HomeMy WebLinkAboutSEVEN GENERATIONS (FORMERLY EASTBROOK) OFFICE PARK - FDP - 4-06/A - CORRESPONDENCE -[3/7/06] Please specify how much flow is coming from Lot 1 to the south
across the southeast corner.
Department: Stormwater-Water-Wastewater Issue
Contact: Roger Buffington
Topic: Water/Wastewater
Number: 73 Created: 10/ 6/ 2006
[10/6/06] On Sheets 5 8v 6, revise Note 3 by adding the following to the end
of the second sentence: "for a distance of 10 feet each side of the water
main"
Be sure and return all red -lined plans when you re -submit or submit
mylars.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours Truly, Q
Aake y,%V \
Steve Olt
City Planner
cc: Susan Joy .
North Star Design, Inc.
Dave Sitzman
Current Planning File #
Page 3
.uepartment: Natural Resources Issue Contact: Doug Moore
Topic: Utility Plans
Number: 66 Created: 9 / 26/ 2006
[9/26/061 A L.O.D. (Limits of Development) line and L.O.D. protective
fencing needs to be shown on all related drawings (grading, landscape. etc.)..
The limits of grading line shown on the grading plan should work as an
appropriate location. Also include L.O.D. protective fencing detail on the
detail sheet. Nice Site and Landscape Plan, this is a vast improvement over
the earlier project.
Department: PFA Issue Contact: Carie Dann
Topic: fire
Number: 71 Created: 10 / 4 / 2006
[10/4/06] No additional comments or concerns.
Department: Transportation Planning Issue Contact: David Averill
Topic: General
Number: 60 Created: 4/25/2006
[ 10/ 3 / 06] Still ready for hearing.
[4/25/06] No further comments. Ready for hearing.
Department: Stormwater-Water-Wastewater Issue
Contact: Basil Hamdan
Topic: Erosion Control
Number: 70 Created: 10 / 3 / 2006
[10/3/06] September 26,.2006
1. The construction entrance you show on the northeast (east) side of the
site should be placed further south at the other eventual site entrance
which is uphill, so the silt fencing isn't breached at a lower point.
Topic: Maintenance access
Number: 72 Created: 10 / 4 / 2006
[10/4/06] Maintenance access to the drainage outfall by the railroad tracks
is impeded by the proposed shrubs, please provide a 12 foot break in shrub
plantings as well as a 12 foot wide drivable surface strip to the railroad
tracks.
Topic: Stormwater - Off -site flows
Number: 27 Created: 3 / 7/ 2006
[9/22/06] Make sure any spill from existing building to the south is routed
to Eastbrook Drive and not into this projects parking lot.
Show basin to the south, make sure it drains to the east, and not into site.
OK to submit mylars.
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
VF Ripley Associates Date: 10/ 10/2006
c/o Joanna Frye
401 West Mountain Avenue, #201
Fort Collins, CO. 80521
Staff has reviewed your submittal for SEVEN GENERATIONS OFFICE
PARK - FINAL PLANS (FORMERLY EASTBROOK OFFICE PARK), and we
offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 33 Created: 3 / 7 / 2006
[9/26/061 Please submit the legals & exhibits for each of the easement
dedications along with the completed TDRF application.
[4/ 18/06] Final Compliance comment -just carrying this through until
then.
[3/7/06] Please provide legals and exhibits for all easements being
dedicated by separate document for our review.
Number: 34 Created: 3/ 7/ 2006
[9/26/06]
[4/ 18/06] Final Compliance comment -just carrying this through until
then.
[3/7/06] All easements to dedicated by separate document have a $250
processing fee each plus the appropriate Larimer County filing fee.
Number: 67 Created: 9/26/2006
[9/26/061 I can email you the Development Agreement (DA) Information
sheet if you email me at sjoy@fcgov.com. Please fill it out and fax or email it
back to me when convenient and we can start on the DA.
Number: 68 Created: 9 / 26 / 2006
[9/26/061 Will you be starting construction soon? If so, we can start on the
Development Construction Permit. I can email all of that information as
well. If the project is going to wait awhile, then call us when you're ready
and we'll fill everything out then.
Number: 69 Created: 9 / 27 / 2006
[9/27/061 Change the name on all plan sets to match the new title.
Page 1