Loading...
HomeMy WebLinkAboutCARGILL EXPANSION - PDP/FDP - FDP130043 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT• - • - eeeeeeeeeee® GRADING- . eeeeeeeeeeee DETENTION• PONDSeeeeeeeeee ,.. INSTALLATIONPIPELINE ee�eee���eee e eeeeeeeee e eeeeeeeee STORMee eeeeeeeee CONCRETEeeee���eeee� ee eeeeeeeee POND OUTLET STRUCTURESee eeeeeeeee CURB AD GUTTEReee eeeeee PAVEMENT . eeeee��eeee� GRADINGFINE • - eeee eeeeee .. eeeeee ee��� BEST MANAGEMENT PRACTICES eeeeeeeeeeee STRUCTURAL eeee�eeeee�� SILT FENCE BARRIERS epee SEDIMENTeee�� VEHICLE TRACKING PADS eeeee CONCRETE WASHOUT BARE SOIL PREPARATION MOM mk� TEMPORARY SEPLANTING ee eeeeee MULCHING / SEALANT ee �eeee� PERMANENT SEED- eeeeee eeee . eeeeee eeee eeeeeeeeeeee SEDIMENT/EROSION CONTROL BEST MANAGEMENT PRACTICES (BMPs) COST OPINION SPREADSHEET CARGILL OFFICE EXPANSION Item No. BMP ID Unit Installation Unit Cost Quantity Cost 1 Check Dam CDR LF $0.00 2 Check Dam (Reinforced) CDR LF $0.00 3 Concrete Washout Area CWA EA $1,200.00 1 $1,200.00 4 Construction Fence CF LF $0.00 5 Construction Markers CM LF $0.00 6 Culvert Inlet Filter CIF LF $0.00 7 Dewatering DW EA $0.00 8 Diversion Ditch (Unlined) DD LF $0.00 9 Diversion Ditch (ECM or plastic) DD LF $0.00 10 Sediment/Erosion Control Matting ECM SY $0.00 11 lInlet Protection IP LF $0.00 12 Reinforced Rock Berm RRB I LF $0.00 13 Sediment Basin SB LS $800.00 1 $800.00 14 Sediment Control Log (Wattle) SCL LF $4.60 30 $138.00 15 Seeding and Mulching SM AC $0.00 16 Silt Fence SF LF $3.00 540 $1,620.00 17 Rock Sock RS LF $10.00 8 $80.00 18 iStabilized Staging Area SSA SY $0.00 19 Surface Roughening SR AC $0.00 20 Temporary Stream Crossing TSC EA $0.00 21 Topsoil (6-inch Lift) TSL AC $0.00 22 Vehicle Tracking Control WC EA $1,500.00 1 $1,500.00 Subtotal $5,338.00 Maintenance & replacements (15%) $800.70 Erosion control escrow amount $6,138.70 APPENDIX E BMP SCHEDULE & COST ESTIMATE Detention Pond Outlet Sizing (POND 2) 100-YEAR LOCATION: Cargill office PROJECT NO: 347-02 COMPUTATIONS BY: PPK DATE: 10/29/2013 Submerged Orifice Outlet: release rate is described by the orifice equation, Q. = Cok sqrt( 2g(h-E.)) where Qa = orifice outflow (cfs) Co = orifice discharge coefficient g = gravitational acceleration = 32.2 ft/s Ao = effective area of the orifice Eo = greater of geometric center elevation of the orifice or d/s HGL (ft) h = water surface elevation (ft) Qmax = outlet pipe dia = D = Invert elev. = Eo = h= Co = 1.10 cfs 12.0 in 4922.00 ft 4922.19 ft 4926.18 ft - 100 yr WSEL 0.63 solve for effective area of orifice using the orifice equation Ao = 0.109 ft` 15.7 in` orifice dia. = d = 4.47 in Check orifice discharge coefficient using Figure 5-21 (Hydraulic Engineering) d / D = 0.37 kinematic viscosity, v = 1.22E-05 ft2/s Reynolds no. = Red = 4Q/(pdv) = 3.08E+05 Co = (K in figure) = 0.6 check Use d = Ao = Qo = Detention.xls 4.500 in 0.110 V = 15.90 in ` 1.12 cfs Detention Pond Outlet Sizing (POND 1) 100-YEAR ' LOCATION: Cargill office PROJECT NO: 347-02 COMPUTATIONS BY: PPK DATE: 10/29/2013 Submerged Orifice Outlet: release rate is described by the orifice equation, Qo = CA sgrt( 2g(h-Eo)) where % = orifice outflow (cfs) Co = orifice discharge coefficient g = gravitational acceleration = 32.2 ft/s A. = effective area of the orifice (W) Eo = greater of geometric center elevation of the orifice or d/s HGL (ft) h = water surface elevation (ft) Qmax = outlet pipe dia = D = Invert elev. = Eo = h= Co = 0.90 cfs 12.0 in 4922.00 ft 4922.17 ft 4926.43 ft - 100 yr WSEL 0.63 solve for effective area of orifice using the orifice equation A. = 0.086 ft` 12.4 in` orifice dia. = d = 3.98 in Check orifice discharge coefficient using Figure 5-21 (Hydraulic Engineering) d / D = 0.33 kinematic viscosity, v = 1.22E-05 ft2/s Reynolds no. = Red = 40/(pdv) = 2.83E+05 Co = (K in figure) = 0.6 check Used= Ao = Qo = Detention.xls 4.000 in 0.087 ft ` = 12.57 in 0.91 cfs WATER QUALITY CALCULATIONS LOCATION: Cargill office PROJECT NO: 347-02 COMPUTATIONS BY: PPK DATE: 10/29/2013 Use 24-hour brim -full volume drain time for extended detention basin Required Storage = a * ( 0.91 * 13 - 1.19 * 12 + 0.78 * 1 ) Water Quality Capture Volume = WQCV = (required storage/12)*(tributary drainage area) SUB BASIN Trib. area (ac) % Imperv. Req. Storage (in. of runoff) from Fig. SQ-2 WQCV (ac-ft) req. vol WQCV *1.2 (ac-ft) DWQ (ft) req, area/row from Fig. EDB-3 (in 2/row) POND 3 5.37 50 0.21 0.092 0.111 1.30 0.649 WQ outlet sizing for pond 1 For 718" in. hole diameter Area of hole = 0.600 in # of columns = 1 Area provided/row = 0.600 in Area Required/row = 0.649 in Use 1 columns of 718" diam holes WATER QUALITY CALCULATIONS POND 1 LOCATION: Cargill office PROJECTNO: 347-02 COMPUTATIONS BY: PPK DATE: 10/29/2013 Use 24-hour brim -full volume drain time for extended detention basin Required Storage = a * ( 0.91 * 13 - 1.19 * IZ + 0.78 * I ) Water Quality Capture Volume = WQCV = (required storage/12)*(tributary drainage area) SUB BASIN Trib. area (ac) % Imperv. Req. Storage (in. of runoff) from Fig. SQ-2 WQCV (ac-ft) req. vol WQCV *1.2 (ac-ft) DWQ (ft) req. area/row from Fig. EDB-3 (inZ/row) Pond 1 1.80 73 0.29 0.043 