Loading...
HomeMy WebLinkAboutSEVEN GENERATIONS (FORMERLY EASTBROOK) OFFICE PARK - FDP - 4-06/A - SUBMITTAL DOCUMENTS - ROUND 1 - REVISIONS57. The 4 lot comers have been labeled. 55.All easement labels match the civil plans. 54.This comment was removed per an email from Susan Joy on May 24, 2006. There is no street stationing, so the drives cannot be stationed. 25.A note has been added to minimize the grading on the north. 20. The pond is completely within the proposed easement. 61. The utility plan has been modified to utilize the existing stub as a fire line for the southeast building. 3. All plant material has been labeled. Joanna Frye Project Manager V.F. Ripley Associates, Inc. Mike Oberlander Project Manager North Star Design, Inc. V FF:Up IeynaH IATes ING Landscape Architecture Urban Design Planning September 6, 2004:11, Mr. Steve Olt Fort Collins Planning Department 281 North College Avenue Fort Collins, CO 80524 7 Generations Office Park Response to staff Project Review comments Dear Mr. Olt, We have reviewed the staff letter dated May 15, 2006 and have the following comments: ITEM: A total of 56,000 square feet of office uses in 3 separate buildings on 3.6 acres at Eastbrook Drive and Vermont Drive COMMENTS: 61. The 24' drive is proposed to be the fire lane, but is within a much larger utility, drainage, access and emergency access easement. 17. Evergreen trees have been added along the west side. Native shrubs and trees add adequate screening. 63. Noted. 64. Noted. 13. Noted. 45.The proposed easement completely surrounds the property 46.The proposed easement will be dedicated during FCP. 57. All details requested have been added (except for 702 which is not needed). 56. Ratios have been added (with leaders). Phone 970.224.5828 Fax 970.224.1662 401 West Mountain Ave. Suite 201 Fort Collins, CO 80521-2604 vfripley.com