Noted
11. The request will be subject to the Development Review Fee Schedule that is available in the Community
Development and Neighborhood Services office. The fees are due at the time of submittal of the required
documents for the appropriate development review process by City staff and affected outside reviewing
agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal.
Noted
12. When you are ready to submit your formal plans, please make an appointment with Community
Development and Neighborhood Services at (970)221-6750.
Noted
feet of clearance with streetlights. Contact Light and Power engineering for the streetlight design.
Shade trees and ornamental trees meet clearance requirements for lights as shown on plans.
Current Planning
Contact: Pete Wray, 970-221-6754, pwray(a?fcgov.com
1. The site is located in the Low Density Mixed -use Neighborhoods (LMN) Zone District. Single-family
detached dwellings and two-family dwellings are subject to Administrative (Type 1) review in the LMN Zone
District. The overall minimum average density of 4.0 dwelling units per net acre of residential land. The
proposed density of 4.51 falls within the range allowed in LUC.
Density has changed to 4.28. within allowable range.
2. The proposed project is located within the East Mulberry Corridor Plan, designated LMN. The property to
the south is designated Employment.
Noted
3. International Blvd. is classified as a minor arterial, that connects to Timberline Road (4-Ln./6-Ln. Arterial). -
see Engineering Comment.
Noted
4. If a street connection to Dry Creek subdivision north of Macinac St. is not feasible, a pedestrian connection
in lieu of shall be provided.
Pedestrian connection provided as well as street connection to Mackinac. St.
5. Proposed loop trail should include stub -out for future connnection to International Blvd. and planned trail
network to the south.
Stub outs provided at north and south end of trail on east side of site
6. The proposed development project is subject to a Type 1 review and public hearing, the decision maker
for Type 1 hearings is an Administrative Hearing Officer. The applicant for this development request is
not required to hold a neighborhood meeting for a Type 1 hearing, but if you would like to have one to
notify your neighbors of the proposal, please let me know and I can help you in setting a date, time and
location for a meeting. Neighborhood Meetings are a great way to get public feedback and avoid
potential hiccups that may occur later in the review process.
Noted. no meeting was organized.
7. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color
coded flowchart with comprehensive, easy to read information on each step in the process. This guide
includes links to just about every resource you need during development review.
Noted
8. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code
(LUC), including Article 3 General Development Standards. The entire LUC is available for your review on
the web at hftp://www.colocode.com/ftcollins/landuse/begin.htm.
Noted
9. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard
Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of
the LUC for more information on criteria to apply for a Modification of Standard.
No modifications needed
10. Please see the Submittal Requirements and Checklist at:
3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and
gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of
Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements and/or prior
to the issuance of the first Certificate of Occupancy.
Noted
4. Please contact the City's Traffic Engineer, Joe Olson (224-6062) to schedule a scoping meeting and determine
if a traffic study is needed for this project. In addition, please contact Transportation Planning for their
requirements as well.
Noted
5. Any public improvements must be designed and built in accordance with the Larimer County Urban Area
Street Standards (LCUASS). They are available online at:
http://www.larimer.or_q/engineering/GMARdStds/UrbanSt.htm
Noted
6. Utility plans will be required and a Development Agreement will be recorded once the project is
finalized.
Noted
7. A Development Construction Permit (DCP) will need to be obtained prior to starting any work on the site.
Noted
8. This project is responsible for dedicating any right-of-way and easements that are necessary for this
project. Mackinac Street appears to have less right of way than the local standard of 51'. All streets
within this project will be required to meet our minimum right of width standards. It appears that Right of
Way will be required from the subdivision to the south in order to take access onto International as shown
on the sketch.
Noted. The local roads have a 53' ROW to accommodate the rollover requirement.
9. Sidewalk should be detached in this project and meet our standard cross sections for local streets.
The Dry Creek Subdivision takes its single point of access off of International Boulevard and this project
is proposing to take access off of International and through Dry Creek which also takes access off of
International which results in only a single point of access. Please discuss with Poudre Fire Authority
about access into the site.
This has been accepted as it improves access to Dry Creek. (see PFA comments)
Department: Electric Engineering
Contact: Justin Fields, 970-224-6150, ifields(&fcgov.com
1. Electric development charges will apply. An estimator for these charges is available at
http://www.fcgov.com/utilities/business/bu ilders-and-developers/plant-investment-development-fees/elec
tric-development-fee-estimator.
Noted
2. Coordinate service locations with Light and Power Engineering, 970-221-6700.
Noted
3. All shade trees must maintain 40 feet of clearance with streetlights and ornamental trees must maintain 15
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex(a)fcgov.com
An Ecological Characterization Study is required by Section 3.4.1 (D)(1) as the site is within 500 feet of a
known natural habitat (ditches and wet meadows). Please note the buffer zone standards range from 50 -
100' for these features, as identified in Section 3.4.1(E) of the Land Use Code, as you proceed with your
site design process.
A 50' buffer zone has been used. All residential lots and neighborhood park structures are outside of this zone.
Please note that the Ecological Characterization Study is due a minimum of 10 days prior to the PDP
submittal.