0.052 3.00 0.093 WQ outlet sizing for pond 1 For 318 in. hole diameter Area of hole = 0.110 in # of columns = 1 Area provided/row = 0.110 in Area Required/row = 0.093 in Use 1 columns of 318" diam holes STAGE -STORAGE TABLE 100-YEAR LOCATION: Cargill office PROJECT NO: 347-02 COMPUTATIONS BY: PPK DATE: 10/29/2011 Extended Water Quality Volume Required = 100 yr Detention Volume Required = POND 1 (east pond) WQCv 100 yr IVSEL 0.052 0.367 Stage (ft) Surface Area (ft`) Incremental Storage (ac-ft) Total Storage (ac-ft) 4922 0 4923 140 0.001 0.001 4924 344 0.005 0.006 4925 1 4,376 1 0.046 1 0.053 4926 11,580 0.173 0.226 4926.43 17,222 0.141 0.367 4926.5 18,141 0.169 0.395 Extended Water Quality Volume Required = 0.111 100 yr Detention Volume Required = 1.016 POND 2 (west pond) WQCV 100 )7R WSEL Stage (ft) Surface Area (ft') Incremental Storage (ac-ft) Total Storage (ac-ft) 4922 0 4923 6,880 0.053 0.053 4923.34 7,940 0.058 0.111 4924 9,970 0.192 0.245 4925 13,800 0.272 0.517 4926 21,855 0.406 0.922 4926.18 23,347 0.093 1.016 4926.5 26,000 0.274 1.197 1.148 100-YEAR DETENTION VOLUME REQUIRED WEST DETENTION POND (POND 2) FAA METHOD LOCATION: Cargill office PROJECT NO: 347-02 COMPUTATIONS BY: PPK DATE: 10/29/2013 Equations: A trib. To pond = 5.37 acre QD = CIA C100 = 0.74 Vi = T C I A= T QD Developed C A= 4.0 acre Vo =K QPo T QPD = 1.10 cfs S=Vi -Vo K= 1 Rainfall intensity from City of Fort Collins IDF Curve Storm Duration, T (min) Rainfall Intensity, i (in/hr) QD (cfs) Vol. In Vi (ft) Vol. Out Vo (ft) Storage S (ft) Storage S (ac-ft) 5 9.95 39.5 11862 0 11862 0.272 10 7.72 30.7 18407 0 18407 0.423 20 5.60 22.3 26704 660 26044 0.598 30 4.52 18.0 32331 1320 31011 0.712 40 3.74 14.9 35669 1980 33689 0.773 50 3.23 12.8 38506 2640 35866 0.823 60 2.86 11.4 40914 3300 37614 0.864 70 2.62 10.4 43728 3960 39768 0.913 80 2.38 9.5 45397 4620 40777 0.936 90 1 2.22 8.8 47638 5280 42358 1 0.972 100 2.05 8.1 48878 5940 42938 0.986 110 1.93 7.7 50618 6600 44018 1.011 120 1.80 7.2 51500 7260 44240 1.016 130 1.60 6.4 49593 7920 41673 0.957 140 1.40 5.6 46732 8580 38152 0.876 150 1.20 1 4.8 1 42917 1 9240 33677 0.773 160 1.15 4.6 43871 9900 33971 0.780 170 1.10 4.4 44586 10560 34026 0.781 180 1.05 4.2 45063 11220 33843 0.777 Required Storage Volume: 44240 ft3 1.016 acre-ft 100-YEAR DETENTION VOLUME REQUIRED EAST DETENTION POND (POND 1) FAA METHOD LOCATION: Cargill office Basin 1 PROJECT NO: 347-02 COMPUTATIONS BY: PPK DATE: 10/29/2013 Equations: A trib. To pond = 1.8 acre Qo = CIA C100 = 0.96 Vi = T C I A= T Qo Developed C A= 1.7 acre Vo =K QPo T QPo = 0.90 cfs S=Vi -Vo K= 1 Rainfall intensity from City of Fort Collins OF Curve Storm Duration, T (min) Rainfall Intensity, i (in/hr) QD (cfs) Vol. In Vi (ft) Vol. Out Vo (ft) Storage S (ft) Storage S (ac-ft) 5 9.95 16.7 5015 0 5015 0.115 10 7.72 13.0 7782 0 7782 0.179 20 5.60 9.4 11290 540 10750 0.247 30 4.52 7.6 13668 1080 12588 0.289 40 3.74 6.3 15080 1620 13460 0.309 50 3.23 5.4 16279 2160 14119 0.324 60 2.86 4.8 17297 2700 14597 0.335 70 2.62 4.4 18487 3240 15247 0.350 80 2.38 4.0 19192 3780 15412 0.354 90 2.22 3.7 20140 4320 15820 0.363 100 2.05 3.4 20664 4860 15804 0.363 110 1.93 3.2 21400 5400 16000 0.367 120 1.80 3.0 21773 5940 15833 0.363 130 1.60 2.7 20966 6480 14486 0.333 140 1.40 1 2.4 1 19757 1 7020 12737 0.292 150 1.20 2.0 18144 7560 10584 0.243 160 1.15 1.9 18547 8100 10447 0.240 170 1.10 1.8 18850 8640 10210 0.234 180 1.05 1.8 19051 9180 9871 0.227 Required Storage Volume: 16000 ft3 0.367 acre-ft APPENDIX D DETENTION & WATER QUALITY POND CALCULATIONS 0 x c 0 m w Storm system.stc 10/29/2013 30.00 25.00 -0+50 Profile Report Engineering Profile - Profile - 3 (Storm system.stc) ft 0+00 0+50 1+00 1+50 2+00 Station (ft) Bentley StormCAD V8i Bentley Systems, Inc. Haestad Methods Solution Center [08.11.00.401 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA Page 1 of 1 +1-203-755-1666 30.00 c ° 25.00 m w 20.00 Profile Report Engineering Profile - Profile - 2 (Storm system.stc) CB-5 -0+50 0+00 0+50 1+00 1+50 2+00 2+50 Station (ft) Bentley StormCAD V8i Storm system.stc Bentley Systems, Inc. Haestad Methods Solution Center [08.11.00.401 10/29/2013 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA Page 1 of 1 +1-203-755-1666 30.00 z 25.00 w 20,00 -0+50 Profile Report Engineering Profile - Profile - 1 (Storm system.stc) 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+ 00 4+50 5+00 Station (f ) 6.00fl 22.00 It Bentley StormCAD V8i Storm system.stc Bentley Systems, Inc. Haestad Methods Solution Center [08.11.00.40) 10/29/2013 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA Page 1 of 1 +1-203-755-1666 Conduit FlexTable: DOT Report (Storm systems Label Diameter Slope Flow -Node- -Depth- -EGL- -Ground- -HGL- -Invert- Velocity Velocity (in) (ft/ft) (ftl/s) Upstream Upstream Upstream Upstream Upstream Upstream (L1) (Out) Downstream Downstream Downstream Downstream Downstream Downstream (ft/s) (ft/s) (ft) (ft) (ft) (ft) (ft) 20-1 12.0 0.005 2.10 CB-1 1.45 26.01 26.10 25.90 24.45 2.67 2.67 CB-2 1.88 25.99 27.40 25.59 23.71 CO-2 15.0 0.005 6.20 CB-2 1.88 25.99 27.40 25.59 23.71 5.05 5.05 CB-3 1.87 25.82 26.80 25.37 23.50 CO-3 21.0 