Loading...
HomeMy WebLinkAbout606 S. HOWES STREET BOARDING HOUSE - FDP - 18-06 - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATIONCitv of� Transportation Development Review Fee Date Received/ Paid �-G6 Total Amount PaidC�Z Project Name: f S naves t3a:,zo:v� l�ols� /G Project Location: COL S tiro u� s �t c� Date: ((� 171�O e -- Type of Submittal Please indicate the type of application submitted by checking the box preceding the appropriate request(s). Fee structure amount due ❑ Overall Development Plan (ODP) $500 each e Final Development Plan (FDP) a- This fee includes 2 rounds of review $1000 each 1ut�y ❑ Additional round of review $ 500 each ❑ Annexation $20 x _ acres = _ + $250 = ❑ Minor Amendment $250 each ❑ Major Amendment $2,500each ❑ Re -zone S200 each ❑ Modification to Land Use Code S200 each ❑ Wireless Telecommunication Equipment (WTE) $65 each ❑ Road Projects acres (of roadway) X S250 = ❑ Vacation of Easement(s) '*' # of vacations _ X $400 = ❑ Vacation of Right(s)-of-Way "* # of vacations _ X 3800 = 4 Dedication ofEasement(s) and/or Rights) -of -Way *** # of dedications 1 X 3250 = O- L *'* This fee does not include the cost of filing fees. Filing fees shall be determined at the time of final document submittal and will be required prior to filing. ❑ Project Development Plan (PDP) or Basic Development Review Project requiring Transportation Services Review and/or utility plan review. This fee includes 3 rounds of review. Detached Single Family $160 per unit # of units X 3160 = Multifamily or other residential units 5115 per unit # of units X $115 = Commercial, Industrial, Retail, and/or Non residential building square footage $0.25 per square foot sq ft X $0.25 = Size of the development (area being platted or if not being Platted size of parcel accompanying all development improvements) $250 per acre acres X $ 250 = Project fee $2,000 each $2-000 Total of above amounts If this fee amount exceeds $30,000 then the fee amount shall be adjusted with the following formula: $30,000 + /_ (the amount over 30,000 The maximum fee for any residential ONLY project shall be $500 per residential unit This check should be used to verify the fee amount (does not apply to mixed -use developments). PDP fee shall be the lesser of this amount or the above calculated amount. # of residential units X 5500 = Reduction for affordable housing - a copy of the City letter certifying/ authorizing the affordable housing shall be provided with this application. Amount of reduction to be applied Land Use Information: Total number of single family detached units: Total number of multifamily/other residential units: _ Total number of certified affordable dwelling units (a copy of the letter/ authorization is required): Non residential building square footage: sq it Gross Acreage: acres General Information: Owners Name(s): Street address: City/State/Zip: Telephone: Fax: Applicants/ Consultants Firm Name: Contact . Street address: City/State/ Zip: Telephone: Fax: Certification: By signing this permit I acknowledge that I am amgl with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or. associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection. Name (please print): Signature: Telephone: cc: Christie White, Engineering Development Review Engineering Total owed for PDP $