are any questions
please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
11/05/2013: Erosion Control Calculation needs corrections based on the email sent on 11-5-2013.
Redlines should be addressed specifically on 1) An effective sediment trap 2) Steep slope protection.
If you need clarification concerning this section, or if there are any questions please contact Jesse
Schlam 970-218-2932 or email @ jschlam@fcgov.com
Contact: Wes Lamarque, 970.416.2418, wiamaraue(&fcgov.com
Topic: General
Comment Number: 5
Comment Originated: 01/10/2014
01/10/2014: The PDP is ready for a hearing. Another round will be required to provide the LID details
mentioned in our meeting on 1/9114.
Department: Technical Services
Contact: Jeff County, 970.221.6588, 'county@fcoov.com
Topic: Construction Drawings
Comment Number: 2
Comment Originated: 11/21/2013
01/08/2014: Repeat Comment: There are line over text issues on sheets 3, 4, 5, 6 & 7. See redlines.
11/2112013: There are line over text issues on sheets 3, 4, 5, 6 & 7. See redlines.
Page 3 of 5
Comment Number: 6 Comment Originated: 11/22/2013
01108/2014: Drainage easements are needed for the detention ponds that are outside of the plat
boundary. Please submit the easement dedication documents for the drainage easement that need to
be dedicated by separate document. You can contact me for additional information on process to
dedicate easement by separate document or visit hftp://www.fegov.com/engineering/devrev.php
11/2212013: Drainage easements are needed for the detention ponds. See redlines. Please add
drainage easements to the plat.
Comment Number: 13 Comment Originated: 01/08/2014
01/08/2014: See redlines. An 8ft easement on the plat needs to be labeled.
Department: Environmental Planning
Contact: Lindsay Ex, 970.224.6143, lex(a)fccov.com
Topic: General
Comment Number: 1 Comment Originated: 11/21/2013
11/21/2013: No comments.
Department: Forestry
Contact: Tim Buchanan, 970-221.6361, tbuchanan(r-fcgov.com
Topic: Landscape Plans
Comment Number: 3 Comment Originated: 01/06/2014
01/06/2014:
In reference to landscape note number one these are the LUC required tree utility separations.
Forty feet between shade trees and streetlights. Fifteen feet between ornamental trees and streetlights.
Twenty feet between shade and or ornamental trees and traffic control signs and devices.
Ten feet between trees and water or sewer mains.
Six feet between trees and water or sewer service lines.
Four feet between trees and gas lines.
Eight feet away from driveways.
Department: Light And Power
Contact: Doug Martine, 970.224-6152, dmartine(&fcaov.com
Topic: General
Comment Number: 1 Comment Originated: 11/04/2013
11/04/2013: The developer will need to coordinate power requirements and transformer location(s)
with Light & Power Engineering at 970-221-6700.
Comment Number: 2 Comment Originated: 11/04/2013
11/04/2013: Electric developement and system modification charges will apply.
Department: Park Planning
Contact: Craig Foreman, 970.221.6618, cforeman(&fcaov.com
Topic: General
Comment Number: 1
11/05/2013: No comments
Comment Originated: 11/05/2013
Page 2of5
F6rt Collins
January 10, 2014
Cathy Mathis
The Birdsall Group
Fort Collins, CO 80513
RE: Cargill Expansion, FDP130043, Round Number 2
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6760
970.224.6134 - fax
fcgov. com/developmentreview
Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of
the above referenced project. If you have questions about any comments, you may contact the individual
commenter or direct your questions through the Project Planner, Noah Beals, at 970-416-2313 or
nbeals@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Noah Beals, 970.416-2313, nbeals(cDfcsrov.com
Topic: General
Comment Number: 18 Comment Originated: 11/1212013
11/12/2013: The Trash enclosure elevation does not match the site plan. These need to match.
Comment Number: 20 Comment Originated: 11/15/2013
11/15/2013: It is unclear how pedestrians move within the site and how they get from the different
buildings and adjoing lots with minimal conflicts with the vehicle traffic.
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slangenberoer0fcnov.com
Topic: General
Comment Number: 1 Comment Originated: 11/20/2013
01/07/14: The project now only owes an additional $964.75. The acerage on the FDP submittal was
approximately 4 acres more than was identified on the PDP application. 11/20/2013: The project
owes an additonal $6,047.5 for the PDP TDRF. The full amount of land being platted was not used in
the acerage calculation.
Contact: Tyler Siegmund, 970-221.6501, tsiegmundGD.fcaov.com
Topic: General
Comment Number: 14 Comment Originated: 01/08/2014
01/08/2014: Please label the private details on sheet 10 as "on site". See redlines
Topic: Plat
Page 1 of 5