0.005 13.00 CB-3 1.87 25.82 26.80 25.37 23.50 5.40 5.56 T-1 1.63 24.89 26.00 24.36 22.73 CO-4 24.0 0.005 16.00 T-1 1.63 24.89 26.00 24.36 22.73 5.83 6.60 OF-1 (N/A) (N/A) 26.00 23.44 22.00 CO-5 12.0 0.009 3.00 CB-4 1.55 24.92 38.00 24.70 23.15 3.82 3.82 T-1 1.63 24.89 26.00 24.36 22.73 CO-6 10.0 0.010 3.80 C13-5 2.38 28.13 28.00 27.38 25.00 6.97 7.08 OF-2 (N/A) (N/A) 26.00 23.80 23.00 CO-7 15.0 0.006 2.20 C13-6 0.59 24.02 25.90 23.79 23.20 3.84 3.55 T-2 0.63 23.47 27.50 23.23 22.60 CO-8 18.0 0.005 2.75 T-2 0.63 23.47 27.50 23.23 22.60 3.91 3.97 OF-3 (N/A) (N/A) 26.50 22.87 22.25 CO-9 8.0 0.025 0.55 C13-7 0.35 25.99 28.00 25.85 25.50 2.99 1.61 T-2 0.63 23.47 27.50 23.23 22.60 Bentley Storm CAD V8i Storm system.stc Bentley Systems, Inc. Haestad Methods Solution Center [08.11.00.401 10/29/2013 27 Sismon Company Drive Suite 200 W Watertown, CT 06795 USA +1- Page 1 of 1 203-755-1666 Scenario: Base Bentley StormCAD V8i Storm system. stc Bentley Systems, Inc. Haestad Methods Solution Center [08.11.00.401 10/29/2013 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1- Page 1 of 2 203-755-1666 APPENDIX C HYDRAULIC COMPUTATIONS C North Star Design, Inc. 700 Automation Drive, Unit I Windsor. CO 80550 LOCATION: PROJECT NO: COMPUTATIONS BY DATE: 100-yr storm, Cf = Cargill Office 347-02 ppk 10/29/2013 1.25 RATIONAL METHOD PEAK RUNOFF (100-YEAR) DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Point Subbasin ID A (ac) C"Cf tc (min) i (in/hr) Q (100) (cfs) Design Point Q (100) (cfs) a(100)tot (cfs) 1 isins 1 & 2 Histo 7.18 0.25 13.6 4.47 8.0 8.0 Pre Development 1 Basin 1 1.80 0.97 14.6 3.80 6.6 1 6.6 2 Basin 2 (interim 5.37 0.74 7.4 8.41 33.5 33.5 Ph 1 & ph 2 improvements 2 3asin 2 (ultimate 5.37 1.00 7.1 8.62 46.3 46.3 with 'future' greenhouses 1 sins 1 & 2 (inter 7.18 0.80 17.3 2.07 11.9 11.9 1 3asms 1 & 2 (ult 7.18 0.99 18.1 1.58 11.2 11.2 Q = C iA Q = peak discharge (cfs) C = runoff coefficient I = rainfall intensity (in/hr) from OF curve A = drainage area (acres) Flow-FINAL.xis Q100 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: PROJECT NO: COMPUTATIONS BY DATE: 10-yr storm, Cf = Cargill Office 347-02 ppk 10/29/2013 1.00 RATIONAL METHOD PEAK RUNOFF (10-YEAR) DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Point Subbasin ID A (ac) C"Cf tc (min) i (in/hr) Q (10) (cfs) Design Point Q (10) (cfs) Q(10)tot (cfs) 1 3asins 1 & 2 Historic 7.18 0.20 13.6 2.22 3.2 3.2 Pre Development 1 Basin 1 1.80 0.77 14.6 1.89 2.6 2.6 2 Basin 2 (interim) 5.37 0.59 8.3 3.83 12.2 12.2 Ph 1 & ph 2 improvements 2 Basin 2 (ultimate) 5.37 0.80 8.3 3.83 16.5 16.5 with 'future' greenhouses 1 3asins 1 & 2 (interim 7.18 0.64 17.3 1.06 4.8 4.8 1 Basins 1 & 2 (ult) 7.18 0.64 17.3 1.06 4.8 4.8 Q = C iA Q = peak discharge (cfs) C = runoff coefficient I = rainfall intensity (in/hr) from OF curve A = drainage area (acres) Flow-FINAL.xis Q10 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: PROJECT NO: COMPUTATIONS BY DATE: 2-yr storm, Cf = Cargill Office 347-02 ppk 10/29/2011 1.00 RATIONAL METHOD PEAK RUNOFF (2-YEAR) DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Point Subbasin ID A (ac) C"Cf tc (min) i (in/hr) Q (2) (cfs) Design Point Q (2) (cfs) Q(2)tot (cfs) 1 3asins 1 & 2 Historil 7.18 0.20 13.6 1.39 2.00 2.00 Release Rate 1 Basin 1 1.80 0.77 14.6 1.12 1.6 ff 1.6 2 Basin 2 (interim) 5.37 0.59 8.3 2.25 7.2 7.2 Ph 1 & ph 2 improvements 2 Basin 2 (ultimate) 5.37 0.80 8.3 2.25 9.7 9.7 with 'future' greenhouses 1 asins 1 & 2 (interin 7.18 0.64 17.3 0.63 2.9 2.9 1 Basins 1 & 2 (ult) 7.18 0.79 18.1 0.49 2.8 2.8 Q = C iA Q = peak discharge (cfs) C = runoff coefficient I = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) Flow-FINAL.xIs Q2 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: PROJECT NO: COMPUTATIONS BY: DATE: 100-yr storm Cargill Office 347-02 ppk 10/29/2013 Cf= 1.25 TIME OF CONCENTRATION - 100 YR SUB -BASIN DATA INITIAL 1 OVERLAND TIME (ti) TRAVEL TIME / GUTTER OR CHANNEL FLOW (tt) to CHECK (URBANIZED BASIN) FINAL tc REMARKS DESIGN POINT SUBBASIN ID (1) Area (ac) (2) C (3) C'Cf Length (ft) (4) Slope (%) (5) ti (min) (6) Length (fit) (7) Slope (%) (8) n Manning rough. Vel. (ft/s) (9) tt (min) (10) lc= ti + It (11) Total (ft) (12) tc=(I/l80)+10 (min) (13) (min) (14) 1 3asins 1 & 2 Histori 7.18 0.20 0.25 520 0.6 41.4 120 6.50 0.030 2.7 0.73 42.1 640 13.6 13.6 Pre Development 1 Basin 1 1.80 1 0.77 0.97 70 2.0 1.6 1 760 0.50 0.030 0.8 16.72 18.3 830 14.6 14.6 2 Basin 2 (interim) 5.37 0.59 0.74 20 2.0 2.3 535 0.50 0.013 1.7 5.10 7.4 555 13.1 7.4 Ph 1 & ph 2 improvements 2 1 Basin 2 (ultimate) 5.37 0.80 1.00 20 2.0 0.6 675 0.50 0.013 1.7 6.43 1 7.1 695 1 13.9 7.1 Iwith 'future' greenhouses 1 3asins 1 & 2 (interim 7.18 0.64 0.80 20 2.0 1.9 535 0.50 0.013 1.7 5.10 760 0.50 0.030 0.8 16.72 23.8 1315 17.3 17.3 0 1 Basins 1 & 2 (ult) 7.18 0.79 0.99 20 2.0 0.7 675 0.50 0.013 1.7 6.43 760 F50 0.030 0.8 16.72 23.8 1455 18.1 18.1 0 EQUATIONS: tc=ti+tt ti = [1.87 (1.1 - CC,) Los ) / S 1/3 It = L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + It and urbanized basin check minimum tc = 5 minutes Flow-FINALAs TOCA 00 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: PROJECT