HomeMy WebLinkAboutPADS AT HARMONY - PDR - - CORRESPONDENCE -0 0
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely: ..�(�,��
`
T'x4/ _"_
Ted Shepard
Chief Planner
Page 7
specifically located within a Convenience Shopping Center as defined in the Land Use
Code. (Such a center must have seven or fewer acres and include four or more separate
business establishments.)
Since the site is located between two approved retail centers however, Staff is willing .
to support Modifications to allow a limited amount of retail and standard restaurants, but only
if reconfigured in the following manner:
A. The retail use shown on the westerly 4.5 acres should be shifted over to the
easterly 3.5 acres.
B. This easterly tract should then be designated the "Convenience Shopping Center"
and designed in such a way as to meet the definition.
C. A Convenience Shopping Center is allowed in the Basic Industrial Non -Retail
Employment Activity Center in the Harmony Corridor zone but only as a secondary use
and shall not occupy more than 25% of the gross area of the development plan. Staff
is willing to support a Modification to this standard.
D. There should be no retail on the westerly tract.
E. The standard restaurants on the westerly tract are allowed but only as a secondary
use and are not to exceed 25% of the gross area of the development plan. Staff is
willing to support a Modification to this standard.
Please be aware of the criteria by which the Planning and Zoning Board may grant
Modifications. These criteria are outlined in Section 2.8 of the Land Use Code.
2. As a center, the project is limited to a maximum of 5.00 spaces per 1,000 square feet
of gross leasable area. Parking ratios are not determined by the individual uses per
building.
3. Staff is very reluctant to support a Modification to the 80 foot setback along Harmony
Road to allow a ten foot reduction to 70 feet, especially given the pending retail
developments to the east and west. Documentation, in the form of an alternative site plan
that complies with the standard, would have to be provided for Staff analysis. This
alternative plan would then be compared and contrasted with the plan that incorporates the
Modification. Any such Modification request would have to be accompanied by a landscape
plan that qualitatively exceeds the baseline standards.
4. Connecting walkways need to be provided from the buildings out to the public sidewalk
along Harmony Road.
5. A neighborhood information meeting will be required. Staff will provide the affected
property owners map so that we can schedule the meeting for July 20, 2006.
6. The landscape plan should provide screening for cars circulating through the two
proposed bank drive -up facilities.
7. The architectural character elevations look terrific and demonstrate a unifying and
cohesive design that fulfills the vision of the Harmony Corridor Plan.
Page 6
sized and located along the western boundary of that development taking flows north from
this site and into the Front Range Shops detention ponds.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: Water/WW
Number: 23 Created: 6/21/2006
[6/21/06] Information on existing water/sewer mains has been provided previously.
Number: 24 Created: 6/21/2006
[6/21/06] Water main must be looped through the site from Harmony School Shops to the
Bayer site.
Number: 25 Created: 6/21/2006
[6/21/06] There is an 8-inch sewer on the Harmony School Shops site to the west. City is
currently investigating the status of the 21" sewer on the Harmony Mobile Home Park site to
determine if it is public or private.
Department: Zoning Issue Contact: Peter Barnes
Topic: Zoning
Number: 1 Created: 6/20/2006
[6/20/06) The site is in the neighborhood sign district. The architectural character
elevations need to show proposed wall sign locations on elevation drawings.
Number: 2 Created: 6/20/2006
[6/20/06] Office uses are subject to Type 1 review. Retail uses are only allowed in
shopping centers in the HC zone. This is in a Basic Industrial and Non -retail activity center,
wherein convenience shopping centers are the only allowed type of shopping center, and
then as a secondary use. That means they can't occupy more than 25% of the total gross
area of the development.
Number: 3 Created: 6/20/2006
[6/20/06] Need to plat the property.
Number: 4 Created: 6/20/2006
[6/20/06] Staff is concerned about the light intrusion from a commercial center into the
mobile home park to the north. The lighting design needs to be sensitive to this residential
proximity. For example, mitigation should include specifying that parking lot light pole light
fixtures along the north side of the parking lot (if any are proposed) need to have a "house
side" (drop down) shield on the north side, and the pole height should be kept as low as
possible. Other measures include lighting timers and reduced wattages.
Number: 5 Created: 6/20/2006
[6/20/06] The two handicap parking spaces in the center row of parking should be moved
closer to a building. If possible, they shouldn't be located where a person has to cross a
drive aisle. There does appear to be other places they could be relocated to.
Department: Current Planning Issue Contact: Ted Shepard
1. The site is located in the Basic Industrial and Non -Retail Employment Activity Center
as per the Harmony Corridor Plan. In other words, it is not located in one of the approved
Neighborhood, Community, or Regional Shopping Centers. Retail is not allowed unless
Page 5
0
and enforceable. (3) Be designated on the plat as an Emergency Access Easement (4)
Maintain the required minimum width of 20 feet throughout the length of the fire lane.
