HomeMy WebLinkAboutSEVEN GENERATIONS (FORMERLY EASTBROOK) OFFICE PARK - FDP - 4-06/A - SUBMITTAL DOCUMENTS - ROUND 1 - REVISIONS57. The 4 lot comers have been labeled.
55.All easement labels match the civil plans.
54.This comment was removed per an email from Susan Joy on May 24, 2006.
There is no street stationing, so the drives cannot be stationed.
25.A note has been added to minimize the grading on the north.
20. The pond is completely within the proposed easement.
61. The utility plan has been modified to utilize the existing stub as a fire line for the
southeast building.
3. All plant material has been labeled.
Joanna Frye
Project Manager
V.F. Ripley Associates, Inc.
Mike Oberlander
Project Manager
North Star Design, Inc.
V FF:Up IeynaH IATes ING
Landscape Architecture Urban Design Planning
September 6, 2004:11,
Mr. Steve Olt
Fort Collins Planning Department
281 North College Avenue
Fort Collins, CO 80524
7 Generations Office Park
Response to staff Project Review comments
Dear Mr. Olt,
We have reviewed the staff letter dated May 15, 2006 and have the following
comments:
ITEM: A total of 56,000 square feet of office uses in 3 separate buildings on 3.6
acres at Eastbrook Drive and Vermont Drive
COMMENTS:
61. The 24' drive is proposed to be the fire lane, but is within a much larger utility,
drainage, access and emergency access easement.
17. Evergreen trees have been added along the west side. Native shrubs and trees
add adequate screening.
63. Noted.
64. Noted.
13. Noted.
45.The proposed easement completely surrounds the property
46.The proposed easement will be dedicated during FCP.
57. All details requested have been added (except for 702 which is not needed).
56. Ratios have been added (with leaders).