NO: COMPUTATIONS BY: DATE: 2-yr storm Cargill Office 347-02 ppk ###44444 Cf= 1.00 TIME OF CONCENTRATION - 2 YR SUB -BASIN DATA INITIAL I OVERLAND TIME (tl) TRAVEL TIME / GUTTER OR CHANNEL FLOW (tt) tc CHECK (URBANIZED BASIN) FINAL tc REMARKS DESIGN POINT SUBBASIN ID (1) Area (ac) (2) C (3) C'Cf Length (ft) (4) Slope N (5) ti (min) (6) Length (ft) (7) Slope (%) (8) n Manning rough. Vel. (ft/s) (9) It (min) (10) lc= ti + It (11) Tota1L (ft) (12) tc=(1/180)+10 (min) (13) (min) (14) 1 Basins 1 & 2 Historic 7.18 0.20 0.20 520 0.6 43.8 120 6.50 0.030 2.7 0.7 44.5 640 13.6 13.6 Pre Development 1 Basin 1 1.80 1 0.77 0.77 70 2.0 3.9 1 760 0.50 0,030 0.8 16.7 20.6 830 14.6 14.6 2 Basin 2 (interim) 5.37 0.59 0.59 20 2.0 3.2 535 0.50 0.013 1.7 5.1 8.3 555 13.1 8.3 Ph 1 & ph 2 improvements 2 Basin 2 (ultimate) 5.37 0.80 0.80 20 2.0 1.9 675 0.50 0,013 1.7 6.4 6.3 695 13.9 8.3 with 'future' greenhouses 1 Basins 1 & 2 (interim) 7.18 0.64 0.64 20 2.0 3.0 535 0.50 0.013 1.7 5.1 760 0.50 0.030 0.8 16.7 24.8 1315 17.3 17.3 1 Basins 1 & 2 full) 7.18 0.79 0.79 20 2.0 2A 675 0.50 0.013 1.7 6.4 760 0.50 0.030 0.8 16.7 25.1 1455 18.1 18.1 EQUATIONS: tc=ti+It ti = [1.87 (1.1 - CC,) Los ) / S 1133 tt = L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + tt and urbanized basin check minimum tc =5 minutes Flow-FINAL.xls TOC-2 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: Cargill Office PROJECT NO: 347-02 COMPUTATIONS BY: ppk DATE: 10/29/2013 RUNOFF COEFFICIENTS & % IMPERVIOUS Recommended Runoff Coefficients from Table 3-3 of City of Fort Collins Design Criteria Recommended % Impervious from Urban Storm Drainage Criteria Manual Streets, parking lots (asphalt) Sidewalks (concrete) Roofs: Lawns (flat <2%, heavy soil) Runoff % coefficient Impervious C 0.95 100 0.95 96 0.95 90 0.20 0 SUBBASIN ID TOTAL AREA (ac.) TOTAL AREA (sq.ft) ROOF AREA (sq.ft) PAVED AREA (sq.ft) SIDEWALK AREA (sq.ft) LANDSCAPE AREA (sq.ft) RUNOFF COEFF. (C) % Impervious REMARKS Basins 1 & 2 Historic 7.18 312,704 0 0 0 312,704 0.20 0 Pre Development Basin 1 1.80 78,560 21,768 26,649 11,510 18,633 0.77 73 Basin 2 (interim) 5.37 234,114 55.404 48.268 18.659 111.783 0.59 50 Ph 1 & ph 2 improvements Basin 2 (ultimate) 5.37 234,114 89,100 66,861 1 31.547 1 46,606 gua T__F 76 Wth'future' greenhouses Basins 1 & 2 (interim) 7.18 312674 77172 74917 30169 130416 0.64 55 Basins 1 & 2 full) 7.18 312674 110868 93510 43057 65239 0.79 75 Eaualions - Calculated C coefficients & % Impervious are area weighted C=T_(Ci Ai) /At Ci = runoff coefficient for specific area, Ai Ai = areas of surface with runoff coefficient of Ci in = number of different surfaces to consider At = total area over which C is applicable; the sum of all Ai's Flow FINAL.xls Cval APPENDIX B HYDROLOGIC COMPUTATIONS e��eeeeeeeeemmm mmmmmmillillill �. M. LU o� �f Mi .. NOR ccW 0 :�� . VICINITY MAP NTS North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 TIME OF CONCENTRATION - 10 YR LOCATION: Cargill Office PROJECT NO: 347-02 COMPUTATIONS BY: ppk DATE: 10/29/2013 10-yr storm Cf = 1.00 SUB -BASIN DATA INITIAL / OVERLAND TIME (III) TRAVEL TIME / GUTTER OR CHANNEL FLOW (tt) tc CHECK (URBANIZED BASIN) FINAL tc REMARKS DESIGN POINT SUBBASIN ID (1) Area (ac) (2) C (3) C'Cf Length (ft) (4) Slope N (5) ti (min) (6) Length (ft) (7) Slope (%) (8) in Manning rough. 1 Val. (ft/s) (9) It (min) (10) tc = ti+tt (11) Total L (ft) (12) tc=(1/180)+10 (min) (13) (min) (14) 1 asins 1 & 2 Histor 7.18 0.20 0.20 520 0.6 43.8 120 6.5 0.030 2.73 0.7 44.5 640 13.6 13.6 Pre Development 1 Basin 1 1.80 0.77 0.77 70 2.0 3.9 760 0.5 0.030 0.76 16.7 20.6 830 14.6 14.6 2 Basin 2 (interim) 5.37 0.59 0.59 20 2.0 3.2 535 0.5 0.013 1.75 5.1 8.3 555 13.1 8.3 Ph i & ph 2 improvements 2 Basin 2 (ultimate)g 5.37 0.80 0.80 20 2.0 1.9 675 0.5 0.013 1.75 6.4 8.3 695 13.9 8.3 with'future' greenhouses 1 asins 1 & 2 (interir Z18 0.64 0.64 20 2.0 3.0 535 0.5 0.013 1.75 5.1 760 0.5 0.030 0.76 16.7 24.8 1315 17.3 17.3 1 Basins 1 & 2 (ult) 7.18 0.79 0.79 20 2.0 2.0 675 0.5 0.013 1.75 6A 760 0.5 0.030 0.76 16.7 25.1 1455 18.1 18.1 EQUATIONS: tc=ti+tt ti=[1.87(1.1-CCf)Los]/S113 It = L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + It and urbanized basin check minimum tc = 5 minutes Flow-FINAL.As TOC-10 APPENDIX A VICINITY MAP 6. REFERENCES City of Fort Collins, "Storm Drainage Criteria Manual", (SDCM), dated March 1999. 2. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria Manual", Volumes 1 and 2, dated June 2001, and Volume 3 dated September 2001. 3. "Final Drainage and Erosion Control Report for Cargill Secondary Use Building" by DWM Civil Engineers dated May 5, 2007. 12 5. CONCLUSIONS 5.1. Compliance with Standards All computations that have been completed within this report will be in compliance with the City of Fort Collins Erosion Control Reference Manual for Construction Sites and the City of Fort Collins Stormwater Criteria Manual. 5.2. Drainage Concept The proposed drainage concepts presented in this report and on the construction plans, will adequately provide for stormwater quality treatment for the proposed improvements. Conveyance elements have been designed to convey required flows in the proposed grassed swales and the existing water quality facility and ultimately to the Cache la Poudre River. