Loading...
HomeMy WebLinkAboutROCKY MOUNTAIN RAPTOR PROGRAM - ODP & FIRST FILING PDP - 7-06 - CORRESPONDENCE - (4)floodplain. If the improvement value is below the 50% threshold, then there are no requirements other than to submit to Utilities a floodplain use permit and a detailed cost estimate of the proposed improvements. There is a $25 permit fee. Contact Marsha Hilmes-Robinson at 224-6036 with questions. Please note that aerial maps showing the extent of the City's 0.5 feet floodway are being included with these comments for the applicant's use. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: General Number: 22 Created: 3/22/2006 [3/22/06] (No comments until new development is proposed on the site.) Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamdan Topic: Utility Plans Number: 18 Created: 3/21/2006 [3121/06] Since no utility construction is being contemplated with this project, no utility plan is required. If any grading is proposed then a grading plan would be required. It seems that a ditch is being filled, please locate that ditch on the map. This ditch is called out to be filled, however, this needs to be evaluated depending on whether the ditch is conveying any off -site flows from the west. A site visit should be set up to help us evaluate the impact of the grading proposed on the site and to try to find an appropriate location for the cages. Show the location of the Josh Ames ditch on the plans. Call out the Dry Creek channel. Department: Zoning Issue Contact: Gary Lopez Topic: Zoning Number: 3 Created: 3/13/2006 [3/13/06] No Issues assuming that the cages will similar to the ones at the current location shown in pictures. Please return all of your redlined plans when you re -submit. The project has been tentatively scheduled for the April 20th Planning and Zoning Board hearing. In order to be retained on the agenda, revised development plans and written materials in response to the review comments must be received no later than March 31 S`. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely, Cameron Gloss Current Planning Director Page 3 Department: PFA Issue Contact: Carle Dann Topic: Fire Number: 24 Created: 3/27/2006 [3/27/06] ACCESS: A fire lane shall be required for this site. Contact the PFA Fire Prevention Bureau for the construction details of the fire lane. Number: 26 Created: 3/27/2006 [3/27/06] ADDRESS: The address numerals shall be visible from the street fronting the property. They shall be posted on a contrasting background, and a minimum of 6 inches high. Department: Traffic Operations Issue Contact: Eric Bracke Topic: Traffic Number: 1 Created: 3/9/2006 [3/9/06] The Transportation Impact Study for this project has been waived due to minimal peak hour trips being generated. The project also has a capacity reservation on file with the Department pertaining to the intersection of Vine/Lemay Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamdan Topic: Drainage Number: 19 Created: 3/21 /2006 [3/21/06] Please add a note to the plans that a drainage report will be submitted for any future development plans for a more permanent facility. Please address how off -site flows are being routed through the site if any and where the proposed outfall for this site will be. Topic: Floodplain Number: 20 [3/21 /06] Floodplain comments Created: 3/21 /2006 1. Please also show the City's 0.5 foot floodway on the site plan. It is slightly wider than the FEMA 1 ft. floodway. Even with the Dry Creek Diversion project completed, the floodway will still go through this area. It appears that the flight cage building and the fence may be in the 0.5 ft. floodway. If so, the cage will need to be moved out of the floodway or shown to not cause a rise in the 100-year flood elevation. The fence will either have to be moved or be a break -away design. 2. Please provide a detailed grading plan. Depending on which berms are removed and how the grading takes place, it may result in the floodway and floodplain spreading out further across this property. This will need to be planned for if you want to minimize changes to the floodway so that it will not impact your site as you plan future work. 2. A floodplain use permit will be required. The permit fee is $25. 3. Any remodel work done to the former Platte Valley Lumber building will be subject to the substantial improvement policy. If improvements exceed 50% of the structures value (excluding land) then the structure must be elevated or floodproofed 18" above the Page 2 6a STAFF PROJECT REVIEW Cif Fort Collins MICKEY WILLIS Date: 03/30/2006 PARADIGM REAL ESTATE & DEVELOPMENT 2969 SPRING HARVEST LANE FORT COLLINS, CO 80528 Mickey, Staff has reviewed your submittal for ROCKY MOUNTAIN RAPTOR PROGRAM ODP AND FIRST FILING PDP, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Dan DeLaughter Topic: General Number: 8 Created: 3/21 /2006 [3/21/06] Seanability is an issue on both the PDP and ODP. The grayscale and diagonal line patterns should be removed. Topic: ODP Number: 6 Created: 3/21 /2006 [3/21/06] Please show how the site meets Section 3.6.3 (F) of the Land Use Code, or address this standard. Currently, no proposed street connections are shown. If all parcels are included in the ODP, provision of future access should be considered for each parcel, with special consideration given to connections to the existing street network (Main St., Martinez St.). Per our meeting on 3/22/06, the ODP should seek a modification to the LUC standard, and the PDP should show appropriate connections. Number: 7 Created: 3/21 /2006 [3/21/06] A vicinity map must be included on the ODP. Topic: PDP Number: 9 Created: 3/21 /2006 [3/21/06] See redlines for additional comments. Number: 11 Created: 3/21 /2006 [3/21/06] What is the boundary of the PDP? Only a portion of parcel B is shown. Per the 3/22/06 meeting, it is recommended that the boundary of the PDP be reduced to include only the area needed to serve the temporary cages. Cage locations must be coordinated with other departments (stormwater, natural resources). Number: 16 Created: 3/21 /2006 [3/21/06] Label and dimension any Right of Way and easements. Department: Light & Power Issue Contact: Doug Martine Topic: Electric Utility Number: 2 Created: 3/10/2006 [3/10/06] If any new or additional electric service is required, contact Light & Power Engineering (221-6700) to coordinate electric facilities and charges. Page 1