Number: 28 Created: 6/22/2006
[6/22/06] WATER SUPPLY: Fire hydrants, where required, must be the type approved by
the water district having jurisdiction and the Fire Department. Hydrant spacing and water
flow must meet minimum requirements based on type of occupancy. Spacing and flow
requirements include: Commercial, 1,500 g.p.m. at 20 p.s.i. residual pressure, spaced not
further than 300 feet to the building, on 600-foot centers thereafter.
Number: 29 Created: 6/22/2006
[6/22/06] AUTOMATIC FIRE SPRINKLERS: Because access is inadequate, all proposed
buildings shall be equipped with an approved, automatic fire -sprinkler system. The sprinkler
FDCs shall be located where they are easily accessible to fire apparatus.
Number: 31 Created: 6/22/2006
[6/22/06] KNOX BOX: Poudre Fire Authority requires a "Knox Box" to be mounted on the
front of every new building equipped with a required fire sprinkler system or fire alarm
system.
Number: 32 Created: 6/22/2006
[6/22/06] ADDRESSING: Address numerals shall be visible from the street fronting the
property, and posted with a minimum of six-inch (6) numerals on a contrasting background.
(Bronze numerals on brown brick are not acceptable). PFA requires that address numerals
for this project be mounted on the Harmony Road side of the buildings and also the fire lane
(north) side of the buildings.
Number: 33 Created: 6/22/2006
[6/22/06) COMMERCIAL COOKING: With the production of grease -laden vapors, an
approved, automatic fire -extinguishing system shall be provided for the protection of
commercial -type cooking equipment.
Department: Stormwater-Water-Wastewater Issue Contact: Basil Harridan
Topic: Stormwater
Number: 21 Created: 6/21/2006
[6/21/06] This proposed plan does not show any area reserved for water quantity or quality
detention on site. It is assumed that these will take place on the neighboring Front Range
Village (Bayer Property) development to the east. As such, if this project precedes the Front
Range development, then it will need to secure off -site easements and provide on site or off -
site detention on its own.
Since this project is dependent on the Front Range Village storm drainage infrastructure to
be in place at time of development, strong coordination between the two sites will be
needed.
It is suggested that meetings be set up with the Stormwater Utility to discuss the viability and
appropriateness of the drainage system once the design of the outfall system is decided
upon and prior to plan submittal.
The proposed Front Range development has extensive berming to the west side of their
property, in order to tie into their storm drainage system, a swale or a storm sewer should be
Page 4
Number: 35 Created: 6/27/2006
[6/27/06] Engineering staff believes that Snow Mesa should be dedicated as a public street
meeting all City standards. Once accepted, the City would take over the maintenance
responsibility for this street. In order to meet the intent of the Larimer County Urban Area
Street Standards (LCUASS), which states that a public street shall terminate in a cul-de-sac,
staff would encourage the use of a roundabout where Snow Mesa intersects the circulator
drive. We feel that this would be the most ideal solution for providing the circulation and
definition at the intersection. The roundabout should be designed to accommodate fire
trucks and mobile homes. City staff does not believe that the existing pavement on Snow
Mesa would meet our current standards, and it would be the applicant's responsibility to
determine the existing pavement condition and cross-section if there is a desire to leave any
pavement in place.
Number: 36 Created: 6/27/2006
[6/27/06] The extent of the Harmony Road ROW dedication cannot be determined until a
design is completed. Harmony School Shops has dedicated about 32 feet of ROW to the
section line, and Bayer has dedicated about 40 feet. Your property will likely require
something within the range of the adjacent properties.
The easements necessary on the site will depend on the existing and proposed utilities and
drainage. Harmony Rd. does not have a standard cross-section. All pedestrian use areas,
if located outside public ROW, are to be placed in a dedicated public access easement.
If you are able to functionally tie your design into existing adjacent sites, you do not need to
provide the full 1,000 feet offsite design.
The access to this property is intended to serve both the Harmony School Shoppes to the_
West and the Bayer property to the East. The location of your proposed access is
acceptable with regards to the plan, but we would not support the inclusion of any additional
access points to the site, unless absolutely required by Poudre Fire Authority as a second
point of Emergency Access.
The concrete test section has been replaced.
Number: 37 Created: 6/27/2006
[6/27/06] The design considerations that we would recommend for connectivity would be to
ensure that access easements. and emergency access easements are dedicated through
the private drive. Additionally, coordinate with the adjacent property owners to the
maximum extent possible to provide design solutions that work for all property owners. Staff
ismilling to assist in setting up the appropriate meetings with these owners.
Department: PFA Issue Contact: Carle Dann
Topic: Fire
Number: 27 Created: 6/22/2006
[6/22/06] ACCESS: A fire lane is required. This fire lane shall be visible by painting and
signage, and maintained unobstructed. A fire lane plan shall be submitted for approval prior
to installation. In addition to the design criteria already contained in relevant standards and
policies, any new fire lane must meet the following general requirements: (1) Be designed
as a flat, hard, all-weather driving surface (asphalt or concrete) capable of supporting fire
apparatus weights. Compacted road base shall be used only. for temporary fire lanes or at
construction sites. (2) Have appropriate maintenance agreements that are legally binding
Page 3
•
Appendix E-4, the complete construction documentation. Checklist, in LCUASS as this
development request will be subject to the requirements.