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Permit will be required. III 5) Waste Management and Disposal: Portable toilets will be anchored & periodically maintained by waste management company. Dumpsters on site will be covered & periodically emptied by waste management company. Concrete waste will be allowed to harden and then will be removed from site. No washing activities will occur on site. Location of the concrete washout is shown on the site map. The washout will be sufficiently deep to accommodate all anticipated concrete truck wash water. Waste concrete will be allowed to harden and be removed from site periodically as the washout reaches 50% of its capacity. Truck wash water will not be allowed to reach the curb & gutter or any other water course. 6) Groundwater and Stormwater Dewatering: No groundwater was encountered during soils exploration therefore ground water is not anticipated to be an issue. If groundwater is encountered a groundwater discharge permit shall be obtained and a detailed report shall be completed describing the location and the route of where pumped groundwater will be conveyed and the measures taken to prevent the transport of any pollutants to downstream waters. 7) Inspection & Maintenance: It is required that routine site inspections are performed to effectively address maintenance and repair of Best Management Practices (BMP's). The site inspections are to performed by the contractor or an inspector designated by the administrator at a minimum of once every fourteen (14) calendar days on active construction sites and after any significant storm event (an event causing runoff). As part of the site inspections the inspector is required to keep documentation of all inspections and BMP maintenance, including an updated Site Map indicating new BMP's or the removal of BMP's since the previous inspection. Any maintenance, repair, or necessary installation of BMP's that are noted during the inspection must be completed within seven (7) calendar days from the date of the inspection. 10 2) Materials Handling and Spill Prevention: Materials Handling & Spill Approximate location on site �AppI cable_to this Prevention BMP Project Portable toilets, anchored & Refer to site map X located away from drainages Fuel storage located in bulk tanks with secondary containment & spill kit Mobile fueling performed at least 200 feet away from drainages & Refer to site map X fully attended Fertilizers, form oil, solvents, cleaners, detergent stored in 55 gal Refer to site map X or smaller containers, kept in storage units Dumpsters containing used chemicals containers & liquid Refer to site map X wastes kept covered Equipment cleaning (on site) uses no detergents & flows to onsite retention basin In case of a release of fuel or other chemicals, absorbent booms or earthen berms will be immediately Location of spill X constructed to contain the spill & prevent runoff to adjacent surface waters MSDS sheets for onsite chemicals will be kept at the construction Construction Trailer X trailer to facilitate spill response & cleanup 3) Dedicated Asphalt or Concrete Batch Plant: Not proposed with this development 4) Vehicle Tracking Pad: Vehicle tracking control pad shall be installed wherever construction vehicle access routes intersect paved public roads. Vehicle tracking control pads shall be installed to minimize the transport of sediment (mud) by runoff or vehicles tracking onto the paved surface. Any mud tracked to public roads shall be removed on a daily basis and after any significant storm that causes sediment to be transported. It is unlawful to track sediment/mud onto public streets and may be enforced by the City of Fort Collins or by the State of Colorado. 9 4.4 BMP Implementation 1) Phased BMP Implementation BMP's are expected to change as the construction progresses and it is the responsibility of the contractor to ensure appropriate BMP's are in place and/or removed at the appropriate time in the construction sequence. A construction sequence schedule has been included on the Drainage & Erosion Control Plan and included in the construction plans for this site. All BMP's shall be inspected and repaired or replaced as required to satisfy the conditions of the Stormwater Discharge Permit. All BMP's must be maintained and repaired as needed to assure continued performance of their intended function. Refer to Appendix D for the implementation schedule. Refer to Appendix D for the BMP Cost Estimate. 