Noted and submitted on October 11, 2013,
2. Within the buffer zone, according to Article 3.4.1(E)(1)(g), the City has the ability to determine if the
existing landscaping within the buffer zone is incompatible with the purposes of the buffer zone. Please
ensure that your ECS discusses the existing vegetation and identifies potential restoration options. If it is
determined to be insufficient, then restoration and mitigation measures will be required.
Noted
3. With respect to lighting, the City of Fort Collins Land Use Code, in Article 3.2.4(D)(6) requires that "natural
areas and natural features shall be protected from light spillage from off site sources." Thus, lighting from
the parking areas or other site amenities shall not spill over to the buffer areas.
No lighting shown other than street R.O. Ws
4. With respect to landscaping and design, the City of Fort Collins Land Use Code, in Article 3.2.1 (E)(2)(3),
requires that you use native plants and grasses in your landscaping or re landscaping and reduce
bluegrass lawns as much as possible.
Native plants used in palette, grass to be a 80120 fescuelbluegrass mix.
5. Please be aware, the creation or enforcement of covenants that prohibit or limit xeriscape or
drought -tolerant landscapes, or that require primarily turf -grass are prohibited by both the State of
Colorado and the City of Fort Collins.
Noted
Department: Engineering Development Review
Contact: Andrew Gingerich, 970.221-6603, agingerich(a)fcgov.com
1. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit.
Please contact Matt Baker at 224-6108 if you have any questions.
Noted
2. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional
information on these fees, please see: http://www.fcgov.com/engineering/dev-review.php
Noted
Department: Fire Authority
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler(aD_poudre-fire.orq
1. WATER SUPPLY
Fire hydrants must be the type approved by the water district having jurisdiction and the Fire Department.
Hydrant spacing and flow must meet minimum requirements based on type of occupancy.
Noted
RESIDENTIAL REQUIREMENTS: Within the Urban Growth Area, hydrants to provide 1,000 gpm at 20 psi
residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter. 2006
International Fire Code 508.1 and Appendix B
Noted
2. GENERAL FIRE LANE AND ACCESS SPECIFICATIONS
In addition to the design criteria already contained in relevant standards and policies, any new fire lane
must meet the following general requirements:
> Shall be designated on the plat as an Emergency Access Easement.
> Maintain the required 20 foot minimum unobstructed width & 14 foot minimum overhead clearance.
> Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons.
> Dead-end fire access roads in excess of 150 feet in length shall be provided with an approved area for
turning around fire apparatus.
> The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50
feet outside.
2006 International Fire Code 503.2.3, 503.2.4, 503.2.5, 503.3, 503.4 and Appendix D; FCLUC 3.6.2(B)2006
and Local Amendments.
The same emergency access road standards shall apply to alley loaded lots.
NotoU
3. SINGLE FAMILY ATTACHED
Attached single family homes to be fire separated or sprinklered.
Noted
4. PREMISE IDENTIFICATION
New and existing buildings shall be plainly identified. Address numbers shall be visible from the street
fronting the property, plainly visible, and posted with a minimum of six-inch numerals on a contrasting
background.
2006 International Fire Code 505.1
Noted
5. SPECIAL SITE CONDITIONS
Only one point of access is currently available and a second point of access is not proposed or
considered possible at this point in time. This is an pre-existing condition particular to the site and it is
PFA's belief that the proposed subdivision will only improve the current problem by increasing traffic
connections to the neighborhood to the west and move the single point of fire access closer to
Timberline Rd. Therefore, PFA will accept the current condition of the site and allow the project to
proceed with only one point of access.
Noted
however the use of any of the BMPs is encouraged.
EDB used and outlet structure designed accordingly
4. Low Impact Development (LID) requirements went into effect March 11, 2013. These require a higher
degree of water quality treatment for 50% of the new impervious area and 25% of new paved areas must
be pervious. Please contact Basil Hamdan at 224-6035 or bhamdan@fcgov.com for more information.
There is also more information on the EPA web site at: http://water.epa.gov/polwaste/green/bbfs.cfm?
goback=.gde_4605732_member_219392996.
LID design information can be found on the City's web site at:
http://www.fcgov.com/utilities/business/builders-and-developers/development-forms-gu idelines-regulatio
n s/stormwater-criteria.
For the east side a PLD is proposed with an overflow to the EDB. on the west side the permeable pavers within
the alleys are being used. The EDB on the east side will have a soft bottom pan or constructed wetlands
depending upon the soils report.
5. The drainage outfall for this site is going to be the most difficult issue for the drainage system design.
The design engineer will have to confirm this but it appears it drains south across platted property that is not
developed yet. Then it eventually drains into the medians of International Blvd. and outlets onto another
undeveloped parcel before it gets to the Dry Creek channel north of Mulberry St. With development there will
be an increase in runoff volume which means easements will be needed from all the properties between the site
and the channel built by the City Stormwater Utility.
