HomeMy WebLinkAboutFREY STREET COTTAGES SUBDIVISION - FDP - 17-06/A - CORRESPONDENCE - (5)Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 27 Created: 7/21 /2006
[2/21 /07]
[1/5/07] Repeat Comment
[9/14/06] 1 can help coordinate this meeting.
[7/21/06) The invert of the detention pond needs to be higher than the normal operating
water level in the Larimer County Canal #2. Verification from a Larimer County Canal #2
representative of this water level is required. I suggest a meeting at the site with all
necessary representatives to determine this elevation. /otdrdss2d a,\ Ska-aA- 4, Lrenpe^�
dJofe #2
Number: 44 Created: 7/28/2006
[2/23/07]
[1/5/07] Reminder Comment.
[9/14/06] Reminder comment.
[7/28/06] The Larimer County #2 Canal company will need to approve and sign the utility
plans. OK_
Number: 78 Created: 1 /5/2007
[2/23/07]
[1/5/07] Please use the current revised water quality outlet structure detail. An electronic
copy can be emailed to you. DL
Number: 79 Created: 1 /5/2007
[2/23/07]
[1/5/07] Please coordinate with the Stormwater Department on the detail for the area inlets.
Electronic Inlet details can be emailed as well. Or —
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: WaterlWW
Number: 57 Created: 9/8/2006
[2/12/07] (Repeat comment... again)
[1/2/07] (Repeat comment)
[9/8/06] Move area inlet in Frey to provide 5 feet (minimum) separation from the existing
water main. PC
Besure and return all of your redlined plans when you re -submit. I will not require a formal
submittal to wrap this project up but you must submit directly to me 5 sets of plans, redlines
and responses to this comment sheet for the above reviewers to review. We will need two
weeks to review. Assuming all issues have been addressed, we will let you know that you
are ready to proceed to mylars.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6206.
Sincerely,
Arine H. en/
City Planner
Page 3
[1/8/07] Please provide radii and all spot ele ations per LCUASS Figure 7-27 at the
intersection of Frey & LaPorte.1Wed to
Number: 88 Created: 1 /8/2007
[2/6/07] Repeat comment.
[1/8/07] Show and label the approximate limits of street cut to construct Frey where it ties
into Laporte. Please add the City standard street cut note to the Frey Street Plan. Note is
attached to the redlines. More No� -*- sa.wcc,,A shoa.a�.
Number: 90 Created: 2/5/2007
[2/5107] Please refer to sheet 6, street design for Frey Street - The City has determined that
the elevations on Laporte will be slightly lower when the street is reconstructed in the near
future. A design elevation of 5047.79 was provided to you prior to the last submittal which is
the future elevation at the westerly PC on the southwest corner. You will need to design and
build to that future elevation for the drainage to work properly once Laporte is reconstructed
by the City. Please revise the plan to show this elevation and how the new curb and gutter
will tie back into the existing curb and gutter on Laporte. !e4ANep
Number: 91 Created: 2/6/2007
[2/6/07] Please call out the new proposed H.C. ramps with LCUASS standard drawing 1606
on the street plan for Frey Street. A"4
Number: 92 Created: 2/6/2007
[2/6/07] Please remove the intersection detail LCUASS drawing no. 708 and replace with
Figure 7-28 detail. �r,e
Number: 93 Created: 2/6/2007
[2/6/07] Need to add a type 11 barricade at the end of the sidewalk on Frey.
Topic: Technical Services
Number: 98 Created: 2/14/2007
[2/14/07) Please add a reference note to the Plat regarding allowable uses within the
wildlife buffer zone. See redlines for note language and code reference. bene
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 97 Created: 2/13/2007
[2/13/07] PFA has no further comments or concerns.
Department: Stormwater-Water-Wastewater Issue Contact: Glen Schlueter
Topic: Stormwater
Number: 99 Created: 2/23/2007
[2/23/07] Red lines were not returned for the Feb. submittal. A drainage report was
requested last week but was not submitted to Stormwater so the Engineering copy was
reviewed. There was no mention of verification of the outfall depth and no discussion of why
the cross pan was removed allowing water off of LaPorte to drain onto Frey. This change
requires changes to the drainage analysis. I had a phone conversation with Jerry from
Stewart and Associates when we requested the drainage report. He thought Wes had made
the comment to remove the cross pan at Laporte. Wes didn't make that comment so we are
not sure how Jerry thought that. He told me that he saw a redline comment so I guess we
need to see the redlines. nQQ�tn P��d(4SJ, RRA
1+ 0 r o u(- 4 (( 1 S a n sips i-4 u, Cn k",r4 N0,t*- *2
Page 2
STAFF PROJECT REVIEW
Citvoi Fort Collins
JACK BLAKE Date: 02/23/2007
STEWART AND ASSOCIATES
103 S. MELDRUM ST.
FORT COLLINS, CO 80521
Staff has reviewed your submittal for FREY AVE. COTTAGES SUBDIVISION PDP - TYPE I
AND FINAL PLANS, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Anne Aspen
Topic: General
Number: 94 Created: 2/12/2007
[2/12/07] The following departments/agencies have no further comments at this time:
Comcast, GIS, County Assessor, Xcel Energy and Forestry.
Number: 95 Created: 2/13/2007
[2/13/07] Xcel Energy comments as follows: "Existing 4" MW gas main lays 21' west of
east property line of Frey Street."
Topic: Site Exhibit
Number: 96 Created: 2/13/2007
[2/13/07] Maximum height in the NCL zone is 2 stories, not 30 feet. A story is defined in the
Land Use Code as no more than 12.5 feet, so the maximum height in feet would be 25 feet._
Department: Current Planning Issue Contact: Dana Leavitt
Topic: Landscape plan
Number: 75 Created: 1 /2/2007
[2/2/07] Address protection of significant existing trees where other trees will be removed.
Several trees to be removed are very close to trees to remain. Need to identify protection
measures specifically for such trees.
[1/2/07] Describe tree protection methods in areas where other trees are to be removed.
Need to ensure that removing one tree does not damage another tree.
Department: Engineering Issue Contact: Randy Maiziand
Topic: Engineering
Number: 85 Created: 1 /8/2007
[2/6/07] Drainage report does not address flows coming off of Laporte going into the new
proposed inlet on Frey.-� -ioes no+ go -[o (n.(-'AS an, to,j-.er.
[1/8/07] If Laporte drainage is intended to be conveyed to Frey and into the proposed inlet,
have the inlets and storm drain been sized to carry these flows? Please provide hydrology
calc's to verify this.
Number: 86 Created: 1 /812007
[2/6/07] Intersection has changed to a T intersection without a pan. Still need to show all
spot elevations and dimensions per LCUASS 7-28. You can show this on the current plan or
provide a separate intersection detail showing all of the required elevation, dimension and
slope information. TiotW j�Aa V_,e� ojjpcl aja., - o pry jcc:-
&L-� tD #Vkj� '7- Z 6 rTertrA2n5