8 Non -Structural Practices for Erosion and Sediment Control: Soils exposed during the earthwork phase and landscape prep phase shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control is installed. No large amount of soils (in excess of 15 yards) will be allowed to be stock piled on site. Overburden from the utility pipe trenching will be piled adjacent to trenches upstream of sediment controls and will be replaced in the trenches within 72 hours. Excess excavated materials from the demolition and grading phases of the project that cannot be reused on site will be exported as it is excavated. This includes any asphalt pavement from the existing site that is to be removed. A vehicle tracking pad will be installed at a location most beneficial to the site construction as determined by the contractor. Vehicles will not be permitted in the excavated area if soil is muddy. Gravel sub base will be placed and compacted in the areas indicated for pavement following excavation. In the current pre construction state the site enables tracking of silt onto the adjacent streets during wet conditions. During construction activities the street will be monitored for foreign debris tracked out of the site and mechanical sweeping and clean up will be performed as needed. No area shall remain exposed by land disturbing activity for more than thirty (30) days before rec uired temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed. Temporary & Permanent non-structural BMP's: ., , TNon-Structural BMP ��,' Approximate location on site " a -,Applicable this ...� ' project Surface roughening Entire construction area X Soil stockpile height limit (less than 10') Perimeter vegetative buffer North and west sides of construction area X Minimization of site disturbance Entire site X Mulch Seed & mulch stockpiles after 30 days Stockpile toe protection (silt fence, wattles or ditch) Preservation & protection of West and north sides of construction area X existing vegetation & trees Good site housekeeping (routine Entire Construction area X cleanup of trash & constr debris) Heavy equip staged on site, properly maintained & inspected Staging area X daily (no onsite maintenance) 7 4.3 Best Management Practices (BMP's) for Stormwater Pollution Prevention Structural Practices for Erosion and Sediment Control Structural practices for the site will consist mainly of silt fence, straw wattles and rock sock filters and are described in detail in the following paragraphs. These BMP's are expected to change as the construction progresses and it is the responsibility of the contractor to ensure appropriate BMP's are in place and/or removed at the appropriate time in the construction sequence. All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. Silt fence and rock sock filters shall be in place prior to commencement of construction activities. During clearing and grubbing necessary for silt fence installation, all cleared material shall be placed on the uphill side so that if erosion occurs from the cleared material, the sediment will be trapped and not transported downstream. Rock socks shall be implemented in the existing curb line of Drake Road as shown on the Drainage & Erosion Control Plan. All BMP's shall be installed per the details shown on the construction plan set. Temporary & Permanent Structural BMP's: Structural BMP ry �.Project Approximate tocatwn:on site Applicable to this Silt Fence Site perimeter, refer to site map X Straw bale dams Rock Socks At existing pond outlet, refer to site map X Earthen diversion dams Vegetated swales Maintain existing vegetation in swale X Sediment trap/pond In Pond 2 X Pipe slope drains Geogrid Inlet/outlet protection At pipe outlets as shown on EC plan X Culverts Riprap At pipe outlet, refer to site map X Erosion control mats Inlet protection 6 4. STORMWATER MANAGEMENT CONTROLS 4.1 SWMP contact information Permit holder: Name: Dohn Construction Address: 2642 Midpoint Drive, Fort Collins, CO Phone Number: 970-490-1855 Email Address: tannand@dohnconstruction.com Appointed agent: Name: Address: Phone Number: Email Address: 4.2 Identification and location of all potential pollution sources Potential Pollutant Source Activity _ Potential'Pollutant Generated , A ,, Applicable to —this proVject Disturbed Areas Sediment X Soil stockpiles Sediment X Travel to adjacent public streets Tracked sediment X Contaminated soils Sediment, chemicals Loading and unloading chemicals Chemicals Outdoor storage of chemicals Chemicals On site equipment maintenance Oil, grease On site equipment fueling Diesel, gasoline X Dust generating activities Particulates, sediment X Use of fertilizer, pesticides, herbicides Fertilizer, pesticides Use of detergents, solvents, oils Detergents, solvents, oil X Waste dumpsters, waste piles Chemicals X Concrete washout Concrete, sediment X On site equipment washing Detergents, oil On site asphalt batch plant Asphaltic cement, sediment On site concrete batch plant Cement, sediment Portable toilets Domestic sewage X 5 Pond 1 will have water quality extended detention and a bioswale with an underdrain pipe. The water quality extended detention is required for this site and the bioswale is intended to provide additional treatment in order to forego the requirement for pervious pavement on site. Pond 1 will discharge into the existing storm manhole located at the southeast corner of Basin 1. Basin 2 includes the remainder of the proposed development including the parking and private drive on the west, the remainder of the proposed office building, two greenhouses to be constructed in phase 2 and the associated private asphalt drives. Although 3 additional greenhouses are shown in this