A Letter of Intent has been obtained for the required easement and an offsite swale flowing south east from the
outlet at International Blvd to the city control ditch has been designed
6. There is also the Lake Canal Reservoir Company ditch that runs along the eastern property line.
Development is not allowed to drain into irrigation canals. In addition the ditch company will need to approve
the construction plans and may have other requirements such as an easement and access along their ditch.
The contact information from the Larimer County web site lists Don Magnuson as the Superintendent
(970)352-0222, Rodney Nelson as President, (970)482-4108, PO Box 104, Lucerne Co 80646, and Dale
Trowbridge as the Office Manager (970)352-0222.
The appropriate signature block has been added
7. The city wide Stormwater development fee (PIF) is $6,390.00/acre ($0.1467/sq.-ft.) for new impervious area
over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.-ft.) review fee. No fee is charged for existing
impervious area. These fees are to be paid at the time each building permit is issued. Information on fees can be
found on the City's web site at
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-fees or contact Jean
Pakech at 221- 6375 for questions on fees. There is also an erosion control escrow required before the
Development Construction permit is issued. The amount of the escrow is determined by the design engineer, and
is based on the site disturbance area, cost of the measures, or a minimum amount in accordance with the Fort
Collins Stormwater Manual.
Noted
8. The design of this site must conform to the drainage basin design of the Dry Creek Master Drainage Plan
as well the Fort Collins Stormwater Criteria Manual.
Noled
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffingtona().fcgov.com
1. Water and wastewater services in this area are provided by the ELCO Water District and the Boxelder
Sanitation District.
Noted: Appropriate signature blocks added
Department: Transportation Planning
Contact: Ward Stanford - Traffic, ,
1. Traffic: A TIS will be required. The chosen Traffic Engineer will need to contact Ward Stanford to schedule
a scoping session.
Noted
2. Traffic: The TIS will need to evaluate the Lemay and Vine intersection. The intersection is approaching
failing LOS standards.
Noted
3. Traffic: The TIS will need to evaluate the Timberline and International intersection and may need to
evaluate the Timberline and Vine intersection.
Notec
4. Traffic: Traffic Operations will be looking at sight distance aspects of roadway alignments and
landscaping design.
Noted
Department: Stormwater Engineering
Contact: Glen Schlueter, 970-224-6065, gschlueter(a)fcgov.com
1. A drainage report, erosion control report, and construction plans are required and they must be prepared
by a Professional Engineer registered in Colorado. The drainage report must address the four -step
process for selecting structural BMPs. Standard operating procedures (SOPs) for all onsite drainage
facilities need to be prepared by the drainage engineer and there is a final site inspection required when
the project is complete and the maintenance is handed over to an HOA or another maintenance
organization. The erosion control report requirements are in the Fort Collins Stormwater Manual, Section
1.3.3, Volume 3, Chapter 7 of the Fort Collins Amendments. If you need clarification concerning this
section, please contact the Erosion Control Inspector, Jesse Schlam at 224-6015 or ischlam aafcgov.com.
Noted. and will be submitted with final compliance documents.
2. Onsite detention is required for the runoff volume difference between the 100 year developed inflow rate
with the 2 year historic release rate. In the Dry Creek basin the two year historic release rate is 0.2
cfslacre.
Noted and designed accordingly.
3. Fifty percent of the site runoff is required to be treated using the standard water quality treatment as
described in the Fort Collins Stormwater Manual, Volume 3 - Best Management Practices (BMPs).
(http://www.fcgov.com/utilities/business/bu ilders-and-developers/development-forms-g uidelines-regulati
ons/stormwater-criteria) Extended detention is the usual method selected for water quality treatment;
City of
Fort Collins
� -
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
September 16, 2013
Craig Russell
Russell + Mills Studios
141 S. College Ave, Suite 141
Fort Collins, CO 80525
Re: Vine Dr & Timberline Rd - Single Family
Description of project: This is a request to create single family lots located on land south and west of the
Timberline Road and Vine Drive intersection (Parcel# 87082-00-048). The overall site is 39.5 acres and
would contain 168 single family lots in four housing types. The site is located in the Low Density Mixed -Use
Neighborhood (L-M-N) Zone District. Single family homes are subject to Administrative (Type 1) review in the
LMN Zone District.
Please see the following summary of comments regarding the project request referrenced above. The
comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed
components of the project application. Modifications and additions to these comments may be made at the
time of formal review of this project. If you have any questions regarding these comments or the next steps in
the review process, you may contact the individual commenter or direct your questions through the Project
Planner, Pete Wray, at 970-221-6754 or pwray@fcgov.com.
Comment Summary:
Department: Zoning
Contact: GaryLopez, 970-416-2338, glopez(a)fcgov.com
1.Will there be ped. access from the street sidewalks to the trail?
Yes, severai access points throughout the site will link to the trail. Three "spines" through the site will also move
people out to the outside opens space and trail.
2. A subdivision entry sign can only be placed on common property of the proposed subdivision. In other
words the entry sign cannot be placed at the International/proposed n-s road (leading your subdivision)
intersection.
The subdivision entry sign has been placed at the south entry street (Mexico Way) within the property boundary.