Loading...
HomeMy WebLinkAbout132 W. WILLOX - FDP - 19-06/A - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETFINAL PLANC ROUTING SHEET � ✓/��� Item: Z/.l%i �/� 1� G t�1 l`A� — f". li�i, S'tat &3a This project went to / has been scheduled for Public Hearing on (I UNI T-, , The following table lists final plan submittal requirements for this project. A final fee of $1,000.00 is required at the time of submittal unless otherwise waived or reduced. Fee Waiver/R uction A proval: Amount: Date: Planner: ra ,O�i File: Project Planner Building Inspection . ■■i.�7■�■■lei■n■■■■■■ Engineering ■■n■■�■©�c�an■s■■■■■■ Engineering Pavement Iwo ogiq CAS ■�■■■■ice■�■■■■■■ Natural ResourcesNeighborhood ��'i■■■'■■■111a�i■�■■■■■■■ Scrvices� MUMV a -I I I: ■��a■■n■■■cci■■■■■■■■ Poudre Fire Authority 1�■l�■■■■■■�■■■■■■ Stormwater ■■w■■a©■■�a■�■■■n■■■ Technical Services �■ca■■■■■�a■�■■■ ■■■■ Traffic :. ■tea■■■■■�a■■i■■■■■■■ Water District: Water Conservation County Assessor CDOT Ditch Co.. ■■■■■■■■■■■ Schools: Poudre Thompson ■■■■■■■■■■■■■■■ TOTAL To be Submitted in, FAMMI MENNEN d