basin, they are considered a future improvement and were not included in the drainage calculations for this basin. Runoff from this basin will either directly enter the proposed detention and water quality pond or will be collected in a private storm pipe and conveyed west and south into the proposed Pond 2. Pond 2 will have water quality extended detention and a bioswale without an underdrain pipe. The water quality extended detention is required for this site and the bioswale is intended to provide additional treatment in order to forego the requirement for pervious pavement on site. Pond 2 will discharge into the existing inlet located in the south flowline of Drake Road near the middle of the site. The 2 year historic runoff for the 7.2 acres was calculated to be 2.0 cfs. This allowable release rate was divided between the two ponds with Pond 1 having a release rate of 0.90 cfs and Pond 2 having a release rate of 1.1 cfs. 3.3. Drainage Summary Drainage for this site was designed to conform to the City of Fort Collins stormwater and water quality requirements. Water quality is provided for a majority of the site utilizing grassed swales. Water quality for the site is also provided by routing runoff through the existing water quality pond. 4 2.3. Hydrologic Criteria Runoff computations were prepared for the 10 year minor and 100 year major storm frequency utilizing the Rational Method. All hydrologic calculations associated with the basins are included in Appendix B of this report. 2.4. Hydraulic Criteria Necessary hydraulic calculations are provided and prepared in accordance with the City of Fort Collins Drainage Criteria and the Urban Area Drainage Criteria Manual. 3. DRAINAGE FACILITY DESIGN 3.1. General Concept All of the runoff from this site historically sheet flows to the adjacent streets and is intercepted by the existing inlets located in East Drake Road. With the previous development on site, a water quality pond was provided and will remain with this proposal. The proposed improvements will disturb approximately 7.2 acres of the entire 30.73 acres on the Cargill campus. Runoff from this site will be collected in proposed private storm pipes or will surface flow to the proposed detention ponds on site. The ponds were sized to accommodate the 100 year storm event with a 2 year historic release rate. 3.2. Specific Flow Routing The proposed development (and a portion of the existing development) has been divided into 2 basins, each corresponding with the appropriate detention pond that collects runoff from that basin. Smaller portions of those basins were considered when sizing the onsite storm systems. A summary of the drainage patterns within each basin is provided in the following paragraphs. Basin 1 encompasses the east portion of the site including the existing greenhouse/headhouse building, a portion of the existing asphalt drive, the east half of the proposed office building, the south and east parking lots and the proposed Pond I site. Runoff from this basin will either directly enter the proposed detention and water quality pond or will be collected in a private storm pipe and conveyed south and east into the proposed Pond 1. 3 on the plans for reference. . 1.3. Major Basin Description This site is located in the Foothills Drainage Basin. The site is not located within the FEMA designated 100 year floodplain or the City designated flood plain. 1.4. Sub -basin Description This site is located in Subbasin 56 of the Foothills Basin Master Plan. Stormwater runoff from the Cargill site drains overland generally from north to south at slopes ranging from 0.5% to 2.0%. Runoff from the entire Cargill site currently flows to an onsite water quality pond and released into the storm system or to Drake Road where it is captured in inlets and conveyed to the Poudre River. 2. DRAINAGE DESIGN CRITERIA 2.1. Regulations Drainage for this site has been designed to meet or exceed the "City of Fort Collins Stormwater Criteria Manual' specifications, the City of Fort Collins Cache la Poudre Basin Master Plan and the update to Chapter 26 of the City Code. Where applicable, the criteria established in the "Urban Storm Drainage Criteria Manual' (UDFCD), 2001 has been used. 2.2. Development Criteria Reference and Constraints Stormwater runoff from this site has been routed to conform to the requirements of the City Stormwater Department. Detention is required for this site with a 2 year historic release rate. Detention is being provided for all, of the new construction and the greenhouse and head house that were recently constructed. The remaining existing structures will not be considered in the drainage and detention design for this site. Water quality facilities are required for the improvements and are being provided by water quality extended detention in the ponds and two bio swales within the ponds. FA 1. GENERAL LOCATION AND DESCRIPTION 1.1. Location The site is located in Section 20, Township 7 North, Range 68 West of the 6`h P.M. in the City of Fort Collins, CO. The site is bounded by East Drake Road on the south, the Sidehill development on the west, north and