HomeMy WebLinkAboutAGNEW CAR WASH - FDP - 32-06/A - CORRESPONDENCE - UTILITY PLANS (3)[31201071 The water quality pond needs a 2% slope at the bottom of the pond. If this can not be
obtained and still meet the required volume, a minimum of .5% slope can be used with a
drainage pan.
A concrete trickle channel has been added to the water quality pond.
Number: 93 Created: 312012007
[3120107] Please see other minor comments on the redlined plan set.
The redline comments have been addressed.
Comments from Current Planning:
1. Please make the minor revisions on the redlined plans.
The redline comments have been addressed.
Sincerely,
Jones Engineering Associates, Inc.
Brian Krombein, P.E.
Project Manager
c: drrumems and watin n deamm lem/mraq inlet ml fileamlk38f respmse lever 4-10.07dne - 4 -
Some of the floodplain regulations for the Poudre River changed in February: The Product 6
corridor line is no longer regulated. Please remove this line from the plat and plans. The
floodway changed from a 0.1 ft. rise to a 0.5 ft rise. Please revise the floodway line shown on
the plans.
The Product 6 corridor line has been removed from the plans. The 0.5' FEMA floodway
line has been added to and labeled on the plans.
Topic: Stormwater
Number: 86 Created: 312012007
[31201071 Please add text section discussing erosion control measures.
Text discussing the erosion control measures has been added to the drainage report.
Number: 87 Created: 312012007
[3120107] Please add erosion control effectiveness calculations and erosion control escrow
calculation.
Erosion control effectiveness calculations and escrow calculations have been added to the
drainage report.
Number: 88 Created: 312012007
[3120107] Please add the City's standard erosion control notes to the utility plan set.
The City's standard erosion control notes have been added to the plan set.
Number: 89 Created: 312012007
[3120107] Please add the construction schedule to the Erosion Control Plan.
The construction schedule has been added to the Erosion Control Plan.
Number: 90 Created: 312012007
[3120107] Please add a basin and pond summary table to the drainage plan. See redlines.
Basin and pond summary tables have been added to the Drainage Plan.
Number: 91 Created: 312012007
[31201071 Please include the City's standard water quality outlet structure detail in the utility
plan set. Please email meat wlamarque@fcgov.com and I will replay with the detail attached.
The City's standard water quality outlet structure detail has been added to Sheet C7.
Number: 92
Created: 312012007
r documents aml.mugs demnx• iemynrary unreel fi/es olWfreapmise loner 4-10.07.dm - 3 -
Number: 95 Created: 312112007
[3121107] Reminder comment: As stated in the conceptual & preliminary design review
meetings, Mulberry and the frontage road are under CDOT jurisdiction. The City cannot issue a
permit for construction until you have an access permit from CDOT. As stated in the staff review
meeting, I will be meeting with Gloria from CDOT on March 30 and 1 will let her know where
we are in the process and to expect an application from you soon.
Noted.
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric Utility
Number: 80 Created: 31112007
[3111071 The developer will need to coordinate a location for a pad type electric transformer,
and electric requirements and charges with Light & Power Engineering (221-6700).
A transformer location has been added to the plans.
Topic: Landscape Plan
Number: 78 Created: 31112007
[311107] There are 2 existing streetlights along Lemay. The developer will need to field verb
the exact location of these lights, and show them on the landscape plan. The location of street
trees planned on Lemay will need to be adjusted to provide a minimum of 40 feet clearance
between the trees and the lights (1 S feet if the tree is an ornamental).
Topic: Utility Plan
Number: 79 Created: 31112007
[311107] No utility plan was included in the review packet. There is an existing fiberglass
electric vault at the N. W. corner of the lot. If this vault needs to be relocated either vertically or
horizontally, it will be at the developer's expense in addition to normal electric development
charges.
The plan set includes an Overall Utility Plan which shows the location of the electric
vault noted.
Department: Stormwater- Water- Wastewater Issue Contact: Wes Lamarque
Topic: Floodplain
Number: 96 Created.• 312212007
[31221071 The Floodplain needs to be shown on the site plan —please see the Floodplain
development review checklist - REPEAT COMMENT
We did not receive updated MSDS for the chemicals being used. Please resubmit to address our
previous comment: There is one chemical, The Option, that would make this facility a critical
facility because in concentrate form it is considered a corrosive. Please try to find a different
chemical and resubmit that MSDS for review. — REPEAT COMMENT
c: kocumrna and wlmq(s Aeamm lemlxmap• unerm:l files a1k3Rfrrsymaw letter 4-10.07Aa:
r
April 10, 2007
Ted Shepard
City of Fort Collins
Current Planning Department
281 N. College Avenue
Fort Collins, CO 80521
Re: Agnew Carwash
Dear Mr. Shepard:
JONES ENGINEERING
ASSOC., INC-
2120 West Littleton Boulevard, Suite 205
Littleton, Colorado 80120
303-738-0283 • Fax: 303-738-0285
The following is in response to comments received from you dated March 23, 2007 regarding the
third submittal of civil engineering plans for this project. Your comments are in italics and our
responses follow.
If you have any further questions or comments, please do not hesitate to contact me.
Department: Engineering Issue Contact: Randy Maitland
Topic: Engineering
Number: 81 Created: 311912007
[31191071 Please revise line type and text weights for better copy and scanability. See redlines
for clarification.
We printed the mylars in our office to assure appropriate line weights.
Number: 82 Created: 311912007
[3119107] Single point grade breaks cannot exceed 0.4 percent. Please provide additional grade
breaks or a vertical curve on the frontage road profile where proposed meets existing to the east.
See sheet C5 redlines for clarification.
An additional grade break has been provided so no grade break is greater than 0.4 percent.
Number: 83 Created: 311912007
[3119107] Please make minor revisions and plot mylars. Submit mylars with Sanitation District
signatures. Please include redlines with the mylars when submitted.
Mylars are submitted with redlines and signatures from Boxelder Sanitation District.
Number: 94 Created: 312112007
[3121107] Please add Dana Leavitt to the signature block with title. I think it is Natural
Resources or Current Planning. Please verify with Dana as he will be signing these utilityplans.
A signature line has been added for Current Planning.