Number: 14
Created: 6/21/2006
[6/21/06] A Development Agreement (DA) and a Development Construction Permit (DCP)
will be required for development on this property.
Number: 15 Created: 6/21/2006
[6/21/06] Development on this property will be responsible for the under -grounding of any
existing overhead utility services that are along or on this property. An overhead utility line
was moved to install the signal at the intersection. This project should underground or, at a
minimum, provide conduit for future under -grounding.
Number: 16 Created: 6/21/2006
[6/21/06] Development on this property will be responsible for a repay for the traffic signal
that was recently installed at the intersection of East Harmony Road and Snow Mesa Drive.
Number: 17 Created: 6/21/2006
[6/21/06] Development on this property will be responsible for a repay for any necessary
improvements to Harmony Road. This includes the dedication of ROW and the design and
construction of the improvements, plus the design of improvements for 1,000 feet off -site in
both directions (east and west). Please coordinate with Stantec, the consulting engineer for
Bayer Properties, as to how much of this design has been done so far.
Number: 18 Created: 6/21/2006
[6121/06] East Harmony Road is no longer a Colorado Department of Transportation
(CDOT) roadway. The access control plan still applies, but it is now under the City of Fort
Collins standards for design.
Number: 19 Created: 6/21/2006
[6/21/06] Improvements are needed to Snow Mesa Drive. Development on this property
will be responsible for a reconfiguration of the access so that it works better, i.e. has an
adequate left turn lane, a pedestrian crossing, and a pedestrian refuge if a median is used.
Number: 20 Created: 6/21/2006
[6/21/06] A drive connection from the parking area in this development to the undeveloped
property to the west is needed.
Number: 26
Created: 6/21/2006
[6/21/06] Transportation Development Review Fees (TDRF) will apply to this project and will
be due at the time it is submitted for review. A TDRF application is available online at
hftp://www.fcgov.com/engineering/dev-review.php
Number: 34 Created: 6/27/2006
[6/27/06] The newly installed signal at Snow Mesa and Harmony was paid for by the
Developer to the south. It is the applicant's responsibility to determine whether or not a
repay has been filed for the cost of the signal. The existing signal is intended to serve the
existing conditions, but it may not be suitable to accommodate accel/deccel lanes,
landscaping and sidewalk necessary on your frontage. This will be a determination made
when the project is submitted and we are able to review the design of Harmony.
Page 2
STAFF PROJECT REVIEW
Citv of Fort Collins
GINO CAMPANA
BELLISIMO INC
3702 MANHATTAN AVE #201
FORT COLLINS, CO 80526
Date: 06/28/2006
Staff has reviewed your submittal for HARMONY ROAD AND SNOW MESA DRIVE
PRELIMINARY DESIGN REVIEW, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Dan DeLaughter
Topic:, General
Number: 6 Created: 6/21/2006
[6/21/06] The standard utility plan submittal requirements will apply to this development.
Number: 7 Created: 6/21/2006
[6/21/061 A subdivision plat must be included as part of the PDP submittal documentation
because this property has not previously been platted.
Number: 8 Created: 6/21/2006
[6/21/06] Street oversizing fees will apply to this development request. The fees are based
on vehicle trip generation for the proposed land uses in the development plan. Please
contact Matt Baker in Engineering at 224-6108 for detailed information on the fees. The
fees will be collected at the time of issuance of building permits. Please note that, as with all
fees, the Street Oversizing Fee may be adjusted on an annual basis.
Number: 9 Created: 6/21/2006
[6/21/06] The Larimer County Road Impact Fees will apply to development no this property.
This fee is collected by the City of Fort Collins at the time of building permit issuance.
Number: 10 Created: 6/21/2006
[6/21/06] A Transportation Impact Study (TIS), addressing all modes of transportation, will
be required with your PDP submittal. Please contact Eric Bracke of the Traffic Operations
Department at 224-6062, and Kurt Ravenschlag of the Transportation Planning Department,
at 416-2040, to determine what information will be needed in the TIS pertaining to Level of
Service (LOS) for vehicle, pedestrian, bicycle, and transit modes of transportation.
Number: 11 Created: 6/21/2006
[6/21/06] This property will have to dedicate additional street right-of-way (ROW) for East
Harmony Rd. Also, the necessary easements (utility, drainage, emergency access, etc.)
behind the ROW must be dedicated with the subdivision plat.
Number: 12 Created: 6/21/2006
[6/21/06] This development will be responsible for the repair and replacement of any
damaged curb, gutter, and sidewalk along its street frontages, if any exist.
Number: 13
Created: 6/21/2006
[6/21/06] Any public improvements must be built according to the requirements set forth in
the Larimer County Urban Area Street Standards (LCUASS). Please familiarize yourself with
Page 1