east. 1.2. Description of Property The Cargill Expansion area that is being considered with this drainage design is approximately 7.2 acres of the total 30.73 acre Cargill property. There are a total of seven existing buildings and a pavilion on the Cargill property. The existing buildings include offices, laboratories and greenhouses. Prior to any development, the site was originally with native weeds and grasses and irrigated crops. On site soils on the Cargill property are primarily Nunn Loam and Stoneham Loam with small areas of Santana Loam and Larimer-Stoneham complex. The entire site is composed of Hydrologic Groups B and C. according to the USDA soils survey maps. Group B soils have a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C soils have a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. The majority of the building site is predominantly Hydrologic Group C. The existing runoff coefficient for the overall site prior to construction is 0.20 for the 2 year condition. The site is zoned Low Density Mixed Use Neighborhood (LMN). The site is within Flood Insurance Zone C. the areas determined to be outside the 500-year flood plain, according to the FEMA Flood Insurance Rate Map, Community -Panel No. 0801 01-0193-E, dated March 18, 1996. The proposed development is a phased development. Phase I includes the proposed office building, private drives, parking and two detention ponds. Phase 2 includes two greenhouses and the associated asphalt drives. The areas designated as future development were not considered in the drainage design for this site and are only shown TABLE OF CONTENTS TABLEOF CONTENTS............................................................................................................... iii GENERAL LOCATION AND DESCRIPTION 1.1 Location...................................................................................................................1 1.2 Description of Property............................................................................................I 1.3 Major Basin Description..........................................................................................1 1.4 Sub Basin Description..............................................................................................I 2. DRAINAGE DESIGN CRITERIA 2.1 Regulations..............................................................................................................1 2.2 Development Criteria Reference and Constraints....................................................2 2.3 Hydrologic Criteria..................................................................................................2 2.4 Hydraulic Criteria....................................................................................................2 3. DRAINAGE FACILITY DESIGN 1.1 General Concept.......................................................................................................2 3.2 Specific Flow Routing.............................................................................................3 3.3 Drainage Summary ..................................................................................................3 4. STORMWATER MANAGEMENT CONTROLS 4.1 SWMP contact information...................................................................................... 4.2 Identification and location of all potential pollution sources...................................4 4.3 Best Management Practices (BMP's) for Stormwater Pollution Prevention ........... 5 4.4 BMP Implementation...............................................................................................7 5. CONCLUSIONS 5.1 Compliance with Standards..................................................................................10 5.2 Drainage Concept...................................................................................................10 6. REFERENCES.................................................................................................................. I I APPENDICES A Vicinity Map B Hydrologic Computations C Hydraulice Computations D Detention & Water Quality Pond Calculations D BMP Schedule & Cost Estimate North Star design 700 Automation Drive. Unit 1 Windsor. CO 80550 Phone:970-686-6939 Fax:970-686-II88 October 30, 2013 Glen Schlueter City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522 RE: Final Drainage and Erosion Control Report for Cargill Office Expansion Dear Glen, I am pleased to submit for your review and approval, this Final Drainage and Erosion Control Report for Cargill Office Expansion. I certify that this update for the drainage design of the Cargill Greenhouse was prepared in accordance with the criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Prepared by: Patricia Kroetch P.E. Project Manager FINAL DRAINAGE AND EROSION CONTROL REPORT FOR CARGILL OFFICE EXPANSION Prepared for: Steve Stadelmaier Cargill 2540 East Drake Road Fort Collins, CO 80525 Prepared by: North Star Design 700 Automation Drive, Unit Windsor, Colorado 80550 (970)686-6939 October 30, 2013 Job Number 339-02 FINAL DRAINAGE AND EROSION CONTROL REPORT FOR CARGILL OFFICE EXPANSION